Tagasi hangete juurde

City Cemetery Kildrum Gardens T ENV 21-063 Contractors PQQ Application

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
Veebruar 14, 2022
Lepingu üksikasjad
Kategooria
Muu
Viide
032047-2022
Väärtus
£885,846
Asukoht
United Kingdom, Ühendkuningriik
Avaldatud
Veebruar 24, 2026
CPV kood
Projekti ajakava

Hange avaldatud

November 11, 2022

Küsimuste tähtaeg

Veebruar 07, 2022

Esitamise tähtaeg

Veebruar 14, 2022

Eelarve
£885,846
Kestus
Pole määratud
Asukoht
United Kingdom
Tüüp
Muu

Algne hanke kirjeldus

The Contract is for the provision of an extension of the existing Derry City Cemetery by construction of approximately an additional 950 burial plots. The development site at Southway Wood, (townland Ballymagowan) is sloped and is currently a mix of semi mature trees and scrub growth. The site is bounded on the northeast side by the existing City Cemetery (Lone Moor Road, BT48 2LA) and is bounded on the northwest by the existing gravel playing field and Kildrum Gardens Community Centre. The development site is approximately rectangular in footprint having an area of 0.915 hectares. The development site will be an extension of the existing cemetery with access to the proposed new burial plots from only the existing cemetery by an extension of the current internal cemetery roadway. The Construction contract will involve site clearance and preparation to facilitate an earthworks exercise to develop the necessary finalised gradients and profiles for the burial plot layout. This is also require construction of sections of modular reinforced block retaining wall. The site will be served by construction of a new bitmac access road linked to the existing internal cemetery roadway. The Contract will require construction of pedestrian footways, steps, handrailing, kerbing, drainage and installation of reinforced concrete plinths for locating head stones. The site will be completed with new perimeter fencing and walls with internal landscaping features and reinstatement. The anticipated contract programme is 9 months. Please refer to cfT documents for further details.

Riskianalüüs

Riskianalüüsi kasutamiseks palun logige sisse.

Logi sisse

Võidustrateegia

Võidustrateegia soovituste kasutamiseks logige sisse.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

AI nõuete analüüs pole veel selle hanke jaoks saadaval.

Nõuded genereeritakse automaatselt, kui hankedokumendid on töödeldud.


Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

Selle hanke jaoks pole töödeldud dokumente saadaval.

Dokumendid ilmuvad siia, kui need on alla laaditud ja analüüsitud.

Analüüs pooleli

Selle hanke kvaliteedianalüüsi töödeldakse. Palun kontrollige varsti uuesti.

Lisa halduspaneelile