Atgal į konkursus

Go Neutral Smart Energy Framework

Uždarytas

Pateikimo terminas pasibaigė

Šio konkurso pateikimo terminas pasibaigė ir paraiškos nebepriimamos. Žemiau pateikta informacija saugoma informaciniais tikslais.

Naršyti aktyvius konkursus
Galutinis terminas
Pasibaigęs
Sausis 18, 2022
Informacija apie sutartį
Kategorija
Kita
Nuoroda
004143-2022
Vertė
Neatskleista
Vieta
United Kingdom, Jungtinė Karalystė
Paskelbta
Vasaris 24, 2026
CPV kodas
Projekto grafikas

Konkursas paskelbtas

Vasaris 14, 2022

Klausimų pateikimo terminas

Sausis 11, 2022

Pasiūlymų pateikimo terminas

Sausis 18, 2022

Biudžetas
Neatskleista
Trukmė
Nenurodyta
Vieta
United Kingdom
Tipas
Kita

Originalus konkurso aprašymas

The call-off framework comprise five lots in total. Lots 1 – 4 are each defined by a specific smart energy solution that public sector organisations (Contracting authorities) may want to deploy on a single asset or portfolio of multiple assets. Lot 5 is for integrated smart energy solutions, which will cover a broad range of smart energy technologies, with third party investment potential. Table 1 S/No Lot Name/Technologies No of Awardees 1. Building integrated solar PV with battery storage 8 2. Solar car ports with battery storage 5 3. Building integrated battery storage 5(Cancelled) 4. Ground mounted solar PV and battery storage (grid connected and private wire 5 5. Integrated smart energy system 5 Lot 5, the deployment of integrated smart energy systems across a portfolio of multiple assets. The integrated smart energy system may include a mixture of technology types, including those that are featured in lots 1-4. In addition other technologies may also be suggested by Suppliers at the mini competition stage, and subject to the Contracting Authority agreement be included. These ‘other’ technologies might for example include but are not limited to ultra-rapid electric vehicle charging hubs/ forecourts, standalone (grid-connected) battery storage, wind turbines, and hydro-electric plants, platform (software/ hardware) for aggregating generation/ demand and interacting with a potential future local energy market. . All call off contracts will be awarded via future mini competitions that will be run by the Contracting Authorities. The framework will provide sufficient flexibility to accommodate the range in needs and requirements of the Contracting Authorities in terms of technical solutions, portfolio scale, investment options and delivery models.

Rizikos analizė

Prisijunkite, kad galėtumėte naudoti rizikos analizę.

Prisijungti

Laimėjimo strategija

Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.

Prisijungti

Konkurentai

Atnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.

Prisijungti

Reikalavimai ir kvalifikacija

AI reikalavimų analizė šiam konkursui dar nepasiekiama.

Reikalavimai bus sugeneruoti automatiškai, kai bus apdoroti konkurso dokumentai.


Pagrindiniai reikalavimai

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumentai

Šiam konkursui nėra apdorotų dokumentų.

Dokumentai čia pasirodys, kai tik jie bus atsisiųsti ir išanalizuoti.

Analizė vykdoma

Šio konkurso kokybės analizė yra apdorojama. Prašome patikrinti vėliau.

Įtraukti į „Pipeline“