Skip to main content
Atgal į konkursus

Stoke-on-Trento Darnumo parko energijos atgavimo įrenginys – projektavimas, statyba ir eksploatavimas

Atviras
Galutinis terminas
Liko 18 dienų
Balandis 15, 2026
Informacija apie sutartį
Kategorija
Open Procedure
Nuoroda
020531-2026
Vertė
£1,320,000,000
Vieta
Shropshire and Staffordshire, Jungtinė Karalystė
Paskelbta
Kovas 20, 2026
CPV kodas
Projekto grafikas

Konkursas paskelbtas

Kovas 06, 2026

Klausimų pateikimo terminas

Balandis 08, 2026

Pasiūlymų pateikimo terminas

Balandis 15, 2026

Sutarties pradžios data

Rugsėjis 01, 2027

Biudžetas
£1,320,000,000
Trukmė
350 mėnesių
Vieta
Shropshire and Staffordshire
Tipas
Open Procedure
75
Kokybės įvertinimas/100
Gerai

Originalus konkurso aprašymas

Stoke-on-Trento miesto taryba siekia įsigyti pakeičiančią Energijos atgavimo įrenginį (ERF) Hanforde, Stoke-on-Trente. Naujasis ERF turės 230 000–290 000 tonų per metus pajėgumą, esant 80 % Tarybos ir 20 % privačiojo sektoriaus nuosavybės pagrindui. Pirkimas apima projektavimą ir statybą (D&B) bei 25 metų eksploatavimo ir priežiūros (O&M) sutartį. Pagrindiniai reikalavimai apima naujo ERF projektavimą ir statybą su judančio grotelių degimo technologija (arba lygiavertę) ir pažangiomis dūmų valymo sistemomis, kombinuotos šilumos ir elektros energijos (CHP) technologijos integravimą, siekiant tiekti mažai anglies dvideginio išskiriantį šilumą į miesto centralizuotą šilumos tinklą, ir pasirengimą anglies dioksido surinkimui. Įrenginys turi atitikti Tarybos 2050 m. nulinio anglies dioksido išmetimo strategiją. Po paleidimo reikalinga pilna 25 metų O&M paslauga.

Rizikos analizė

Prisijunkite, kad galėtumėte naudoti rizikos analizę.

Prisijungti

Laimėjimo strategija

Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.

Prisijungti

Konkurentai

Atnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.

Prisijungti

Reikalavimai ir kvalifikacija

24 reikalavimų 5 kategorijose

Pateikimas (2)
Privalomas (1)
Atitiktis (11)
Techninis (8)
Finansinis (2)
SUBMISSION REQUIREMENTS2
--Bids must be submitted by the deadline of 2026-04-15T00:00:00.
--Bids must be provided in English, Estonian, Latvian, Polish, and Lithuanian.
MANDATORY EXCLUSION GROUNDS1
--No specific grounds listed, but standard procurement exclusion criteria will likely apply.
ELIGIBILITY REQUIREMENTS11
--Must be capable of designing and building a new Energy Recovery Facility (ERF).
--Must be capable of providing a 25-year Operations and Maintenance (O&M) service post-commissioning.
--Must be able to integrate Combined Heat and Power (CHP) technology.
TECHNICAL CAPABILITY REQUIREMENTS8
--Design and build of a new ERF with moving grate combustion technology (or equivalent).
--Design and build of advanced flue-gas treatment systems.
--Integration of Combined Heat and Power (CHP) technology.
FINANCIAL REQUIREMENTS2
--The total value of the tender is 1,320,000,000 EUR.
--Bidders must demonstrate financial stability to undertake a project of this scale and duration (350 months).

Reikalavimų peržiūra

Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę

Dokumentai

Šiam konkursui nėra apdorotų dokumentų.

Dokumentai čia pasirodys, kai tik jie bus atsisiųsti ir išanalizuoti.

75
Gerai

Konkurso kokybės įvertinimas

This tender for an Energy Recovery Facility is comprehensive, with a high estimated value and long contract duration. Key requirements are clearly outlined, but the absence of explicit evaluation criteria and the potential for a short submission window are notable concerns.

Įvertinimo detalės

Atitiktis teisės aktams75/100

The tender appears to comply with general procurement regulations, including a clear CPV code and a competitive flexible procedure. However, the submission deadline is relatively short given the project's scale and complexity, which could be a point of contention. The absence of a 'reveal date' is a minor procedural oversight.

Submission deadline may be too short for the project's scale.
Aiškumas80/100

The description of the Energy Recovery Facility, its capacity, ownership structure, and key technical requirements (moving grate, CHP, Carbon Capture Ready) is clear. The AI-extracted requirements further detail the expected capabilities. However, the lack of specified evaluation criteria leaves bidders uncertain about how their proposals will be assessed.

Missing evaluation criteria.
Užbaigtumas70/100

Most basic information is present, including title, reference, organization, estimated value, contract duration, and start date. The CPV code is provided. However, the crucial tender documents are listed as having no content available, which significantly impacts completeness.

No document content available.
Sąžiningumas85/100

The tender is open, and the estimated value is disclosed, promoting transparency. The requirements are generally objective and focused on technical capabilities and project outcomes. There are no immediately apparent requirements tailored to specific companies. The use of a competitive flexible procedure suggests a fair process.

Praktiškumas65/100

The tender specifies a contract start date and duration. However, the lack of information regarding e-submission and the URL for documents makes the submission process less practical. Financing information is not explicitly detailed, which could be a practical consideration for bidders.

No e-submission specified.
No document URL provided.
Duomenų nuoseklumas90/100

Key fields such as title, reference, organization, value, and dates are populated. There are no reported disputes or suspensions. The dates provided (contract start and duration) are logically consistent with the project's scope.

Tvarumas50/100

While the project title and description mention 'Sustainability Park' and 'Net Zero 2050 strategy,' and 'low-carbon heat,' there are no explicit requirements for green procurement, social aspects, or innovation beyond the inherent nature of an ERF and carbon capture readiness. It is not indicated as EU funded.

No explicit green procurement criteria.
No explicit social criteria.

Privalumai

Clear and detailed project description.
High estimated value and long contract duration indicating significant project.
Specific technical requirements (CHP, Carbon Capture Ready).
Open tender procedure.

Problemos

No document content available.
Missing evaluation criteria.
Potentially short submission deadline.
Lack of e-submission details.

Rekomendacijos

1. Provide full tender documents with clear content.
2. Specify detailed evaluation criteria.
3. Consider extending the submission deadline or confirming its adequacy.

AI įvertinimo peržiūra

Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę

Išsami kokybės balo analizė
Detali sub-balų analizė
Privalumų ir trūkumų įžvalgos
Strateginės rekomendacijos

Nereikia kreditinės kortelės • Sąranka per 2 minutes

Nauja paslauga

Norite, kad mes pasirūpintume šiuo konkursų?

Mūsų viešųjų pirkimų ekspertai parengia viską. Įrodytas sprendimas — jūs peržiūrit, patvirtinate ir pateikiate.

~1hTik jūsų laikas
80%+80%+
$0Iš anksto
Žiūrėti pilną palyginimą
Be TaaSSu TaaS
40–80 val.
Pasirengimo laikas
~1 val.
Tik jūsų laikas
15–25%
Vidutinis laimėjimo rodiklis
80%+
Laimėjimo rodiklis
Klaidų rizika
Rankinė patikra
Ekspertų QA
Atitikties patikra
Jūs darote viską
Tvarkotės su viskuo
Mes darome viską
Visapusiška paslauga
Laimėkime šį konkursą!
Mokėkite tik laimėjimo atveju — tik sėkmės mokestis · Pasitiki daugiau nei 400 įmonių
Arba darykite patys

Įtraukti į „Pipeline“