Skip to main content
Retour aux appels d'offres

Achat de nouveaux bus

Ouvert
Date limite
4 jours restants
Mars 31, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
6945953
Valeur
Non divulgué
Lieu
Taurage County, Lituanie
Publié
Mars 20, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 16, 2026

Date limite pour les questions

Mars 24, 2026

Date limite de soumission

Mars 31, 2026

Ouverture de l'appel d'offres

Mars 31, 2026

Probabilité de gainPRO
🔒
Passer au Professionnel
Consultez votre probabilité de gain estimée basée sur les données historiques.
Passer au Professionnel →
Aperçu du secteurPRO
🔒
Débloquer les aperçus du secteur
Consultez les prix gagnants moyens, les niveaux de concurrence et les tendances du marché.
Passer au Professionnel →
Budget
Non divulgué
Durée
4 mois
Lieu
Taurage County
Type
Open Procedure
65
Score de qualité/100
Bon
Référentiel de marché
Prix moyen gagnant
€703,059
Offres moyennes
3.1
Concurrence
Moyenne
PME gagnantes
96%
2,253 appels d'offres analysés

Description originale de l'appel d'offres

L'entité adjudicatrice a l'intention d'acheter 2 (deux) nouveaux bus de classe M3
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

5 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (1)
Financier (1)
SUBMISSION REQUIREMENTS1
--No information provided on submission requirements.
MANDATORY EXCLUSION GROUNDS1
--No information provided on mandatory exclusion grounds.
ELIGIBILITY REQUIREMENTS1
--No information provided on eligibility requirements.
TECHNICAL CAPABILITY REQUIREMENTS1
--No information provided on technical capability requirements.
FINANCIAL REQUIREMENTS1
--No information provided on financial requirements.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

7 documents disponibles avec des résumés IA

Bendrosios sąlygosDOC
Bendrosios sąlygos.docx

This document contains general terms and conditions, definitions, and procedural information for a public procurement process for two new M3 class buses.

Specialiosios pirkimo sąlygosDOC
Specialiosios pirkimo sąlygos.docx

This document contains special procurement conditions for the purchase of two new M3 class buses by UAB Jurbarko autobusų parkas, detailing requirements, submission procedures, and bid security.

espd-request.pdfPDF
espd-request.pdf -- 82.9 KB

No content extracted

NoticePDF
Notice_6945953.pdf

This document contains a tender notice for the procurement of two new M3 class buses by Uždaroji akcinė bendrovė Jurbarko autobusų parkas in Lithuania.

README.txtTXT
README.txt -- 835 B

This document contains a corrupted ESPD request XML file, not directly usable for tender submission.

Tender Structure XML - Cycle 1XML
c4t_6945953_1.xml

This document outlines the structure for a tender process, specifically for an open procedure evaluating the lowest price, involving two lots and a first round of submissions.

espd-request.xmlXML
espd-request.xml -- 245.6 KB

This document is a request for the European Single Procurement Document (ESPD) for a tender concerning the purchase of two new M3 class buses.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

65
Bon

Score de qualité de l'appel d'offres

This tender for new buses is generally well-structured but lacks critical details regarding evaluation criteria, financial requirements, and sustainability aspects. While basic information is present, the absence of specific eligibility and submission requirements, alongside unspecified financial details, hinders a complete assessment.

Répartition du score

Conformité légale60/100

The tender follows an open procedure compliant with EU directives (2014/25/ES). However, the absence of stated mandatory exclusion grounds and eligibility requirements presents a potential compliance gap if these are indeed not communicated elsewhere. The timeline of 16 days from publication to submission might be considered short for a procurement of this nature. There is no information on disputes or prior issues.

Potential lack of clarity on mandatory exclusion grounds and eligibility requirements.
Submission deadline may be short (16 days).
Clarté70/100

The title, description of goods (2 new M3 class buses), and CPV code are clear. However, crucial elements like evaluation criteria, technical capability, financial requirements, and submission details are entirely missing from the provided text, significantly impacting clarity for potential bidders.

Missing evaluation criteria.
No information provided on technical capability requirements.
Exhaustivité65/100

The tender includes basic information such as title, organization, CPV, and deadline. However, the estimated value is not disclosed, and there is a significant lack of detail regarding mandatory exclusion grounds, eligibility requirements, technical capabilities, financial standing, and submission procedures, which are vital for a complete tender package.

Estimated value not disclosed.
Missing mandatory exclusion grounds.
Équité85/100

The tender utilizes e-procurement, indicating a move towards transparency. The CPV code is specified, and the procedure is open. However, the lack of disclosed estimated value and the absence of clearly defined objective evaluation criteria raise concerns about fairness, as bidders cannot fully assess the project's scope or the basis for selection. The absence of specific tailored requirements suggests a generally fair approach, but the missing information creates an uneven playing field.

Estimated value not disclosed.
Missing evaluation criteria.
Aspect pratique50/100

The tender is marked for e-procurement, which is positive. However, the critical lack of information on submission requirements, evaluation criteria, and financial details makes it impractical to prepare a bid. The short contract duration of 4 months might also be impractical for the procurement and delivery of new buses, and financing information is absent.

No e-submission specified in the details (only as a characteristic).
Missing submission requirements.
Cohérence des données85/100

Key fields like title, reference, organization, deadline, and CPV are populated. The opening date is logically after the submission deadline. There are no reported disputes or suspensions. The contract duration is specified, though its practicality is questionable.

Durabilité25/100

There is no mention of green procurement, social aspects, innovation, or EU funding in the tender details. This indicates a complete absence of sustainability considerations, which is a significant drawback in modern public procurement.

No green procurement criteria mentioned.
No social criteria mentioned.

Points forts

Clear title and CPV code.
Open procedure compliant with EU directives.
E-procurement indicated.
Basic tender documents are available.

Préoccupations

Significant missing information (evaluation criteria, financial/technical/submission requirements).
Undisclosed estimated value.
Lack of sustainability considerations.
Potentially short submission deadline.

Recommandations

1. Provide detailed evaluation criteria and financial/technical/submission requirements.
2. Disclose the estimated contract value.
3. Incorporate sustainability criteria (e.g., emissions, energy efficiency).

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline