Skip to main content
Retour aux appels d'offres

TRAVAUX D'INSTALLATION DE RÉSERVOIR D'ACCUMULATION À LA CHAUFFERIE N° 1 DE UAB "SKUODO ŠILUMA".

Fermé
Date limite
0 jours restants
Mars 27, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
6928860
Valeur
Non divulgué
Lieu
Klaipeda County, Lituanie
Publié
Mars 19, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 13, 2026

Date limite pour les questions

Mars 20, 2026

Date limite de soumission

Mars 27, 2026

Ouverture de l'appel d'offres

Mars 27, 2026

Probabilité de gainPRO
🔒
Passer au Professionnel
Consultez votre probabilité de gain estimée basée sur les données historiques.
Passer au Professionnel →
Aperçu du secteurPRO
🔒
Débloquer les aperçus du secteur
Consultez les prix gagnants moyens, les niveaux de concurrence et les tendances du marché.
Passer au Professionnel →
Budget
Non divulgué
Durée
13 mois
Lieu
Klaipeda County
Type
Open Procedure
75
Score de qualité/100
Bon
Référentiel de marché
Prix moyen gagnant
€6,132,447
Offres moyennes
4.1
Concurrence
Moyenne
PME gagnantes
90%
960 appels d'offres analysés

Description originale de l'appel d'offres

L'entité adjudicatrice a l'intention d'acquérir les travaux d'installation d'un réservoir d'accumulation à la chaufferie n° 1 de Skuodas.
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

5 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (1)
Financier (1)
SUBMISSION REQUIREMENTS1
--No information provided on submission requirements.
MANDATORY EXCLUSION GROUNDS1
--No information provided on mandatory exclusion grounds.
ELIGIBILITY REQUIREMENTS1
--No information provided on eligibility requirements.
TECHNICAL CAPABILITY REQUIREMENTS1
--No information provided on technical capability requirements.
FINANCIAL REQUIREMENTS1
--No information provided on financial requirements.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

6 documents disponibles avec des résumés IA

10 priedas Tiekėjo vadovaujančių specialistų sąrašas.docxDOC
10 priedas Tiekėjo vadovaujančių specialistų ... -- 16.2 KB

No content extracted

11 priedas. Projekto vadovo patirtis.docxDOC
11 priedas. Projekto vadovo patirtis.docx -- 23.9 KB

No content extracted

2 priedas. Techninė specifikacija.docxDOC
2 priedas. Techninė specifikacija.docx -- 93.8 KB

No content extracted

2 priedo Piredas Nr. 3 akumuliaciac. talpos duomenų lapas.docxDOC
2 priedo Piredas Nr. 3 akumuliaciac. talpos d... -- 26.4 KB

No content extracted

2 priedo Priedas nr. 1 Katilines Silumine schema skuodas-Model.pdfPDF
2 priedo Priedas nr. 1 Katilines Silumine sch... -- 256.3 KB

No content extracted

NoticePDF
Notice_6928860.pdf

This document is a tender notice for the installation of a thermal storage tank at UAB 'Skuodo šiluma' boiler house No. 1 in Lithuania, including design, equipment installation, and commissioning.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

75
Bon

Score de qualité de l'appel d'offres

This tender for accumulator tank installation is generally well-structured with available documentation, but lacks specific evaluation criteria and financial details, impacting completeness and clarity.

Répartition du score

Conformité légale75/100

The tender follows a standard open procedure and includes a CPV code. Deadlines appear reasonable given the submission period. No explicit disputes are noted. The procedure is defined as 'OPEN' which aligns with EU directives.

Clarté80/100

The core requirement for accumulator tank installation is clear. However, the absence of specified evaluation criteria and detailed technical specifications within the extracted information reduces overall clarity.

Missing evaluation criteria specified.
Exhaustivité70/100

Most basic information is present, including the organization, title, and contract duration. However, the estimated value is not disclosed, and crucial details regarding eligibility, technical, and financial requirements are missing from the AI-extracted sections, despite numerous attached documents.

Estimated Value not disclosed.
Mandatory Exclusion Grounds information not provided.
Équité85/100

The tender is an open procedure with e-procurement characteristics, promoting fairness. The value is not disclosed, which is a minor concern. There are no immediately apparent requirements tailored to specific companies, suggesting a good level of fairness.

Estimated Value not disclosed.
Aspect pratique65/100

The tender is active and has a submission deadline. E-submission is indicated. However, the contract start date is not specified, and financing information is absent, which could affect practical planning for bidders.

Contract start date not specified.
Financing information not provided.
Cohérence des données90/100

Key fields like title, reference, organization, and deadlines are populated. There are no indications of suspension or disputes. Dates appear logically sequenced.

Durabilité50/100

There is no explicit mention of green procurement, social aspects, or innovation within the provided information. The tender does not appear to be EU funded based on the available data.

No green procurement criteria.
No social criteria mentioned.

Points forts

Clear title and reference number.
Organization and CPV code specified.
Numerous relevant documents attached.
Active status with a defined submission deadline.
E-procurement is utilized.

Préoccupations

Estimated value not disclosed.
Missing specific evaluation criteria.
Crucial requirement details (eligibility, technical, financial) not extracted.
Lack of sustainability considerations.
Contract start date not specified.

Recommandations

1. Disclose the estimated contract value to provide better context for bidders.
2. Clearly define the evaluation criteria within the tender documentation.
3. Consider incorporating sustainability aspects into the tender requirements.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline