Besoin de l'aide d'un expert en appels d'offres ? Découvrez notre service de préparation d'appels d'offres
Retour aux appels d'offres

Cadre pour le forage horizontal dirigé (HDD)

Ouvert
Date limite
17 jours restants
15 décembre 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
109881-2026
Valeur
£1,440,000
Lieu
North East England, Royaume-Uni
Publié
21 novembre 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

19 novembre 2026

Date limite pour les questions

8 décembre 2026

Date limite de soumission

15 décembre 2026

Date de début du contrat

3 juillet 2027

Budget
£1,440,000
Durée
36 mois
Lieu
North East England
Type
Restricted Procedure

Description originale de l'appel d'offres

NGN invites tenders from suitably qualified and experienced suppliers for the provision of Horizontal Directional Drilling (HDD) services to support the delivery of NGN's operational programmes across its gas distribution network. NGN's estimated annual expenditure under the Framework Agreement is approximately £1.2 million. This value is provided for indicative planning purposes only and does not constitute any guarantee, commitment or representation regarding the volume, nature, frequency or value of work that may be awarded during the term of the Framework Agreement. 1.Purpose of the Framework The purpose of the framework is to ensure NGN has access to competent, capable and responsive suppliers able to deliver directional drilling services safely, compliantly and efficiently in support of core operational activities, including: Gas Mains Replacement Reinforcement works Gas Mains Connections Diversions The framework will provide operational resilience, flexibility of capacity and value for money across all NGN operational areas. 2. Core Service Deliverables The Supplier shall provide horizontal directional drilling services as instructed by NGN from time to time, including: Safe, compliant execution of horizontal directional drilling works to facilitate the installation of polyethylene (PE) gas mains Installation of PE pipework with nominal outside diameters of: Up to 125mm O.D. 180mm O.D. 250mm O.D. 315mm O.D. 355mm O.D. Provision, operation and maintenance of all drilling plant, equipment, tooling and resources required to deliver the works Supply of competent, trained and accredited personnel appropriate to the works undertaken  Delivery of works in accordance with NGN specifications, industry standards and all applicable statutory and regulatory requirements 3. Call‑Off and Work Instruction Deliverables For each call‑off or works instruction, the Supplier shall: Accept and resource works in accordance with the instructed programme and priorities Attend site as instructed and coordinate activities with NGN operational representatives and other contractors where required Deliver the works within the agreed timescales and constraints set out at call‑off stage Comply with any site‑specific requirements confirmed by NGN at call‑off stage 4. Health, Safety and Environmental Deliverables The Supplier shall: Comply at all times with NGN Health & Safety policies and procedures Ensure all personnel are competent, trained and appropriately accredited for the works undertaken Provide method statements and risk assessments as required by NGN Manage environmental impacts associated with drilling activities in accordance with legal and NGN requirements Immediately report accidents, incidents, near misses and unsafe conditions in line with NGN procedures 5. Management and Supervision Deliverables The Supplier shall provide: Effective site supervision for all drilling activities A competent point of contact for operational coordination and issue resolution Adequate management oversight to ensure quality, safety and compliance Cooperation with NGN audits, inspections and assurance activities 6. Reporting and Records Deliverables The Supplier shall maintain and provide, as required: Accurate records of works completed under each call‑off Evidence of compliance with safety, quality and technical requirements Progress updates and completion confirmations as instructed by NGN Any documentation reasonably required to support performance monitoring and assurance 7. Performance and Service Level Deliverables The Supplier shall meet the performance standards set out in the Framework Agreement, including: Compliance with agreed KPIs and SLAs Timely delivery of works Quality of workmanship Responsiveness to NGN instructions and operational priorities Performance will be monitored through NGN's contract management processes, including regular review meetings where required. 8. Interfaces and Exclusions Unless expressly stated in the relevant call‑off: The Supplier's obligations are limited to the delivery of directional drilling services Activities such as traffic management, reinstatement, permits or third‑party services are excluded and will be instructed separately by NGN where required Surveys are excluded from the standard directional drilling rates. Where expressly instructed and authorised within the relevant Call-Off and Purchase Order, surveys shall be paid using the applicable Schedule 2 rate 9. Continuous Improvement The Supplier shall support continuous improvement by: Engaging in performance reviews with NGN Identifying opportunities to improve safety, efficiency or service delivery Implementing agreed improvement actions within reasonable timescales 10. Performance Management, KPIs and Service Level Agreements 10.1 General The Supplier shall deliver the Services in accordance with the performance requirements set out in this Section. Performance will be monitored by NGN throughout the Framework Term to ensure services are delivered safely, compliantly, and in line with operational requirements. Failure to meet the KPIs or SLAs may result in escalation, the implementation of a Performance Improvement Plan, or other remedies available to NGN under the Framework Agreement. 10.2 Service Level Agreements (SLAs) SLA 10.2.1 - Mobilisation and Attendance The Supplier shall attend site in accordance with the priority of the works instruction: Emergency / urgent works: attendance within [4] hours of instruction Planned works: attendance in line with the agreed programme Target: 95% compliance per reporting period. SLA 10.2.2 - Programme Adherence Directional drilling works shall be completed in accordance with the agreed call‑off programme and timescales. Target: 95% of works completed within agreed timescales. SLA 10.2.3 - Health & Safety Compliance The Supplier shall comply fully with NGN Health & Safety requirements, approved RAMS, and statutory obligations. Targets: Zero fatalities Zero prohibition notices 100% compliance with approved RAMS and NGN safety procedures SLA 10.2.4 - Quality of Works Works shall be completed right‑first‑time with no defects or rework attributable to the Supplier. Target: 98% of works completed without defect or rework. SLA 10.2.5 - Incident Reporting All accidents, incidents and near misses shall be reported in accordance with NGN procedures. Target: Immediate verbal notification Written report submitted within 24 hours SLA 10.2.6 - Site Behaviour and Coordination The Supplier shall cooperate fully with NGN operational teams and other contractors and conduct all site activities professionally. Target: No substantiated complaints attributable to the Supplier. 10.3 Key Performance Indicators (KPIs) KPI 10.3.1 - Responsiveness Timely response to NGN instructions, communications and operational queries. Target: 95% of communications responded to within one working day. KPI 10.3.2 - Resource Availability Ability to provide adequate labour, plant and equipment to meet NGN call‑off requirements. Target: 95% of call‑offs accepted and resourced as instructed. KPI 10.3.3 - Reporting and Records Accuracy and timeliness of required records, reports and evidencing of completed works. Target: 100% of required reports submitted on time and complete. KPI 10.3.4 - Customer and Stakeholder Impact Minimisation of adverse impact on customers, highways and third parties. Target: No avoidable customer complaints attributable to the Supplier. KPI 10.3.5 - Environmental Compliance Compliance with environmental controls and requirements associated with drilling activities. Targets: Zero environmental enforcement notices Demonstrable compliance with NGN environmental procedures 10.4 Management Information The Supplier shall provide management information to support performance monitoring, including: Summary of works delivered Performance against each KPI and SLA Incidents, near misses and corrective actions Resource availability and capacity issues Management information shall be provided monthly, or more frequently where reasonably required by NGN. 10.5 Performance Review and Escalation Performance against KPIs and SLAs will be reviewed as part of NGN's contract management arrangements. Where performance falls below required standards, NGN may: Require a Performance Improvement Plan Escalate performance concerns through governance routes Restrict future call‑offs Apply other contractual remedies, including suspension or removal from the framework, where persistent underperformance occurs

Analyse des risques

L'analyse des risques n'est pas encore disponible pour les appels d'offres de ce pays. Actuellement pris en charge : Estonie, Lettonie, Lituanie, Pologne, France, Royaume-Uni, Danemark, Pays-Bas, Norvège et Finlande.

Stratégie gagnante

Obtenez une stratégie gagnante générée par l'IA et adaptée à cet appel d'offres. Comprend un score de probabilité de succès, les opportunités et défis clés, les axes prioritaires de l'offre, une analyse du positionnement concurrentiel et des recommandations concrètes pour maximiser vos chances.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'IA extrait et organise toutes les exigences des documents de l'appel d'offres — qualifications obligatoires, spécifications techniques, conditions financières et règles de soumission — clairement catégorisées pour que vous sachiez exactement ce qui est requis pour soumissionner.

Se connecter

Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents disponibles avec des résumés IA

OCDS RecordDOC
109881-2026_ocds_record.json

Aucun résumé n'est disponible pour ce document.

OCDS Release PackageDOC
109881-2026_ocds_release.json

Aucun résumé n'est disponible pour ce document.

Official PDF VersionPDF
109881-2026_official.pdf

Aucun résumé n'est disponible pour ce document.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

Score de qualité

Analyse qualitative complète de cet appel d'offres évaluant la conformité juridique, la clarté, l'exhaustivité, l'équité, la faisabilité, la cohérence des données et la durabilité sur une échelle de 0 à 100 avec une ventilation détaillée et des recommandations.

Se connecter