Skip to main content
Retour aux appels d'offres

Parc de durabilité de Stoke-on-Trent – Installation de valorisation énergétique – Conception, Construction et Exploitation

Ouvert
Date limite
18 jours restants
Avril 15, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
020531-2026
Valeur
£1,320,000,000
Lieu
Shropshire and Staffordshire, Royaume-Uni
Publié
Mars 20, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 06, 2026

Date limite pour les questions

Avril 08, 2026

Date limite de soumission

Avril 15, 2026

Date de début du contrat

Septembre 01, 2027

Budget
£1,320,000,000
Durée
350 mois
Lieu
Shropshire and Staffordshire
Type
Open Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Le conseil municipal de Stoke-on-Trent cherche à acquérir une installation de valorisation énergétique (IVE) de remplacement à Hanford, Stoke-on-Trent. La nouvelle IVE aura une capacité de 230 000 à 290 000 tonnes par an sur une base de propriété de 80 % pour le conseil et 20 % pour le secteur privé. L'acquisition comprend la conception et la construction (D&B) ainsi qu'un contrat d'exploitation et de maintenance (O&M) de 25 ans. Les exigences clés comprennent la conception et la construction d'une nouvelle IVE avec une technologie de combustion à grille mobile (ou équivalente) et des systèmes avancés de traitement des gaz de combustion, l'intégration de la technologie de cogénération (CHP) pour fournir de la chaleur à faible émission de carbone au réseau de chaleur urbain de la ville, et la préparation pour la capture du carbone. L'installation doit être conforme à la stratégie « Net Zero 2050 » de l'autorité. Un service complet d'O&M de 25 ans après la mise en service est requis.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

24 exigences dans 5 catégories

Soumission (2)
Obligatoire (1)
Conformité (11)
Technique (8)
Financier (2)
SUBMISSION REQUIREMENTS2
--Bids must be submitted by the deadline of 2026-04-15T00:00:00.
--Bids must be provided in English, Estonian, Latvian, Polish, and Lithuanian.
MANDATORY EXCLUSION GROUNDS1
--No specific grounds listed, but standard procurement exclusion criteria will likely apply.
ELIGIBILITY REQUIREMENTS11
--Must be capable of designing and building a new Energy Recovery Facility (ERF).
--Must be capable of providing a 25-year Operations and Maintenance (O&M) service post-commissioning.
--Must be able to integrate Combined Heat and Power (CHP) technology.
TECHNICAL CAPABILITY REQUIREMENTS8
--Design and build of a new ERF with moving grate combustion technology (or equivalent).
--Design and build of advanced flue-gas treatment systems.
--Integration of Combined Heat and Power (CHP) technology.
FINANCIAL REQUIREMENTS2
--The total value of the tender is 1,320,000,000 EUR.
--Bidders must demonstrate financial stability to undertake a project of this scale and duration (350 months).

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for an Energy Recovery Facility is comprehensive, with a high estimated value and long contract duration. Key requirements are clearly outlined, but the absence of explicit evaluation criteria and the potential for a short submission window are notable concerns.

Répartition du score

Conformité légale75/100

The tender appears to comply with general procurement regulations, including a clear CPV code and a competitive flexible procedure. However, the submission deadline is relatively short given the project's scale and complexity, which could be a point of contention. The absence of a 'reveal date' is a minor procedural oversight.

Submission deadline may be too short for the project's scale.
Clarté80/100

The description of the Energy Recovery Facility, its capacity, ownership structure, and key technical requirements (moving grate, CHP, Carbon Capture Ready) is clear. The AI-extracted requirements further detail the expected capabilities. However, the lack of specified evaluation criteria leaves bidders uncertain about how their proposals will be assessed.

Missing evaluation criteria.
Exhaustivité70/100

Most basic information is present, including title, reference, organization, estimated value, contract duration, and start date. The CPV code is provided. However, the crucial tender documents are listed as having no content available, which significantly impacts completeness.

No document content available.
Équité85/100

The tender is open, and the estimated value is disclosed, promoting transparency. The requirements are generally objective and focused on technical capabilities and project outcomes. There are no immediately apparent requirements tailored to specific companies. The use of a competitive flexible procedure suggests a fair process.

Aspect pratique65/100

The tender specifies a contract start date and duration. However, the lack of information regarding e-submission and the URL for documents makes the submission process less practical. Financing information is not explicitly detailed, which could be a practical consideration for bidders.

No e-submission specified.
No document URL provided.
Cohérence des données90/100

Key fields such as title, reference, organization, value, and dates are populated. There are no reported disputes or suspensions. The dates provided (contract start and duration) are logically consistent with the project's scope.

Durabilité50/100

While the project title and description mention 'Sustainability Park' and 'Net Zero 2050 strategy,' and 'low-carbon heat,' there are no explicit requirements for green procurement, social aspects, or innovation beyond the inherent nature of an ERF and carbon capture readiness. It is not indicated as EU funded.

No explicit green procurement criteria.
No explicit social criteria.

Points forts

Clear and detailed project description.
High estimated value and long contract duration indicating significant project.
Specific technical requirements (CHP, Carbon Capture Ready).
Open tender procedure.

Préoccupations

No document content available.
Missing evaluation criteria.
Potentially short submission deadline.
Lack of e-submission details.

Recommandations

1. Provide full tender documents with clear content.
2. Specify detailed evaluation criteria.
3. Consider extending the submission deadline or confirming its adequacy.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline