Skip to main content
Vous souhaitez soumissionner aux marchés publics ? Découvrez notre service de préparation TaaS
Retour aux appels d'offres

Centre énergétique NBI – Moteurs de cogénération (CHP) – Programme d'infrastructure de nouvelle génération

Ouvert
Date limite
24 jours restants
Avril 21, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
025432-2026
Valeur
£13,800,000
Lieu
West Yorkshire, Royaume-Uni
Publié
Mars 20, 2026
Organisation
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 19, 2026

Date limite pour les questions

Avril 14, 2026

Date limite de soumission

Avril 21, 2026

Date de début du contrat

Juillet 16, 2026

Budget
£13,800,000
Durée
44 mois
Lieu
West Yorkshire
Type
Open Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

This tender is for the design, supply, installation, and ongoing service provision of Combined Heat and Power (CHP) engines for the new NBI Energy Centre at Norwich Research Park, as part of the Next Generation Infrastructure (NGI) Programme. This is a two-stage tendering process. Stage One involves procurement for the design of the CHP engines. Stage Two involves procurement for the supply, installation, and service provision through construction and service agreements.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

14 exigences dans 5 catégories

Soumission (5)
Obligatoire (1)
Conformité (1)
Technique (6)
Financier (1)
SUBMISSION REQUIREMENTS5
--This is a two-stage tendering process.
--Stage One: Tender returns for the design of the CHP engines through a pre-construction services agreement.
--Stage Two: Tender returns for the supply, installation, and ongoing service provision through a construction contract (JCT Design and Build 2024 with client amends) and a service agreement, following assessment of Stage One tender returns.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS1
--Must be a specialist supplier for the design, supply, installation, and ongoing service provision of Combined Heat and Power (CHP) systems.
TECHNICAL CAPABILITY REQUIREMENTS6
--Proven experience in designing CHP engines.
--Proven experience in supplying CHP engines.
--Proven experience in installing CHP engines.
FINANCIAL REQUIREMENTS1
--No specific financial requirements are detailed in the provided text.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for a Combined Heat and Power (CHP) system is well-structured with clear objectives and a two-stage process. However, it lacks specific evaluation criteria and details on sustainability aspects.

Répartition du score

Conformité légale75/100

The tender appears to comply with general procurement regulations, including the use of a proper CPV code and an open procedure. Deadlines are provided, though the submission deadline might be considered tight by some. No disputes are indicated.

Clarté80/100

The description of the project and the two-stage tendering process is clear. The eligibility and technical capability requirements are well-defined, specifying the need for a specialist supplier with proven experience in CHP systems.

Exhaustivité70/100

Most basic information is present, including estimated value, contract duration, and start date. However, the absence of specific financial requirements and detailed evaluation criteria impacts completeness.

Missing evaluation criteria
Équité85/100

The tender is open, and the value is disclosed. The two-stage process allows for a structured evaluation. Requirements are focused on technical capability and specialization, which is generally fair. No obvious tailoring to specific companies is apparent.

Aspect pratique65/100

The tender specifies a contract start date and duration. However, the lack of information regarding e-submission and the URL for tender documents reduces practicality. Financing information is not detailed.

No e-submission
Document URL missing
Cohérence des données90/100

Key fields such as title, reference, organization, value, and dates are populated. The timeline is logical, and there are no indications of suspension or disputes, contributing to high data consistency.

Durabilité50/100

The tender does not explicitly mention green procurement, social aspects, or innovation. It is also not indicated as EU funded, which limits the sustainability score.

Not green procurement
No social criteria

Points forts

Clear two-stage tendering process
Well-defined technical requirements
Open procedure with disclosed value
Comprehensive project description

Préoccupations

Missing evaluation criteria
Lack of e-submission details
Limited information on sustainability aspects

Recommandations

1. Provide detailed evaluation criteria for both stages.
2. Clarify the e-submission process and provide document access URLs.
3. Incorporate sustainability considerations into the tender requirements.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline