Connectez-vous pour accéder aux recommandations de stratégie gagnante.
Se connecterPassez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.
Se connecter5 exigences dans 5 catégories
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucun document traité n'est disponible pour cet appel d'offres.
Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.
This tender for small works in London is generally well-structured with clear basic information, but lacks detail on evaluation criteria and submission requirements, impacting its practicality and completeness.
The tender appears to comply with general procurement regulations, with a clear CPV code and no immediate red flags regarding disputes or regulatory non-compliance. The procedure is identified as 'Competitive flexible procedure'. However, the absence of a reveal date and specified evaluation criteria could pose a minor legal risk if these are mandatory under the applicable procurement law.
The description of the works is clear, specifying the type of projects (fit-out and refurbishment) and the value limit per project. Eligibility and technical capability requirements are stated, though broadly. The main clarity issue stems from the lack of detailed evaluation criteria and submission instructions.
Most basic information is present, including title, reference, organization, description, estimated value, and contract duration. However, crucial details are missing, such as the content of the tender documents, specific financial requirements, and detailed submission requirements, which significantly impacts completeness.
The tender promotes fairness by disclosing the estimated value and using a competitive procedure. The requirements are generally objective (suitably qualified and experienced contractor). There are no obvious indications of tailoring requirements to specific companies. The use of e-procurement is implied by the platform but not explicitly stated as mandatory.
The tender is active and has a deadline, but the contract start date is the same as the submission deadline, which is impractical. The lack of explicit e-submission details and the absence of information on financing reduce practicality. The fact that documents have no content available is a significant practical barrier.
Key fields such as title, reference, organization, value, and deadlines are populated. There are no reported disputes or suspensions. The dates provided are logically consistent, although the contract start date coinciding with the submission deadline is unusual.
The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, which limits its sustainability score.
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucune carte de crédit requise • Configuration en 2 minutes
Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.
Bonjour ! Je suis votre assistant IA pour cet appel d'offres. Je peux vous aider à comprendre les exigences, les délais, les critères d'admissibilité et vous fournir des informations stratégiques.
Aucune carte de crédit requise