Retour aux appels d'offres

Land Entry Framework

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Décembre 23, 2022
Détails du contrat
Catégorie
Autre
Référence
001469-2023
Valeur
Non divulgué
Lieu
South East England, Royaume-Uni
Publié
Février 24, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Janvier 17, 2023

Date limite pour les questions

Décembre 16, 2022

Date limite de soumission

Décembre 23, 2022

Budget
Non divulgué
Durée
Non spécifié
Lieu
South East England
Type
Autre

Description originale de l'appel d'offres

Land Entry Services 1.0 Land Entry Services to including, but not limited to:- 1.1 Provision of a written fees estimate as per the Statement of Works (Order). 1.2 Provision and maintenance in a format defined by Southern Water of:- • land and compensation estimates • risk and opportunity registers associated with land matters, • programmes for land matters associated with the project 1.3 Attend project and/or site meetings as required by Southern Water 1.4 Liaison with and advise the project team over the proposed alignment of pipework, location of apparatus and other works associated with the project together with associated rights in land required 1.5 Liaison with the project team over key deliverables prepared by them including notice plans and easement drawings to ensure they are accurate and fit for purpose 1.6 Liaison with other consultants employed by Southern Water as may be required 1.7 Undertake land referencing to include preparation of a schedule and index map in a format defined by Southern Water as may be required 1.8 Establish contact and consult with landowners/occupiers and agents (in conjunction with the project team) 1.9 Negotiate and/or secure entry through use of statutory powers for site investigations. 1.10 Negotiate terms for the acquisition of land and/or rights for pumping stations, treatment works and permanent above ground apparatus including (but not limited to) access ways and services as may be required for the project 1.11 Supporting Compulsory Purchase Orders (CPOs) and Development Consent Orders (DCOs) as required. 1.12 Negotiate and agree terms for Site Compound Licences in a format defined by Southern Water as may be required 1.13 Preparation and service of Statutory Notices, subject to delegated powers, including a schedule as may be required 1.14 Obtain early entry consents (as required) 1.15 Supporting the seeking of Warrants of Entry where required. 1.16 Prepare Schedules of Condition (including photographs) in a format defined by Southern Water as may be required 1.17 Undertake building or structural surveys as required. 1.18 Maintain ongoing liaison with landowners/occupiers and agents throughout projects 1.19 Negotiate amendments to pipe alignment, location and finish of manholes etc. provision of accommodate works, site compounds etc. 1.20 Advise, if needed, regarding aspects of final reinstatement 1.21 Negotiation and settlement of compensation claims for permanent loss in the value of land as a result of works, and/or temporary losses or disturbance caused by works (including Business Loss Claims) in accordance with Statutory provision, including securing approvals for any agreements reached. 1.22 Supporting settlement and/resolution of claims referred to the Upper Tribunal. 1.23 Issuing of as-laid drawings 1.24 Negotiate and agree Heads of Terms for easements in a format defined by Southern Water as may be required 1.25 Instruction of Southern Water’s solicitors as required and supporting the completion of any legal agreements 1.26 Monthly reporting in a format defined by Southern Water

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'analyse des exigences par l'IA n'est pas encore disponible pour cet appel d'offres.

Les exigences seront générées automatiquement lorsque les documents de l'appel d'offres seront traités.


Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

Analyse en attente

L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.

Ajouter au Pipeline