Besoin de l'aide d'un expert en appels d'offres ? Découvrez notre service de préparation d'appels d'offres
Retour aux appels d'offres

Accord-cadre de recyclage et de réutilisation du SF6

Ouvert
Date limite
7 jours restants
13 novembre 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
098771-2026
Valeur
£1,110,000
Lieu
North East England, Royaume-Uni
Publié
30 octobre 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

20 octobre 2026

Date limite pour les questions

6 novembre 2026

Date limite de soumission

13 novembre 2026

Date de début du contrat

1 mars 2027

Budget
£1,110,000
Durée
36 mois
Lieu
North East England
Type
Restricted Procedure

Description originale de l'appel d'offres

National Grid intends to tender for the provision of a comprehensive SF6 (sulphur hexafluoride) management service to support the recovery, reuse, storage, treatment, distribution and disposal of National Grid-owned SF6. The contract will support National Grid's objectives of maximising reuse, reducing emissions, maintaining security of supply and ensuring full traceability of all SF6 managed on its behalf. The appointed Supplier will be required to provide an end-to-end service covering the complete lifecycle of SF6 under National Grid ownership, including: • Collection of recovered SF6 from National Grid sites. • Provision of suitable storage vessels and associated logistics. • Transportation of SF6 in compliance with all applicable legislation. • Testing, analysis and classification of recovered gas. • Processing, reclamation and recycling of SF6 to Technical Grade SF6. • Management of a dedicated National Grid-owned SF6 stockpile. • Secure storage and inventory management. • Distribution and delivery of certified Technical Grade SF6 to National Grid locations. • Disposal of non-recoverable SF6 and contaminated gas, if instructed by National Grid. • Maintenance of complete digital traceability and reporting. The Supplier shall demonstrate the capability, capacity and competence to: Collect, Process, Store and Distribute SF6 • Collect SF6 from National Grid sites across England and Wales. • Test and classify recovered gas in accordance with BS EN IEC 60480 and associated standards. • Process treatable SF6 into Technical Grade SF6 suitable for reuse. • Maintain sufficient storage capacity and stockpile management arrangements to support National Grid operational requirements. • Supply and distribute certified Technical Grade SF6 to National Grid locations, including urgent delivery requirements where necessary. Manage Disposal Activities • Safely manage contaminated and non-recoverable SF6. • Provide disposal services through appropriately licensed and authorised facilities. • Maintain full traceability through to final destruction. • Provide auditable destruction certification and disposal records. • Ensure disposal activities are only undertaken following written instruction from National Grid. Digital Tracking and Traceability The Supplier shall implement and maintain a secure digital tracking and inventory management system providing: • Real-time inventory visibility. • End-to-end traceability of all consignments. • Tracking from recovery through storage, processing, delivery and disposal. • Unique identification of consignments, vessels and processed batches. • Full movement, transaction and audit history. • Provision and recording of inventory data, certificates, analysis results and reports. Environmental Objectives The contract will prioritise: • Promote SF6 reuse and reclamation. • Minimisation of SF6 emissions. • Prevention of intentional releases to atmosphere. • Reduction of disposal volumes wherever technically feasible. • Transparent reporting of recovery, reuse, disposal and emissions performance. All SF6 managed under the contract shall remain the property of National Grid at all times. The supplier will be expected to provide all labour, facilities, equipment, transportation, testing, reporting and management resources necessary to deliver the service. At contract commencement, the successful Supplier will be expected to assume management of National Grid's existing Category A SF6 stockpile of approximately 13.26 tonnes and integrate the inventory into its traceability, storage and stock management arrangements.

Analyse des risques

L'analyse des risques n'est pas encore disponible pour les appels d'offres de ce pays. Actuellement pris en charge : Estonie, Lettonie, Lituanie, Pologne, France, Royaume-Uni, Danemark, Pays-Bas, Norvège et Finlande.

Stratégie gagnante

Obtenez une stratégie gagnante générée par l'IA et adaptée à cet appel d'offres. Comprend un score de probabilité de succès, les opportunités et défis clés, les axes prioritaires de l'offre, une analyse du positionnement concurrentiel et des recommandations concrètes pour maximiser vos chances.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'IA extrait et organise toutes les exigences des documents de l'appel d'offres — qualifications obligatoires, spécifications techniques, conditions financières et règles de soumission — clairement catégorisées pour que vous sachiez exactement ce qui est requis pour soumissionner.

Se connecter

Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents disponibles avec des résumés IA

OCDS RecordDOC
098771-2026_ocds_record.json

Aucun résumé n'est disponible pour ce document.

OCDS Release PackageDOC
098771-2026_ocds_release.json

Aucun résumé n'est disponible pour ce document.

Official PDF VersionPDF
098771-2026_official.pdf

Aucun résumé n'est disponible pour ce document.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

Score de qualité

Analyse qualitative complète de cet appel d'offres évaluant la conformité juridique, la clarté, l'exhaustivité, l'équité, la faisabilité, la cohérence des données et la durabilité sur une échelle de 0 à 100 avec une ventilation détaillée et des recommandations.

Se connecter