Connectez-vous pour accéder aux recommandations de stratégie gagnante.
Se connecterPassez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.
Se connecter10 exigences dans 5 catégories
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucun document traité n'est disponible pour cet appel d'offres.
Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.
This tender for playground equipment is generally well-structured with clear basic information and a reasonable estimated value. However, it lacks detailed evaluation criteria and specific sustainability considerations.
The tender follows an open procedure, which is standard. The CPV code is appropriate. Deadlines are provided, though the submission deadline might be considered tight by some. No disputes are noted. Regulatory compliance is assumed but not explicitly detailed.
The description of the required playground equipment is clear, specifying the types of items and lots. The eligibility and technical capability requirements are also straightforward. However, the absence of specified evaluation criteria impacts overall clarity.
Most basic information is present, including title, reference, organization, estimated value, duration, and contract start date. However, the lack of content in the tender documents and the absence of detailed financial requirements reduce completeness.
The tender is an open procedure, allowing broad participation. The estimated value is disclosed, and the criteria, while not fully specified, appear objective in nature (e.g., ability to supply specific items). There is no indication of requirements tailored to specific companies.
The tender specifies a contract duration and start date. However, the lack of information regarding e-submission and the absence of a document URL for accessing the full tender package limit practicality. Financing information is not detailed.
Key fields such as title, reference, organization, value, and deadlines are populated. The dates provided are logical and do not indicate any inconsistencies. No suspension or disputes are reported.
The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, which often implies certain sustainability standards.
Inscrivez-vous pour consulter les exigences et l'analyse complètes
Aucune carte de crédit requise • Configuration en 2 minutes
Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.
Bonjour ! Je suis votre assistant IA pour cet appel d'offres. Je peux vous aider à comprendre les exigences, les délais, les critères d'admissibilité et vous fournir des informations stratégiques.
Aucune carte de crédit requise