Retour aux appels d'offres

Construction of a New Workshed and External Canopy at Liskeard Cattle Market, Fairpark Rd, Liskeard, PL14 4BA

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Mai 25, 2021
Détails du contrat
Catégorie
Autre
Référence
014319-2021
Valeur
£3,329,269
Lieu
Cornwall and Isles of Scilly, Royaume-Uni
Publié
Février 24, 2026
Organisation
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Juin 23, 2021

Date limite pour les questions

Mai 18, 2021

Date limite de soumission

Mai 25, 2021

Budget
£3,329,269
Durée
Non spécifié
Lieu
Cornwall and Isles of Scilly
Type
Autre

Description originale de l'appel d'offres

Cornwall Council seek to appoint a suitably and demonstrably experienced Principal Contractor, appointed using NEC 3 Engineering & Construction Contract 2013 Edition (Option A) with secondary options and z clauses as included with the procurement documents, to undertake the works to construct a new workshed and external canopy with utility point at Liskeard Cattle Market, Fairpark Rd, Liskeard, Cornwall, PL14 4BA. The procurement will be on a Design and Build basis from the end of RIBA Stage 3; Site visits are available on request between the 27th and 29th January 2021 inclusive. The site is owned by Cornwall Council and sits within a conservation area. To assist with funding drawdown, the site has been broken down in to numerous sections / phases. The project will comprise the construction of 1no. three-storey BREEAM Excellent workshed, including solar PVs, with a total GIA of circa 1,328m2. As part of the works the contractor will provide all required external and landscaping works, including planting, alterations to boundaries, provision of parking, and provision of infrastructure to the buildings. The construction of an external plant room, a cycle store, and a bin store to serve the development concludes the generic scope of construction work. As part of the RIBA Stage 4 design, or as part of construction if the conditional permission permits, the contractor must provide the design information and documentation required to discharge the planning conditions for which they are responsible on this project. The contractor will be responsible for the acquisition of all RIBA Stage 4, 5, and 6 BREEAM Credits targeted and for integration of the Cross Cutting Themes of Sustainable Development and Equality and Diversity in the design and delivery of the project. The Ministry of Housing, Communities and Local Government (MHCLG) as Managing Authority for the European Regional Development Fund (ERDF) programme has completed the technical appraisal of the full application and approved in principle the award of ERDF grant. The pre-offer ERDF conditions have been cleared and at the time of writing the Council is awaiting receipt of the funding agreement. Any update to this position will be shared with all tenderers by way of a tender clarification. The works are also part funded by the Local Growth Fund. The Council anticipates the Contract Award to take place during April 2021, with completion and occupation of the new facilities during September 2022. Project Reference DN517271
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'analyse des exigences par l'IA n'est pas encore disponible pour cet appel d'offres.

Les exigences seront générées automatiquement lorsque les documents de l'appel d'offres seront traités.


Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

Analyse en attente

L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.

Ajouter au Pipeline