Skip to main content
Retour aux appels d'offres

Cadre de construction du groupe Codi

Ouvert
Date limite
104 jours restants
Juillet 10, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
016962-2026
Valeur
£400,000,000
Lieu
Wales, Royaume-Uni
Publié
Mars 20, 2026
Organisation
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Février 25, 2026

Date limite pour les questions

Juillet 03, 2026

Date limite de soumission

Juillet 10, 2026

Date de début du contrat

Septembre 30, 2026

Budget
£400,000,000
Durée
38 mois
Lieu
Wales
Type
Open Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

*VEUILLEZ NOTER QU'IL S'AGIT D'UN AVIS DE MARCHÉ PRÉVU ET NON D'UN AVIS D'APPEL D'OFFRES. L'AVIS D'APPEL D'OFFRES SERA PUBLIÉ APPROXIMATIVEMENT CONFORMÉMENT AUX DATES SPÉCIFIÉES DANS CET AVIS, MAIS POURRAIT ÊTRE SUJET À CHANGEMENT* Codi Group (anciennement Pobl Group) a l'intention de publier un appel d'offres pour nommer plusieurs entrepreneurs principaux à son nouveau cadre de construction couvrant plusieurs lots (détails à confirmer dans l'appel d'offres).

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

5 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (1)
Financier (1)
SUBMISSION REQUIREMENTS1
--[Details to be provided in the forthcoming tender notice]
MANDATORY EXCLUSION GROUNDS1
--[Details to be provided in the forthcoming tender notice]
ELIGIBILITY REQUIREMENTS1
--[Details to be provided in the forthcoming tender notice]
TECHNICAL CAPABILITY REQUIREMENTS1
--[Details to be provided in the forthcoming tender notice]
FINANCIAL REQUIREMENTS1
--[Details to be provided in the forthcoming tender notice]

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This is a planned procurement notice for a construction framework, providing essential details but lacking specific tender requirements and evaluation criteria. It is a good starting point but requires further publication for full assessment.

Répartition du score

Conformité légale75/100

The notice is compliant with basic legal requirements for a planned procurement, including a clear CPV code and organization details. The deadline for the actual tender publication is not yet set, which is acceptable for a planned notice. No disputes are reported.

Clarté80/100

The description clearly states the intent to establish a construction framework and mentions it will be divided into lots. However, specific details regarding eligibility, technical, financial, and submission requirements are explicitly deferred to the forthcoming tender notice, impacting current clarity.

Details on exclusion, eligibility, technical, financial, and submission requirements are to be provided in the forthcoming tender notice.
Exhaustivité70/100

Basic information such as title, reference, organization, estimated value, and contract duration are present. However, crucial details like the actual tender publication date, evaluation criteria, and full document content are missing, as this is a planned notice.

Missing reveal date for the tender notice.
No evaluation criteria specified.
Équité85/100

The notice is fair in its current state as it is a planned announcement, not a live tender. It does not appear to tailor requirements to specific companies. The estimated value is disclosed, and the procedure is open. The lack of specific criteria is due to it being a pre-tender notice.

Aspect pratique65/100

As a planned notice, e-submission details and a specific contract start date are not yet applicable. The contract duration is specified. Financing information is not detailed, and the notice does not indicate if it is EU funded.

No e-submission details available (expected for planned notice).
Financing information not detailed.
Cohérence des données90/100

Key fields like title, reference, organization, estimated value, and CPV are populated logically. Dates are presented as planned, and there are no reported disputes or suspensions, ensuring good data consistency for a planned notice.

Durabilité50/100

The notice does not mention any specific green procurement, social aspects, or innovation focus. It is also not indicated if the procurement is EU funded, which could imply a lack of emphasis on these areas.

Not green procurement.
No social criteria mentioned.

Points forts

Clear title and reference number.
Organization and estimated value disclosed.
CPV code provided.
Planned nature clearly indicated.

Préoccupations

Lack of specific tender requirements and evaluation criteria.
No document content available.
Uncertainty regarding the exact publication date of the tender notice.

Recommandations

1. Publish the full tender notice with all specified requirements and evaluation criteria.
2. Clarify the expected timeline for the tender publication.
3. Consider incorporating sustainability and innovation aspects into the forthcoming tender.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline