Skip to main content
Retour aux appels d'offres

Wood Green Central - Chef de Projet Développement (DPM)

Ouvert
Date limite
5 jours restants
Avril 02, 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
020475-2026
Valeur
£480,000
Lieu
London, Royaume-Uni
Publié
Mars 20, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 06, 2026

Date limite pour les questions

Mars 26, 2026

Date limite de soumission

Avril 02, 2026

Date de début du contrat

Mai 14, 2026

Intelligence acheteurPRO
🔒
Débloquer l'intelligence acheteur
Consultez les modèles de dépenses, les procédures préférées et plus encore.
Passer au Professionnel →
Budget
£480,000
Durée
23 mois
Lieu
London
Type
Restricted Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Chef de Projet Développement (DPM) côté client pour diriger le développement, la soumission et la détermination de la demande de permis de construire hybride pour les sites de Wood Green Central

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

5 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (1)
Financier (1)
SUBMISSION REQUIREMENTS1
--[No specific requirements listed]
MANDATORY EXCLUSION GROUNDS1
--[No specific requirements listed]
ELIGIBILITY REQUIREMENTS1
--[No specific requirements listed]
TECHNICAL CAPABILITY REQUIREMENTS1
--Client-side Development Project Manager (DPM) to lead the development, submission and determination of the hybrid planning application for Wood Green Central sites
FINANCIAL REQUIREMENTS1
--[No specific requirements listed]

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for a Development Project Manager is generally well-structured with clear basic information and a reasonable estimated value. However, it lacks detailed requirements and evaluation criteria, and the submission process could be more streamlined.

Répartition du score

Conformité légale75/100

The tender adheres to basic legal requirements by providing a reference number, organization, CPV code, and a clear procedure type. The estimated value is disclosed and not classified. The submission deadline is provided, though its adequacy for a restricted procedure is not explicitly assessed here. No disputes are reported.

Clarté80/100

The core objective of the tender – to appoint a Development Project Manager for the Wood Green Central sites – is clearly stated. However, the AI-extracted requirements section is notably sparse, lacking specific details on mandatory exclusion grounds, eligibility, technical capability, financial requirements, and submission procedures. This vagueness hinders a comprehensive understanding of the precise expectations.

Lack of specific requirements in AI-extracted section
Exhaustivité70/100

Most basic information is present, including title, reference, organization, estimated value, and contract duration. The CPV code is provided. However, the absence of detailed requirements and evaluation criteria, along with only 0 documents with content available, significantly impacts the completeness of the tender documentation.

Missing detailed requirements
No document content available
Équité85/100

The tender is a restricted procedure, which inherently limits the pool of bidders. The estimated value is disclosed, and the criteria for selection are not specified, which is a concern for transparency. The use of e-procurement is noted as a positive aspect for accessibility. There are no obvious requirements tailored to specific companies.

Missing evaluation criteria
Aspect pratique65/100

The tender is marked as 'E-Procurement', suggesting an online submission process. A contract start date and duration are specified. However, the 'Issues' section flags 'No e-submission', which contradicts the 'E-Procurement' characteristic, creating ambiguity. Financing information is not explicitly detailed.

Ambiguity regarding e-submission
Cohérence des données90/100

Key fields such as title, reference, organization, estimated value, and dates are populated. The contract start date is logically after the submission deadline. No suspension or disputes are reported, contributing to good data consistency.

Durabilité50/100

The tender does not explicitly mention any green procurement, social aspects, innovation, or EU funding. This indicates a lack of focus on sustainability criteria within the tender's framework.

No green procurement mentioned
No social criteria mentioned

Points forts

Clear basic information (title, reference, organization, value)
CPV code provided
E-Procurement noted
No reported disputes

Préoccupations

Lack of detailed requirements and evaluation criteria
No document content available
Ambiguity regarding e-submission
Absence of sustainability considerations

Recommandations

1. Provide detailed technical, financial, and eligibility requirements.
2. Specify clear evaluation criteria for bidders.
3. Clarify the e-submission process and ensure document availability.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline