Technical advisor services for the development of a Carbon Capture and Storage (CCS) facility at the Edmonton EcoPark and integration with a potential future CO2 transport and permanent storage solution

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Juin 27, 2023
Détails du contrat
Catégorie
Autre
Référence
023589-2023
Valeur
£1,698,492
Lieu
Inner London - East, Royaume-Uni
Publié
Février 24, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Août 11, 2023

Date limite pour les questions

Juin 20, 2023

Date limite de soumission

Juin 27, 2023

Budget
£1,698,492
Durée
Non spécifié
Lieu
Inner London - East
Type
Autre

Description originale de l'appel d'offres

North London Waste Authority (the Authority) is seeking a consultant to provide technical advisor services for the development of a Carbon Capture and Storage (CCS) facility at the Edmonton EcoPark and integration with a potential future CO2 transport and permanent storage solution. This procurement relates to the Strategic Assessment Stage, Stages 1 and 2. However, progression from the Strategic Assessment Stage to subsequent stages will require approval from the Authority's Members and will be subject to satisfying the requirements of the gateway project assurance process as per HM Treasury Guidance. The Authority may, subject to the relevant approvals being in place, progress to Stage 1 and 2. For the overall CCS project, the Authority will use the staged approach as outlined in the HM Treasury guidance to developing the project business case. Stages 3 to 5 are not part of this appointment. The stages are summarised below: Strategic Assessment: Determining the strategic context and undertaking the Strategic Assessment - Enabling early decision-making and governance over early-stage funding. Clarifying options and agreeing assumptions and building the strategic case with industry and transport and storage operators. Stage 1: Business Justification - Scoping the scheme and preparing the Strategic Outline Case - Narrowing the options to a target solution and enabling delivery through appropriate stakeholder partnerships and agreements. Stage 2: Planning the scheme and preparing the Outline Business Case - Refinement of the preferred solution, development of the environmental statement and submission of a full planning application, and preparing the Outline Business Case. For the Strategic Assessment Stage, Stage 1 and Stage 2, the services will involve: A full suite of project management services, including the development of a project execution plan and a full programme of the full project lifecycle, risk management and governance requirement. The Consultant will lead the development of the project's business and public benefits case and develop and implement a stakeholder management plan, and will establish relationships with elements of the supply chain on behalf of the Authority. The consultant will carry out a strategic assessment and a pre-front end engineering and design study to establish how the CCS will integrate with the Energy Recovery Facility ("ERF") and any future transport and permanent storage infrastructure. They will consider the cost, schedule, health and safety, and permitting implications of integration with the ERF. Looking ahead, they will develop transport solutions in anticipation of future off-shore storage, including the development of routing options. They will also provide technical advice and support as required for the Authority's external communication activities.
Achats écologiques

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'analyse des exigences par l'IA n'est pas encore disponible pour cet appel d'offres.

Les exigences seront générées automatiquement lorsque les documents de l'appel d'offres seront traités.


Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

Analyse en attente

L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.

Ajouter au Pipeline