RENOUVELLEMENT DU CÂBLAGE DE LA CASERNE DE POMPIERS DE BRIERLEY HILL

Ouvert
Date limite
2 jours restants
Mars 30, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
017972-2026
Valeur
£216,000
Lieu
West Midlands, Royaume-Uni
Publié
Mars 20, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Février 27, 2026

Date limite pour les questions

Mars 23, 2026

Date limite de soumission

Mars 30, 2026

Date de début du contrat

Juin 21, 2026

Intelligence acheteurPRO
🔒
Débloquer l'intelligence acheteur
Consultez les modèles de dépenses, les procédures préférées et plus encore.
Passer au Professionnel →
Budget
£216,000
Durée
7 mois
Lieu
West Midlands
Type
Open Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Ce projet vise à refaire le câblage de la caserne de pompiers de Brierley Hill, y compris le retrait de tous les câbles/appareillages de commutation/tableaux de distribution/éclairages existants et leur remplacement par de nouveaux conformément aux spécifications. Une décision devra être prise quant à la fermeture ou non de la caserne pendant la durée des travaux ; les documents d'appel d'offres présentent deux options qui devront être réalisées et chiffrées. Option 1 : Travaux à réaliser en une seule phase, pendant que le bâtiment est vacant Option 2 : Travaux à réaliser de manière phasée, pendant que le bâtiment est occupé/opérationnel La décision sera prise par les dirigeants de l'organisation sur la base des informations fournies dans cette réponse à l'appel d'offres, y compris les coûts, les délais, les perturbations sur le site, la santé et la sécurité des entrepreneurs et du personnel du WMFS.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

11 exigences dans 5 catégories

Soumission (5)
Obligatoire (1)
Conformité (1)
Technique (3)
Financier (1)
SUBMISSION REQUIREMENTS5
--Bids must be submitted by the deadline: 2026-03-30T00:00:00.
--Bids must be provided in English, Estonian, Latvian, Polish, and Lithuanian.
--Bids must include detailed costings and timeframes for both Option 1 and Option 2.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS1
--Bidders must be capable of providing electrical installation work (CPV: 45310000).
TECHNICAL CAPABILITY REQUIREMENTS3
--Ability to rewire a fire station, including removal of existing cables, switchgear, distribution boards, and lighting.
--Ability to provide two distinct costings and plans for the works: Option 1 (works during building vacation) and Option 2 (works while building is occupied/operational).
--The decision on which option to implement will be based on costs, timeframes, site disruption, and Health and Safety of contractors and WMFS personnel.
FINANCIAL REQUIREMENTS1
--The estimated value of the tender is 216000 EUR.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for the Brierley Hill Fire Station rewire is generally well-structured with clear objectives and financial information. However, it lacks specific evaluation criteria and details on document access, impacting its overall quality.

Répartition du score

Conformité légale75/100

The tender appears to comply with general procurement regulations, including a proper CPV code and an open competition procedure. Deadlines are provided, though the submission deadline might be considered short given the scope. No disputes are reported. The procedure is 'Below threshold - open competition', which implies adherence to specific national or regional rules for smaller procurements.

Clarté80/100

The description of the works is clear, outlining the need for a full rewire and the two distinct options for execution (vacated vs. occupied building). The criteria for decision-making between the options are also clearly stated, focusing on cost, timeframe, disruption, and health and safety.

Exhaustivité70/100

Basic information such as title, reference, organization, estimated value, contract duration, and start date are present. The CPV code is provided. However, the tender documents themselves are not accessible or summarized, and crucial evaluation criteria are missing, which significantly impacts completeness.

No document content available
Missing evaluation criteria
Équité85/100

The tender is an open competition, which promotes fairness. The estimated value is disclosed, and the criteria for selecting between the two work options are objective. However, the lack of access to tender documents and specified evaluation criteria could hinder a fair assessment by potential bidders.

No document content available
Missing evaluation criteria
Aspect pratique65/100

The tender specifies a contract start date and duration. However, the absence of information regarding e-submission, a direct URL for documents, and details on financing makes it less practical for bidders. The requirement for bids in multiple languages (English, Estonian, Latvian, Polish, Lithuanian) adds complexity.

No e-submission
No document URL
Cohérence des données90/100

Key fields such as title, reference, organization, value, and dates are populated. The contract start date and submission deadline are logically sequenced. No suspension or disputes are indicated, contributing to high data consistency.

Durabilité50/100

There is no explicit mention of green procurement, social aspects, innovation, or EU funding in the provided tender information. This suggests a lack of focus on sustainability criteria.

Not green procurement
No social criteria

Points forts

Clear project description and objectives
Disclosure of estimated value and contract duration
Open competition procedure

Préoccupations

Missing tender documents and evaluation criteria
Lack of e-submission and document access details
Absence of sustainability considerations

Recommandations

1. Provide full access to tender documents and clearly state evaluation criteria.
2. Specify the e-submission process and provide direct links to all relevant documents.
3. Incorporate sustainability criteria into the tender requirements.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline