Skip to main content
Retour aux appels d'offres

Wood Green Central - Chef de Projet Développement (DPM)

Ouvert
Date limite
5 jours restants
Avril 02, 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
020793-2026
Valeur
£480,000
Lieu
London, Royaume-Uni
Publié
Mars 20, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 09, 2026

Date limite pour les questions

Mars 26, 2026

Date limite de soumission

Avril 02, 2026

Date de début du contrat

Mai 14, 2026

Intelligence acheteurPRO
🔒
Débloquer l'intelligence acheteur
Consultez les modèles de dépenses, les procédures préférées et plus encore.
Passer au Professionnel →
Budget
£480,000
Durée
23 mois
Lieu
London
Type
Restricted Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Chef de Projet Développement (DPM) côté client pour diriger l'élaboration, la soumission et la détermination de la demande de permis de construire hybride pour les sites de Wood Green Central.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

5 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (1)
Financier (1)
SUBMISSION REQUIREMENTS1
--No specific requirements listed.
MANDATORY EXCLUSION GROUNDS1
--No specific requirements listed.
ELIGIBILITY REQUIREMENTS1
--No specific requirements listed.
TECHNICAL CAPABILITY REQUIREMENTS1
--No specific requirements listed.
FINANCIAL REQUIREMENTS1
--No specific requirements listed.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for a Development Project Manager is generally well-structured with clear basic information and a disclosed value. However, it lacks specific details on evaluation criteria and technical/financial requirements, impacting completeness and clarity.

Répartition du score

Conformité légale75/100

The tender adheres to basic legal requirements with a specified CPV code and a clear procedure. The deadlines appear reasonable given the context. No disputes are reported. The primary concern is the lack of explicit evaluation criteria, which is a regulatory expectation.

Missing evaluation criteria specified
Clarté80/100

The description of the service required is clear, outlining the role of a Development Project Manager for a specific planning application. However, the absence of detailed requirements for eligibility, technical capability, and financial standing makes the overall clarity of what is expected from bidders moderate.

No specific eligibility requirements listed
No specific technical capability requirements listed
Exhaustivité70/100

Most basic information is present, including title, reference, organization, value, and duration. However, the critical absence of detailed requirements (eligibility, technical, financial) and the lack of content summaries for the attached documents significantly reduce its completeness.

No specific requirements listed for eligibility, technical capability, or financial standing
No document content available for attached documents
Équité85/100

The tender is characterized by e-procurement and a disclosed value, promoting fairness. The deadlines appear reasonable. The main concern is the lack of specified objective criteria for evaluation, which could lead to subjective assessments. No requirements appear tailored to specific companies.

No evaluation criteria specified
Aspect pratique65/100

The tender is active and has a specified contract start date and duration. E-procurement is indicated. However, the lack of explicit financing information and the absence of detailed submission requirements reduce its practicality for bidders needing to understand the full scope of the process.

No financing information specified
No specific submission requirements listed
Cohérence des données90/100

Key fields such as title, reference, organization, value, and dates are populated logically. There are no reported disputes or suspensions. The dates provided are consistent and do not raise immediate concerns.

Durabilité50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation focus. It is also not indicated as EU funded, suggesting a limited emphasis on sustainability criteria.

Not green procurement
No social criteria

Points forts

Clear title, reference, and organization details
Estimated value and contract duration disclosed
CPV code provided
E-procurement indicated

Préoccupations

Missing specific evaluation criteria
Lack of detailed eligibility, technical, and financial requirements
No content summaries for attached documents
Limited emphasis on sustainability aspects

Recommandations

1. Specify clear and objective evaluation criteria.
2. Provide detailed requirements for eligibility, technical capability, and financial standing.
3. Include summaries or full content for all attached tender documents.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline