Vous souhaitez soumissionner aux marchés publics ? Découvrez notre service de préparation TaaS
Retour aux appels d'offres

Pierhead – Architect Led Design Team (RIBA 0–2)

Ouvert
Date limite
76 jours restants
Août 05, 2026
Détails du contrat
Catégorie
Open Procedure
Référence
045256-2026
Valeur
£600,000
Lieu
United Kingdom, Royaume-Uni
Publié
Mai 14, 2026
Organisation
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mai 18, 2026

Date de début du contrat

Septembre 04, 2026

Budget
£600,000
Durée
13 mois
Lieu
United Kingdom
Type
Open Procedure

Description originale de l'appel d'offres

Cardiff Council seeks to appoint a suitably qualified and experienced multi disciplinary design team for its site on Pierhead Street, Butetown. The Council intends to redevelop vacant brownfield land off Pierhead Street to deliver a residential led, mixed use development. The scheme presents an opportunity to co locate a proposed Metro station promoted by Transport for Wales (TfW). The appointed design team will work collaboratively with the Council and key stakeholders to develop a vision and design proposals up to and including RIBA Stage 2. This will enable the Council to progress the scheme into later stages alongside a development partner. The Pierhead Street site forms part of Cardiff Council’s ambitious housebuilding programme, which will deliver over 4,000 new homes across the city. This award winning programme represents one of the largest council housing build initiatives in Wales, supported by investment of approximately £850 million to deliver affordable homes at scale and pace. Site constraints /opportunities The site is located in a dynamic, waterfront district within Cardiff Bay, a vibrant and culturally rich area at the heart of the city’s historic docklands. The site is approx 0.88ha and is comprised of predominantly vacant land with a small, single storey building lies at the far northwest of the site. The site has been identified by Transport for Wales (TfW) as a possible location for a new station as part of the Cardiff Crossrail Project which is an integral part of the South Wales Metro plans which would need to be incorporated into the development options for the site. The site comprises of a relatively flat, derelict area of land. It is visually prominent, with wide views out to the north overlooking the Eastern Bay Link Road (A4232). Key constraints include: Buried dock wall TFW proposed crossrail High Voltage cables Dock feeder culvert Contamination and made ground Access constraints Key objectives: Deliver a sustainable, inclusive mixed tenure neighbourhood that is welcoming to residents Optimise site capacity to deliver 300–350 apartments, comprising: Minimum 200 units for private rent and/or shared ownership in one high rise block (BSA Cat 1 HRB) Approximately 150 units for social rent in a separate block (BSA Cat 1 HRB) Both blocks should incorporate A1 and A3 uses at ground floor All social rented units must meet WDQR space standards. Private rented units are not required to comply with WDQR. Social rented flats must meet EPC A or WG approved alternatives (AECB / Passivhaus aligned). The Private rented /sale block should also ideally meet EPC A if possible. No fossil fuels on any house type. The design team are expected to provide options for the energy strategy for the blocks and provide options appraisal for different solutions, such as GSHP, ASHP and all electric system as well as options for uplifts to AECB or Passivhaus standards Design teams are expected to consider innovative solutions to overheating risks in high rise buildings Green infrastructure, placemaking principles and secure by design principles should be embedded into the scheme to ensure a desirable, sustainable, safe and attractive environment for residents and visitors Scope of services: We are looking to appoint an Architect lead multi-discipline design team with highrise building experience to produce a scheme up to and including RIBA stage 2. This includes reviewing existing documents and designing a project to the RIBA stage 2 plan of works, to allow the Council to progress to a Pre Contract Service Agreement (PCSA) with a development partner, who will submit Planning and ultimately implement the scheme The architect team would project manage the scheme and provide detailed programmes, risks and scheme updates to the client and manage the consultant team. The design team should comprise the following consultants : Architect – lead including Project manager, principal designer, urban design Engineer – civils Engineer – structural MEP consultant Transport planning Planning consultant Landscape architect Fire consultant

Analyse des risques

L'analyse des risques n'est pas encore disponible pour les appels d'offres de ce pays. Actuellement pris en charge : Estonie, Lettonie, Lituanie, Pologne, France, Royaume-Uni, Danemark, Pays-Bas, Norvège et Finlande.

Stratégie gagnante

Obtenez une stratégie gagnante générée par l'IA et adaptée à cet appel d'offres. Comprend un score de probabilité de succès, les opportunités et défis clés, les axes prioritaires de l'offre, une analyse du positionnement concurrentiel et des recommandations concrètes pour maximiser vos chances.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'IA extrait et organise toutes les exigences des documents de l'appel d'offres — qualifications obligatoires, spécifications techniques, conditions financières et règles de soumission — clairement catégorisées pour que vous sachiez exactement ce qui est requis pour soumissionner.

Se connecter

Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

3 documents disponibles avec des résumés IA

OCDS RecordDOC
045256-2026_ocds_record.json

Aucun résumé n'est disponible pour ce document.

OCDS Release PackageDOC
045256-2026_ocds_release.json

Aucun résumé n'est disponible pour ce document.

Official PDF VersionPDF
045256-2026_official.pdf

Aucun résumé n'est disponible pour ce document.

Aperçu des documents

Inscrivez-vous pour consulter les résumés et l'analyse des documents

Score de qualité

Analyse qualitative complète de cet appel d'offres évaluant la conformité juridique, la clarté, l'exhaustivité, l'équité, la faisabilité, la cohérence des données et la durabilité sur une échelle de 0 à 100 avec une ventilation détaillée et des recommandations.

Se connecter

Ajouter au Pipeline