3631/JN - Spin Test Facility

Fermé

Date limite de soumission dépassée

La date limite de soumission de cet appel d'offres est dépassée et il n'accepte plus de candidatures. Les informations ci-dessous sont conservées à titre de référence.

Parcourir les appels d'offres actifs
Date limite
Expiré
Juillet 27, 2023
Détails du contrat
Catégorie
Autre
Référence
024965-2023
Valeur
£1,039,900
Lieu
South Yorkshire, Royaume-Uni
Publié
Février 24, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Août 24, 2023

Date limite pour les questions

Juillet 20, 2023

Date limite de soumission

Juillet 27, 2023

Budget
£1,039,900
Durée
Non spécifié
Lieu
South Yorkshire
Type
Autre

Description originale de l'appel d'offres

The University of Sheffield's Department of Electronic and Electrical Engineering and AMRC with funding from Innovate UK are looking to acquire a spin-test facility (also colloquially known as 'spin-rig') in support of research in high speed rotating components and assemblies. This capability will form part of a UK-wide network of facilities and capabilities which are available to UK industry and academia to further R&D and supply chain development in power electronics, machines and drives. Its principal role will be to facilitate mechanical testing, model validation and certification of high performance electrical machine rotors, including an ability to determine burst speeds and assess the nature of the burst. Although burst capability and overspeed testing is an essential requirement, much of the demand is driven by the need to characterise rotors and shaft assemblies in terms of radial growth at normal operating conditions and to characterise low-cycle fatigue. The system will consist of an evacuated chambers into which the test-piece is located and connected to a drive mechanism that enables its mechanical response to be quantified over a prescribed speed range as set out in the requirements section below. The facility will also be used in support of wider rotatives research across the University Sheffield, in many cases in collaboration with industry and/or academic partners, where likely use cases include interalia tool assemblies, compressor and turbine parts. The facility will be an R&D facility, in many cases testing one-of-a-kind test pieces and not a production facility and hence there is little or no premium in rapid / automated set-up of repeated tests. The equipment will be located in an existing industrial unit within the Advanced Manufacturing Research Centre (AMRC) which has a 400mm thick cast concrete floor, extensive services, large loading doors and a10 tonne overheard crane.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

L'analyse des exigences par l'IA n'est pas encore disponible pour cet appel d'offres.

Les exigences seront générées automatiquement lorsque les documents de l'appel d'offres seront traités.


Exigences de base

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

Analyse en attente

L'analyse de la qualité de cet appel d'offres est en cours. Veuillez vérifier à nouveau dans quelques instants.

Ajouter au Pipeline