Skip to main content
Retour aux appels d'offres

Gestion de la construction pour le renouveau du Barbican

Ouvert
Date limite
101 jours restants
Juillet 05, 2026
Détails du contrat
Catégorie
Restricted Procedure
Référence
017226-2026
Valeur
£4,800,000
Lieu
London, Royaume-Uni
Publié
Mars 19, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Février 26, 2026

Date limite pour les questions

Juin 28, 2026

Date limite de soumission

Juillet 05, 2026

Date de début du contrat

Juillet 05, 2026

Budget
£4,800,000
Durée
43 mois
Lieu
London
Type
Restricted Procedure
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

La City of London Corporation (la City) invite à soumissionner pour la fourniture de services de gestion de la construction dans le cadre du programme de renouvellement du Barbican. Le Barbican Centre, qui est un département de la City of London Corporation (CoL), cherche à nommer un Gestionnaire de Construction (CM) pour fournir des services de gestion de la construction pour le Programme de Renouvellement du Barbican (BRP). La nomination débutera en juin 2026 et se poursuivra jusqu'en mars 2030, avec une valeur de rémunération estimée à environ 4 millions de livres sterling, pour un coût de construction total d'environ 176 millions de livres sterling. Le CM sera nommé directement par la CoL et agira en tant que principal partenaire de livraison du client, responsable de la gestion et de la coordination d'une série d'entrepreneurs spécialisés engagés sous contrat séparé avec la CoL.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

23 exigences dans 5 catégories

Soumission (3)
Obligatoire (1)
Conformité (6)
Technique (10)
Financier (3)
SUBMISSION REQUIREMENTS3
--Tenders are invited for the provision of Construction Management Services.
--The appointment will commence in June 2026 and extend through to March 2030 (44 months), with a potential extension of up to 12 months.
--The deadline for submission is 2026-07-06T00:00:00+01:00.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS6
--Must be capable of delivering Construction Management Services for the Barbican Renewal Programme.
--Must be able to operate within a live, occupied environment subject to significant heritage and conservation constraints.
--Must be able to manage multiple workstreams progressing simultaneously across different areas.
TECHNICAL CAPABILITY REQUIREMENTS10
--Experience in developing and maintaining master construction programmes.
--Experience in advising on procurement strategy.
--Experience in leading the procurement of trade contractor packages.
FINANCIAL REQUIREMENTS3
--The estimated fee value for the Construction Management Services is c. £4m.
--The total construction cost is approximately £176m.
--The value of the tender is 4,800,000 EUR.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender for Barbican Renewal Construction Management is generally well-structured with clear technical requirements, but lacks specific evaluation criteria and details on sustainability, impacting its overall quality.

Répartition du score

Conformité légale75/100

The tender adheres to general legal compliance by providing a clear procedure, CPV code, and no immediate dispute flags. However, the submission deadline appears very tight relative to the contract start date, which could be a compliance issue if not handled correctly. The absence of a reveal date is a minor procedural oversight.

Submission deadline is the same as the contract start date, potentially leaving insufficient time for evaluation.
Clarté80/100

The description of the services required is detailed and comprehensive, outlining the scope, context, and expected responsibilities of the Construction Manager. The technical requirements are clearly documented, though specific evaluation criteria are missing.

Evaluation criteria are not specified.
Exhaustivité70/100

Most basic information is present, including estimated value, duration, and contract start. However, the lack of content in the attached documents and the missing reveal date detract from its completeness.

No document content available for review.
Missing reveal date.
Équité85/100

The tender appears fair, with full document access implied (though content is missing), disclosed value, and objective technical requirements. The procedure is competitive. There are no obvious signs of tailoring requirements to specific companies.

Aspect pratique65/100

The tender specifies a contract start date and duration. However, the lack of information regarding e-submission and financing details limits its practicality for potential bidders.

No information on e-submission process.
Financing information is not detailed.
Cohérence des données90/100

Key fields such as title, organization, value, and dates are populated. The dates are logically presented, with no suspension or disputes noted. The contract duration and start date are consistent with the description.

Durabilité50/100

The tender does not explicitly mention green procurement, social aspects, or innovation. It is also not indicated as EU funded, suggesting a lack of focus on these important modern procurement characteristics.

No mention of green procurement.
No mention of social aspects.

Points forts

Detailed and clear description of services and technical requirements.
Well-defined CPV code and NUTS code.
Estimated value and contract duration are specified.
No apparent tailoring of requirements to specific companies.

Préoccupations

Missing evaluation criteria.
No document content available for review.
Submission deadline is the same as the contract start date.
Lack of information on sustainability aspects.
No details on e-submission process.

Recommandations

1. Specify clear evaluation criteria to guide bidders.
2. Provide access to full tender documents with content.
3. Re-evaluate the submission deadline to allow adequate time for proposal preparation and evaluation.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Nouveau service

Vous voulez qu'on s'occupe de cet appel d'offres ?

Nos experts en marchés publics préparent tout. Solution éprouvée — vous relisez, validez et soumettez.

~1hVotre temps uniquement
80%+80%+
$0D'avance
Voir la comparaison complète
Sans TaaSAvec TaaS
40–80 heures
Temps de préparation
~1 heure
Votre temps uniquement
15–25%
Taux de réussite moyen
80%+
Taux de réussite
Risque d'erreurs
Vérification manuelle
QA expert
Contrôle de conformité
Vous faites tout
Gérez tout vous-même
Nous faisons tout
Service clé en main
Gagnons cet appel d'offres !
Payez uniquement en cas de victoire — frais de succès uniquement · Utilisé par plus de 400 entreprises
Ou faites-le vous-même

Ajouter au Pipeline