Organisme d'achats publics — Nouvelle-Zélande
Nouvelle-Zélande : New Zealand Transport Agency (Waka Kotahi) - HISTORIC a publié 294 appels d’offres.
7 sont ouverts aux offres au 29.09.2026.
Ses achats couvrent 3 divisions CPV, le plus souvent travaux de construction.
Sur 222 marchés attribués, la valeur médiane est de NZD 1.5m.
Le total de ses attributions publiées atteint NZD 6.7bn.
This is a Physical Works contract for the construction of a small concrete retaining wall at the base of an existing sli...
NZ Transport Agency (NZTA) intends to undertake a procurement for an Enabling Works contractor to support the constructi...
This is a Physical Works contract for the rockfall mitigation, drainage improvements, and slope stabilisation treatments...
This is a Physical Works contract for replacement of the Coal Creek Overbridge. The permanent contract works include: • ...
This is a Physical Works contract for the SH1 Ocean Beach Resilience Project, to raise the SH1 road level by up to 2.2m ...
This is a Physical Works contract for repairs to Hawkswood Culvert located below State Highway 1 (SH1S) at RP 195/12.3. ...
Mesuré à partir des données publiées par New Zealand Transport Agency (Waka Kotahi) - HISTORIC — aucune estimation, aucun conseil générique.
| Appel d'offres | Gagnant | Appel d'offres clôturé | Valeur du marché |
|---|---|---|---|
| VFM SH 27 Horrell – No 4 RTB | Cambridge Excavators Limited | 11 August 2026 | NZD 574.2k |
| 13038 - Cambridge to Piarere (C2P) Online Construction Contr... | Stellar Projects Ltd | 28 July 2026 | NZD 16.8m |
| SH29 Tauriko West Utilities Investigation | GROUND SCAN NZ LIMITED | 17 July 2026 | NZD 688.9k |
| SH1 & SH88 Dunedin City and Hospital PS - PQM | GHD | 16 July 2026 | NZD 1.1m |
| SH25 Ramarama Bridge Replacement | BRIAN PERRY CIVIL LIMITED | 16 July 2026 | NZD 10m |
| Waikare Gorge Realignment – Pou Arahi | KURA O RUA LIMITED | 14 July 2026 | NZD 697.3k |
Les marchés sont datés selon la date de clôture de l'appel d'offres — les dates d'attribution ne sont pas publiées dans les données source.
| Fournisseur | Marchés | Valeur totale |
|---|---|---|
| FULTON HOGAN LIMITED | 12 | NZD 111.1m |
| BECA LIMITED | 8 | NZD 30.5m |
| Fulton Hogan | 7 | NZD 47.4m |
| Fulton Hogan Canterbury | 7 | NZD 22.5m |
| Conscpec Construction | 7 | NZD 7.5m |
| Downer NZ Ltd | 6 | NZD 331.6m |
| HEB Construction | 6 | NZD 50.8m |
| DOWNER NEW ZEALAND LIMITED | 6 | NZD 30.3m |