Skip to main content
Vil du afgive tilbud på offentlige udbud? Se vores TaaS-service til forberedelse af udbud
Udbud

Pilotprojekt for miljøvenlig restaurering af statsvej 1, Tallinn-Narva vejen, km 40.3-50.4

Åben
Frist
3 dage tilbage
April 07, 2026
Kontrakt detaljer
Kategori
Byggeri
Reference
306617
Værdi
€1,670,000
Lokation
Estonia, Estland
Udgivet
Marts 09, 2026
Organisation
CPV-kode
Evalueringskriterier
Cost of the pilot project for environmentally friendly restoration of National Road 1 Tallinn-Narva section km 40.3-50.475%
CO2 emission standards of N-category trucks used5%
CO2 emission standards of construction machinery used5%
Use of biofuel in road vehicles used for asphalting works5%
Use of (bio)fuel in asphalt production5%
Storage of aggregate materials used in asphalt mixtures5%
Projekttidslinje

Udbud offentliggjort

Marts 09, 2026

Frist for spørgsmål

Marts 31, 2026

Frist for tilbud

April 07, 2026

Åbning af udbud

April 07, 2026

VinderchancePRO
🔒
Opgrader til Professional
Se din estimerede vinderchance baseret på historiske data.
Opgrader til Professionel →
OrdregiverindsigtPRO
🔒
Lås op for ordregiverindsigt
Se forbrugsmønstre, foretrukne procedurer og mere.
Opgrader til Professionel →
SektorsindsigtPRO
🔒
Lås op for sektorsindsigt
Se gennemsnitlige vinderpriser, konkurrenceniveauer og markedstrends.
Opgrader til Professionel →
Budget
€1,670,000
Varighed
5 måneder
Lokation
Estonia
Type
Byggeri
75
Kvalitetsscore/100
God
Markedsbenchmark
Gns. Vindende Pris
€524,963
Gns. Tilbud
4.7
Konkurrence
Medium
SMV Vindere
94%
5,932 udbud analyseret

Original udbudsbeskrivelse

Pilotprojekt for miljøvenlig restaurering af statsvej 1, Tallinn-Narva vejen, km 40.3-50.4, i overensstemmelse med betingelserne i udbudsmaterialet.
Grønt IndkøbElektronisk Afsendelse

Kør risikoanalyse

Identificer potentielle risici, uoverensstemmelser og advarselstegn på tværs af alle udbudsdokumenter. Få en detaljeret risikorapport med alvorlighedsgrader og anbefalinger til afhjælpning.

Log ind

Vinderstrategi

AI-drevet analyse af dette udbuds krav, muligheder og udfordringer. Få strategiske indsigter for at maksimere din vinderchance.

65%
Estimeret vinderchanceModerat match

This tender prioritizes cost (75%) but significantly rewards environmental performance (25%). A winning strategy will focus on aggressive cost optimization while demonstrating superior, quantifiable environmental credentials, particularly in CO2 emissions and biofuel usage. Leveraging pilot project status for innovation in sustainable practices is key.

Nøglebudskaber til at vinde

Cost-effective sustainable road restoration: Delivering the lowest project cost while exceeding environmental expectations.

Pioneering green infrastructure: Demonstrating leadership in environmentally conscious road construction through this pilot project.

Optimized emissions for a cleaner future: Minimizing CO2 impact through advanced fleet and production technologies.

Nøglemuligheder
Significant weighting for environmental criteria (25%) allows for strong differentiation beyond cost.
Pilot project status encourages innovative and best-practice approaches to environmental solutions.
The 'economic advantage' is tied to both total cost and CO2 emission standards, creating a clear pathway to optimize scoring.
Nøgleudfordringer
High weighting of cost (75%) necessitates aggressive pricing, potentially squeezing margins.

Focus on operational efficiencies, lean project management, and leveraging economies of scale in material procurement. Explore opportunities for value engineering that do not compromise environmental performance.

Detailed and specific environmental requirements require meticulous documentation and proof of compliance.

Develop a dedicated environmental compliance matrix, gather all necessary certifications and data for vehicles, machinery, and materials well in advance. Engage with suppliers to ensure their compliance aligns with tender requirements.

Ideel tilbudsgiverprofil
A road construction company with a proven track record in asphalt works, possessing modern, low-emission vehicle fleets and construction machinery. They should have established relationships with biofuel suppliers and a clear understanding of environmentally friendly aggregate storage methods. Experience with pilot projects and a proactive approach to sustainability reporting will be advantageous.
Nøglekrav
Completed cost list in Excel format
Self-declaration (Hankepass) confirming fulfillment of conditions and qualification requirements
Confirmation of asphalt material storage for environmental friendliness (HD VII)
Confirmation of EURO emission standards of trucks used for material transport (HD V)
Confirmation of fuel type in asphalt production (biofuel, natural gas, or neither) (HD IX)
Confirmation of biofuel usage rate for asphalt mixture transport (HD VIII)
Confirmation that construction machinery meets specific emission standards (HD VI)
Nøgledifferentiatorer
Quantifiable CO2 reduction beyond minimum requirements through advanced fleet management and biofuel integration.
Demonstrated innovation in aggregate storage methods that significantly minimize environmental impact.
A comprehensive and transparent cost breakdown that clearly articulates value for money, even at a competitive price point.
Muligheder for social værdi
While social aspects are not explicitly required, consider incorporating a commitment to local employment or skills development within the project team as a voluntary enhancement, if feasible without impacting cost competitiveness.
Fokusområder for tilbud
Project Cost75.0%

Develop a highly competitive and lean cost structure. Conduct thorough cost analysis, identify all potential cost-saving measures, and ensure accurate estimation of all direct and indirect costs. Benchmark against similar projects if possible.

CO2 emission standards of N-category trucks used5.0%

Prioritize the use of the newest EURO emission standard trucks available. If possible, use electric or hybrid trucks for shorter hauls. Clearly document the EURO standards of all proposed vehicles.

CO2 emission standards of construction machinery used5.0%

Utilize Stage 5 emission standard machinery wherever possible. Document the emission standards of all proposed machinery. Consider rental options for the newest emission standard equipment if own fleet is not fully compliant.

Storage of aggregate materials used in asphalt mixtures5.0%

Propose covered storage solutions that prevent runoff and dust. Detail the materials used for covering and the methods for containment. Highlight any innovative or particularly effective storage techniques.

Use of biofuel in road vehicles used for asphalting works5.0%

Commit to the highest possible percentage of biofuel usage for transport. Clearly state the type of biofuel and the percentage. Provide evidence of supply chain reliability for biofuels.

Use of (bio)fuel in asphalt production5.0%

Prioritize the use of biofuel or natural gas in asphalt production. Quantify the percentage of biofuel usage and specify the type. Highlight any energy efficiency measures in the asphalt plant.

Anbefalinger7
Aggressively Price for Cost Leadership
KritiskHøj indsats

Given the 75% weighting for cost, the bid must be highly competitive. Conduct detailed cost-benefit analysis for all environmental initiatives to ensure they are cost-effective and do not inflate the overall price unnecessarily. Focus on operational efficiencies and lean project management.

Maximizes score for the most heavily weighted criterion, providing a strong foundation for winning.
Quantify and Maximize Environmental Performance
KritiskHøj indsats

Go beyond simply meeting minimum requirements for environmental criteria. Quantify CO2 savings, biofuel usage percentages, and environmental benefits of storage methods. Aim for the highest possible scores in all environmental categories to offset any slight cost disadvantage.

Significantly boosts the 25% environmental score, creating a strong competitive advantage.
Meticulously Complete Hankepass and Cost List
KritiskMedium indsats

Ensure the Hankepass (ESPD) is filled out electronically with absolute accuracy and completeness. The Excel cost list must be precisely formatted as requested, with all general and site preparation costs clearly itemized and justified.

Avoids mandatory exclusion or disqualification due to administrative errors.
Highlight Pilot Project Innovation
HøjMedium indsats

Frame the bid as a demonstration of leading-edge sustainable practices for a pilot project. Emphasize any innovative approaches to material handling, production, or transport that set the bidder apart and could serve as a model for future projects.

Positions the bidder as a forward-thinking partner, potentially influencing subjective aspects of evaluation.
Secure Reliable Biofuel Supply Chain
HøjMedium indsats

Confirm the availability and consistent supply of the proposed biofuel(s) for both asphalt production and transport. Document agreements with suppliers to ensure compliance throughout the contract duration.

Mitigates the risk of non-compliance with biofuel requirements, which could lead to score reduction or disqualification.
Document Emission Standards Rigorously
MediumMedium indsats

For both trucks and construction machinery, provide clear documentation of EURO and Stage emission standards. If using a mix of equipment, clearly indicate which equipment will be used for which tasks and its respective emission standard.

Ensures maximum points for CO2 emission criteria and avoids potential deductions.
Clarify Business Secrets Justification
MediumLav indsats

If any information is to be marked as a business secret, provide a clear and compelling justification for why it constitutes a business secret, as per tender requirements.

Ensures compliance with submission requirements and avoids potential issues with information disclosure.
Konkurrencemæssig positionering
Position as the most cost-effective solution that demonstrably exceeds environmental expectations, leveraging the pilot project status to showcase innovation and leadership in green road construction. Highlight a commitment to transparency in both cost and environmental impact reporting.

Konkurrenter

Opgrader for at se, hvilke virksomheder der sandsynligvis vil afgive tilbud på dette udbud, baseret på historiske indkøbsdata.

Log ind

Krav og kvalifikationer

21 krav på tværs af 5 kategorier

Indsendelse (8)
Obligatorisk (1)
Overholdelse (5)
Teknisk (6)
Finansiel (1)
SUBMISSION REQUIREMENTS8
--The deadline for submission is 2026-04-07 12:00:00.
--The duration of the contract is 5 months.
--Bidders must submit a completed cost list in Excel format.
MANDATORY EXCLUSION GROUNDS1
--The contracting authority may exclude economic operators if they have been convicted of fraud, money laundering, or terrorist financing.
ELIGIBILITY REQUIREMENTS5
--Bidders must confirm their acceptance of the tender conditions.
--Bidders must submit a completed cost list in Excel format.
--Bidders must indicate and justify any business secrets.
TECHNICAL CAPABILITY REQUIREMENTS6
--Confirmation of how asphalt materials will be stored to ensure environmental friendliness (HD VII).
--Confirmation of the EURO emission standards of trucks used for material transport (HD V).
--Confirmation of the type of fuel used in asphalt production (biofuel, natural gas, or neither) (HD IX).
FINANCIAL REQUIREMENTS1
--The tender value is 1,670,000.0 EUR.

Forhåndsvisning af Krav

Tilmeld dig for at se komplette krav og analyser

Dokumenter

12 dokumenter tilgængelige med AI-resuméer

Alltöövõtjate kontrollimise tingimused lepingu täitmise etapisPDF
306617_alltoovotjate_kontrollimise_tingimused... -- 29.9 KB

The contracting authority will check subcontractors' background in the first round regarding criminal convictions for fraud, money laundering, or terrorist financing.

Vis
VastavustingimusedPDF
306617_vastavustingimused.pdf -- 11.4 KB

Bidders must confirm acceptance of tender conditions, submit a completed cost breakdown in Excel, and identify and justify any business secrets, as well as declare if it is a joint bid.

Vis
HD IV KululoendXLS
HD IV Kululoend.xlsx -- 17.9 KB

Bidders must submit a cost breakdown including general and site preparation costs, covering sampling, permits, work area maintenance, and traffic sign removal.

Vis
HD IX Asfalditootmisel (bio)kütuse kasutamise kinnitusXLS
HD IX Asfalditootmisel (bio)kütuse kasutamise... -- 17.7 KB

Bidders must confirm their fuel usage (biofuel, natural gas, or neither) in asphalt production to meet environmental requirements.

Vis
HD VI Kasutatavate ehitusmasinate CO2- heitmenormide kinnitusXLS
HD VI Ehitusmasinate CO2 heitmenormide kinnit... -- 18.0 KB

Bidders must confirm that their construction machinery used during paving and milling operations meets specific emission standards (Stage 3, 4, or 5), with certain exceptions noted.

Vis
HD VII Asfaltsegudes kasutatavate täitematerjalide hoiustamise kinnitusXLS
HD VII Asfaltsegudes kasutatavate täitematerj... -- 17.9 KB

The bidder must confirm how they will store aggregate materials used in asphalt works to ensure environmental friendliness.

Vis
HD VIII N-kategooria maanteesõidukitel biokütuse kasutamise kinnitusXLS
HD VIII N-kategooria maanteesõidukitel bioküt... -- 17.7 KB

Bidders must confirm their biofuel usage rate for asphalt mixture transportation by selecting one of the provided categories.

Vis
HD V Kasutatavate N-kategooria veoautode CO₂-heitenormide kinnitusXLS
HD V N-kategooria veoautode CO2 heitmenormide... -- 17.7 KB

Bidders must confirm which EURO emission standard compliant trucks they will use for transporting construction materials to ensure environmentally friendly restoration.

Vis
Hindamiskriteeriumid ja hinnatavad näitajadPDF
306617_hindamiskriteeriumid.pdf -- 5.2 KB

The tender evaluation criteria include the project cost (75%) and CO2 emission standards for trucks and construction machinery, aggregate storage, and biofuel usage (25% combined).

Vis
Hankepass täiendatavate selgitustegaPDF
306617_hankepass_taiendavate_selgitustega.pdf -- 76.2 KB

The procurement pass (ESPD) is the bidder's self-declaration, serving as preliminary evidence of meeting the contracting authority's conditions and qualification requirements, but it is filled out electronically.

Vis
HD X HindamismetoodikaDOC
HD X Hindamismetoodika.docx -- 33.0 KB

This document outlines the tender evaluation methodology, where economic advantage is determined based on total cost and CO₂ emission standards of trucks.

Vis
Riigihanke alusdokumentDOC
Riigihanke alusdokument.docx -- 39.3 KB

The tender's base document contains the contracting authority's general information, communication procedures, reasons for not dividing the tender into lots, and bidder exclusion and qualification criteria, which are essential for submitting a bid.

Vis

Forhåndsvisning af Dokumenter

Tilmeld dig for at se dokumentresuméer og analyser

75
God

Udbudskvalitetsscore

This tender for a pilot project on environmentally friendly restoration of a national road section is generally well-structured with clear technical and environmental requirements. However, it lacks explicit social criteria and innovation focus, and some document formats are not machine-readable.

Scoreopdeling

Overholdelse af lovgivning75/100

The tender appears to comply with general legal requirements for public procurement. Deadlines are specified and seem reasonable for the scope. The CPV code is provided. No disputes are indicated. The procedure is clear.

Klarhed80/100

The description of the project is clear, and the AI-extracted requirements provide a good overview of what is expected. The evaluation criteria are specified, though the weighting of non-cost factors could be more detailed. Conditions are generally clear.

Fuldstændighed70/100

Most basic information is present, including estimated value, duration, and deadlines. However, the 'Location Info' is vague ('Täpne piirkond määramata' - Exact area not specified), which could be a point of concern. Several important documents are in ZIP format, which are not accessible for direct analysis.

Vague location information.
Key documents in inaccessible ZIP format.
Retfærdighed85/100

The tender is accessible electronically, and the value is disclosed. Criteria are objective, with a significant weighting for cost but also incorporating environmental factors. There are no obvious requirements tailored to specific companies, promoting a fair competition.

Praktisk anvendelighed65/100

E-submission is supported. The contract start date is not explicitly mentioned, only the duration. Financing information is not detailed. The duration is specified in months.

Contract start date not explicitly stated.
Datakonsistens90/100

Key fields such as title, reference, organization, value, and deadlines are populated. There are no indications of suspension or disputes. Dates are logically presented.

Bæredygtighed50/100

The tender strongly emphasizes 'Green Procurement' with detailed requirements for emission standards, material storage, and biofuel usage. However, it lacks explicit mention of social aspects or innovation. It is not indicated as EU funded.

No explicit social criteria.
No explicit innovation focus.

Styrker

Strong emphasis on environmental sustainability and green procurement.
Clear technical requirements for construction machinery and materials.
Electronic submission and e-procurement are facilitated.
Objective evaluation criteria with a balance between cost and environmental performance.

Bekymringer

Vague location information ('Exact area not specified').
Several critical documents are in inaccessible ZIP format.
Lack of explicit social criteria and innovation focus.
Contract start date not explicitly stated.

Anbefalinger

1. Clarify the exact project location to ensure bidders can accurately assess the scope.
2. Provide key tender documents in accessible formats (e.g., PDF) instead of ZIP archives.
3. Consider incorporating specific social procurement objectives and innovation incentives.

Forhåndsvisning af AI-scoring

Tilmeld dig for at se komplette krav og analyser

Komplet analyse af kvalitetsscore
Detaljeret opdeling af underscores
Indsigter i styrker og bekymringer
Strategiske anbefalinger

Intet kreditkort krævet • Opsætning på 2 minutter

Ny service

Vil du have os til at håndtere dette udbud?

Vores udbudseksperter forbereder alt. Det virker – du gennemgår, godkender og indsender.

~1hDin tid kun
80%+80%+
$0Forudbetaling
Se fuld sammenligning
Uden TaaSMed TaaS
40-80 timer
Forberedelsestid
~1 time
Din tid kun
15-25%
Gennemsnitlig vinderate
80%+
Vinderate
Risiko for fejl
Manuel gennemgang
Ekspert QA
Overholdelsestjek
Du gør alt
Håndter alt
Vi gør alt
End-to-end service
Lad os vinde dette udbud
Betal kun, når du vinder · 400+ virksomheder stoler på os
Eller gør det selv

Tilføj til pipeline