This tender focuses on essential infrastructure upgrades in Tallinn, presenting a solid opportunity for experienced civil engineering firms. Success hinges on demonstrating robust technical capability, meticulous adherence to safety and environmental standards, and a cost-effective, well-managed project execution plan. Proactive risk management and clear communication will be paramount.
Reliable and Efficient Infrastructure Renewal: Delivering high-quality water, sewage, and stormwater systems on time and within budget, minimizing disruption to residents and businesses.
Commitment to Safety and Sustainability: Upholding the highest standards of occupational health, safety, and environmental protection throughout the project lifecycle.
Expertise in Urban Civil Engineering: Leveraging extensive experience in complex urban environments to successfully execute challenging reconstruction and construction works.
Conduct thorough site investigations, develop detailed contingency plans in the risk analysis, and maintain open communication with AS Tallinna Vesi regarding any discoveries.
Develop a comprehensive and well-communicated traffic management plan, engage with local stakeholders early, and utilize experienced traffic management personnel.
Thoroughly vet all potential subcontractors, obtain all required documentation well in advance, and have backup options identified.
Provide detailed, step-by-step methodologies for each work package, referencing specific techniques and equipment. Emphasize experience with similar pipe materials and diameters. Clearly outline how traffic management will be integrated into the daily work plan.
Submit a comprehensive and tailored risk analysis and occupational safety plan that directly addresses the specific risks of this project (e.g., working near existing utilities, traffic). Demonstrate a proactive safety culture and robust environmental protection measures.
Ensure the tender cost form is meticulously completed, with clear justifications for all costings. Highlight any cost-saving measures or efficiencies offered. While not explicitly stated, value for money will likely be a key consideration.
Detail specific initiatives to meet and exceed green procurement requirements. This could include using sustainable materials, optimizing transport logistics, or implementing energy-efficient site operations.
Meticulously complete the ESPD and ensure all first-tier subcontractors provide the required confirmation of absence of exclusion grounds and meet qualification conditions. Conduct thorough due diligence on all subcontractors to mitigate risks of disqualification.
Provide a comprehensive technical proposal that clearly addresses all aspects of the technical description (Lisa 1). Focus on practical, proven methodologies and demonstrate a deep understanding of the project's complexities, including traffic management.
Submit a robust risk analysis and occupational safety plan (Lisa 3) that goes beyond generic statements. Highlight specific mitigation strategies for identified risks and demonstrate a strong safety culture. This is a key differentiator for AS Tallinna Vesi.
Ensure the tender cost form is accurate, transparent, and competitive. Clearly break down costs and justify work volumes. Highlight any potential cost efficiencies or value-added services.
Incorporate specific, measurable social value commitments related to local employment, training, or environmental sustainability into the bid. This demonstrates a broader commitment beyond contractual obligations.
Develop a detailed traffic management plan that is seamlessly integrated into the overall project schedule and methodology. Consider phased approaches and clear communication channels with the public and authorities.
Clearly articulate how the bid will meet and exceed the green procurement requirements. Provide specific examples of sustainable practices or materials that will be employed.
Opgrader for at se, hvilke virksomheder der sandsynligvis vil afgive tilbud på dette udbud, baseret på historiske indkøbsdata.
Log ind20 krav på tværs af 5 kategorier
Tilmeld dig for at se komplette krav og analyser
13 dokumenter tilgængelige med AI-resuméer
This document specifies the qualification and exclusion criteria for first-tier subcontractors, focusing on criminal convictions and trustworthiness.
This document outlines mandatory compliance conditions for bidders and their subcontractors, covering EU sanctions, power of attorney for joint bids, and grounds for subcontractor exclusion.
This document is a tender cost form, containing a list of work volumes and cost breakdowns that bidders must complete for the water and sewage pipeline reconstruction and stormwater pipeline construction project.
Tender document 'Hindamiskriteeriumid ja hinnatavad näitajad' in .PDF format (2,949 bytes).
This document is an explanatory European Single Procurement Document (ESPD) detailing the contracting authority's qualification conditions and exclusion grounds that bidders must complete electronically.
This document is a subcontractor's confirmation that they do not have any grounds for exclusion from the public procurement procedure as stipulated in Section 95 (1) points 1-5 of the Public Procurement Act.
This technical description outlines the objective, scope, and execution conditions, including traffic management requirements, for the reconstruction of water and sewage pipelines and the construction of stormwater pipelines in Sõle street, Kolde avenue, and Auna street.
This document outlines AS Tallinna Vesi's occupational health, safety, and environmental requirements that contractors must adhere to on repair and construction sites, including submitting a risk analysis and work safety plan before commencing work.
This document is a template for a contractual penalty act, detailing various breaches and their corresponding penalty amounts to be applied to the contractor during the execution of the contract.
Tender document 'Lisad 4, 6 ja 7' in .XLSX format (28,454 bytes).
This document is a third-party (e.g., subcontractor) consent form allowing the tenderer to rely on its economic, financial, technical, and professional capabilities to meet tender qualification requirements, while also confirming responsibility for contract execution.
This document is a draft contract for the reconstruction and construction of water, sewage, and stormwater pipelines in Sõle, Kolde, and Auna streets, outlining the terms, appendices, and general conditions for the awarded contractor.
Tender document 'Ühispakkujate volikiri' in .DOCX format (64,128 bytes).
Tilmeld dig for at se dokumentresuméer og analyser
This tender is well-documented and structured, demonstrating good clarity and completeness. However, a significant contradiction regarding the classification of the estimated value severely impacts its fairness and data consistency.
The tender appears to be legally compliant, featuring reasonable submission deadlines, appropriate CPV codes, and no detected disputes. The use of ESPD and EU funding suggests adherence to relevant regulations.
The project description is clear, and requirements are well-structured and referenced through specific documents. Evaluation criteria are indicated, and performance conditions refer to contract clauses, contributing to good clarity.
All essential information, including basic details, financial data, timeline, and location, is provided. A comprehensive set of 14 documents supports the tender, ensuring high completeness.
While e-procurement is enabled and requirements seem generic, the tender explicitly states 'Value Classified: Yes' despite providing an 'Estimated Value: 5,500,000.00 EUR'. This contradiction creates ambiguity and significantly undermines transparency and fairness.
Electronic submission is supported, and the contract start date is known. Financing information refers to contract clauses. However, the explicit contract duration is not stated in the basic information, which is a minor practical oversight.
Key fields are populated, and dates are logical. However, the direct contradiction between the disclosed estimated value and its classification status ('Value Classified: Yes') represents a significant data inconsistency.
The tender is characterized as 'Green Procurement' and is 'EU Funded', which are positive aspects. However, it explicitly lacks social criteria and innovation focus, limiting its overall sustainability scope.
Tilmeld dig for at se komplette krav og analyser
Intet kreditkort krævet • Opsætning på 2 minutter
Vores udbudseksperter forbereder alt. Det virker – du gennemgår, godkender og indsender.
Hej! Jeg er din AI-assistent for dette udbud. Jeg kan hjælpe dig med at forstå krav, frister, berettigelseskriterier og give strategiske indsigter.
Intet kreditkort krævet