Skip to main content
Vil du afgive tilbud på offentlige udbud? Se vores TaaS-service til forberedelse af udbud
Udbud

Udvikling af design- og omkostningsdokumentation for opgaven: "Udvidelse af distriktsvej 2607S fra km 5+230 til km 5+360, inklusive viadukter nr. 32 og 33 ved km 5+257 og 5+297 i byen Goleszów".

Åben
Frist
4 dage tilbage
April 08, 2026
Kontrakt detaljer
Kategori
Serviceydelser
Reference
2026/BZP 00173112/01
Værdi
Ikke oplyst
Lokation
Śląskie, Polen
Udgivet
Marts 27, 2026
CPV-kode
Projekttidslinje

Udbud offentliggjort

Marts 26, 2026

Frist for spørgsmål

April 01, 2026

Frist for tilbud

April 08, 2026

VinderchancePRO
🔒
Opgrader til Professional
Se din estimerede vinderchance baseret på historiske data.
Opgrader til Professionel →
SektorsindsigtPRO
🔒
Lås op for sektorsindsigt
Se gennemsnitlige vinderpriser, konkurrenceniveauer og markedstrends.
Opgrader til Professionel →
Budget
Ikke oplyst
Varighed
Ikke angivet
Lokation
Śląskie
Type
Serviceydelser
75
Kvalitetsscore/100
God
Markedsbenchmark
Gns. Vindende Pris
€496,142
Gns. Tilbud
0.6
Konkurrence
Lav
SMV Vindere
93%
25,840 udbud analyseret

Original udbudsbeskrivelse

Udvikling af design- og omkostningsdokumentation for opgaven: "Udvidelse af distriktsvej 2607S fra km 5+230 til km 5+360, inklusive viadukter nr. 32 og 33 ved km 5+257 og 5+297 i byen Goleszów".

Kør risikoanalyse

Identificer potentielle risici, uoverensstemmelser og advarselstegn på tværs af alle udbudsdokumenter. Få en detaljeret risikorapport med alvorlighedsgrader og anbefalinger til afhjælpning.

Log ind

Vinderstrategi

AI-drevet analyse af dette udbuds krav, muligheder og udfordringer. Få strategiske indsigter for at maksimere din vinderchance.

70%
Estimeret vinderchanceModerat match

This tender requires comprehensive design and cost documentation for a road and viaduct expansion. A winning strategy will focus on demonstrating technical expertise, efficient project management, and a clear understanding of the permitting process, while leveraging the lack of specified evaluation criteria to emphasize core competencies.

Nøglebudskaber til at vinde

Proven expertise in delivering comprehensive road infrastructure design documentation, ensuring regulatory compliance and timely permit acquisition.

Commitment to quality, reliability, and adherence to all legal and technical standards throughout the project lifecycle.

Efficient project management and proactive engagement to facilitate the smooth realization of the investment.

Nøglemuligheder
The absence of specified evaluation criteria presents an opportunity to define value through a strong emphasis on technical competence and a clear understanding of the full scope of work, including permitting and author's supervision.
The requirement to obtain all necessary permits and decisions (e.g., ZRID/building permit) is a critical path item where a bidder's demonstrated success in similar processes can be a significant differentiator.
The need for author's supervision during implementation allows for showcasing a commitment to the project's success beyond just documentation delivery.
Nøgleudfordringer
The lack of specified evaluation criteria means bidders must infer the Contracting Authority's priorities and ensure their bid addresses all aspects comprehensively, without knowing specific weighting.

Focus on delivering a technically sound, complete, and well-presented proposal that clearly demonstrates capability across all stated requirements. Emphasize the completeness of the documentation and the bidder's ability to manage the entire process from design to permit acquisition and supervision.

The requirement for the bidder to bear all costs associated with obtaining permits and decisions can be a financial risk if not accurately estimated.

Conduct thorough due diligence on the likely costs and timelines for permit acquisition in the specified location (Goleszów, PL225 NUTS). Include a detailed breakdown of these anticipated costs in the financial proposal and contingency planning.

Ideel tilbudsgiverprofil
An engineering consultancy or design firm with proven experience in road infrastructure projects, including the development of detailed design documentation, cost estimations, and successful navigation of permitting and approval processes for public works in Poland. Experience with viaduct design and construction oversight is a significant advantage.
Nøglekrav
Development of complete design and cost documentation, including all agreements, opinions, and permits necessary for the implementation of the investment task.
Preparation of necessary geodetic documentation for project readiness (property divisions and acquisitions).
Obtaining the decision on road investment implementation (or building permit) on behalf of the Contracting Authority.
Provision of author's supervision during the actual implementation of the task.
Compliance with Polish legal regulations, standards, and guidelines for design documentation.
Delivery of documentation in both hard copy (bound, with table of contents) and electronic formats (DWG and PDF).
The design office must be equipped with appropriate hardware and licensed software.
Nøgledifferentiatorer
Demonstrated track record of successfully obtaining road construction permits (e.g., ZRID) in similar Polish administrative contexts.
A highly experienced and qualified project team with specific expertise in road and viaduct design, as well as permitting processes.
A proactive and transparent approach to project management, including clear communication protocols and risk management strategies.
A well-defined methodology for ensuring the quality and accuracy of design documentation and cost estimations.
Muligheder for social værdi
While 'Social Aspects: No' is indicated, a proactive bidder could propose incorporating local employment opportunities for specific roles (e.g., junior engineers, administrative support) during the design and permitting phases, or supporting local educational initiatives related to engineering and construction.
Fokusområder for tilbud
Technical Capability (Implicit)

Provide detailed resumes of key personnel, highlight relevant past projects with similar scope (road expansion, viaducts), and present a clear, structured approach to developing the design and cost documentation, including quality assurance processes.

Permitting and Approvals Process Management (Implicit)

Detail the bidder's experience in navigating Polish administrative procedures for infrastructure projects, including specific examples of successful permit acquisitions. Outline a clear timeline and methodology for obtaining the required ZRID or building permit.

Completeness of Documentation (Implicit)

Ensure the proposal explicitly addresses every component of the required documentation (design, cost, permits, opinions, geodetic, author's supervision) and demonstrates a thorough understanding of the interdependencies between them.

Anbefalinger7
Thoroughly Address All Documentation Requirements
KritiskHøj indsats

Ensure the bid proposal meticulously covers all aspects of the 'complete design and cost documentation', including agreements, opinions, permits, geodetic documentation, and author's supervision, as detailed in section 3.1 of the SWZ.

Ensures compliance with the core objective of the tender and avoids disqualification.
Leverage Unspecified Evaluation Criteria
KritiskMedium indsats

Since evaluation criteria are not specified, assume the Contracting Authority will prioritize technical competence, completeness of the offer, and the ability to deliver the project end-to-end (design to permit). Structure the bid to highlight these strengths prominently.

Maximizes perceived value and strengthens the bid's overall appeal.
Showcase Permitting Expertise
HøjMedium indsats

Emphasize the bidder's proven experience and successful track record in obtaining road construction permits (e.g., ZRID) and other necessary approvals in Poland. Detail the methodology and team responsible for this critical aspect.

Addresses a key risk and demonstrates a critical capability for project success.
Develop Detailed Project Execution Plan
HøjMedium indsats

Provide a clear, phased project plan outlining the timeline for design, cost estimation, permit acquisition, and author's supervision. Include key milestones and risk mitigation strategies.

Demonstrates organizational capability and foresight.
Accurate Cost Estimation for Permitting
HøjMedium indsats

Conduct a detailed analysis of potential costs and timelines associated with obtaining all required permits and decisions. Ensure these are accurately reflected in the financial proposal, including any necessary contingencies.

Prevents financial overruns and demonstrates fiscal responsibility.
Adhere to Documentation Formatting Standards
HøjLav indsats

Strictly follow the specified requirements for graphic presentation (clarity, compliance with norms, minimal sheets), binding (hard cover, table of contents), and electronic delivery (DWG and PDF formats) as per section 3.2.4 and 3.2.5 of the SWZ.

Ensures the bid meets formal submission requirements and is well-received.
Propose Local Employment/Support
LavLav indsats

Despite 'Social Aspects: No', consider a brief mention of potential local employment opportunities during the design/permitting phase or support for local educational initiatives to subtly enhance the bid's appeal.

May offer a minor competitive edge if other bidders do not consider this.
Konkurrencemæssig positionering
Position the bid as the most reliable and technically proficient partner capable of delivering a complete, compliant, and permit-ready design package, thereby minimizing risk for the Contracting Authority.
Highlight the bidder's understanding of the specific local context (Goleszów, PL225) and any relevant past experience in the region.
Emphasize the integrated approach, covering all stages from initial design to author's supervision, showcasing a commitment to the project's successful realization.

Konkurrenter

Opgrader for at se, hvilke virksomheder der sandsynligvis vil afgive tilbud på dette udbud, baseret på historiske indkøbsdata.

Log ind

Krav og kvalifikationer

5 krav på tværs af 5 kategorier

Indsendelse (1)
Obligatorisk (1)
Overholdelse (1)
Teknisk (1)
Finansiel (1)
SUBMISSION REQUIREMENTS1
--Development of complete design and cost documentation, including all agreements, opinions, and permits necessary for the implementation of the investment task: "Expansion of DP 2607S from km 5+230 to km 5+360 along with viaducts no. 32 and 33 at km 5+257 and 5+297 in the town of Goleszów".
MANDATORY EXCLUSION GROUNDS1
--No information in the text.
ELIGIBILITY REQUIREMENTS1
--No information in the text.
TECHNICAL CAPABILITY REQUIREMENTS1
--No information in the text.
FINANCIAL REQUIREMENTS1
--No information in the text.

Forhåndsvisning af Krav

Tilmeld dig for at se komplette krav og analyser

Dokumenter

8 dokumenter tilgængelige med AI-resuméer

Notice PDFPDF
08de8b29-2e35-5053-5fad-950001e7112f.pdf

This document is a public procurement notice for the development of design and cost documentation for the expansion of road DP 2607S in Goleszów, Poland.

Vis
zalacznik_nr_1_oswiadczenie_o_wykluczeniu_oraz_spelnianiu_warunkow_udzialu.docxDOC
zalacznik_nr_1_oswiadczenie_o_wykluczeniu_ora...

This document is a bidder's declaration confirming they are not subject to exclusion and meet the participation conditions for the tender concerning the design and cost documentation for the expansion of DP 2607S in Goleszów.

Vis
zalacznik_nr_2_oswiadczenie_ podmiotu udostępniającego.docxDOC
zalacznik_nr_2_oswiadczenie_ podmiotu udostęp...

This document is a declaration by a resource provider stating they are not subject to exclusion and meet the participation requirements for the tender concerning the design and cost documentation for road and bridge expansion in Goleszów.

Vis
zalacznik_nr_3_zobowiazanie_ podmiotu udostępniającego.docxDOC
zalacznik_nr_3_zobowiazanie_ podmiotu udostęp...

This document is a commitment form from a third-party resource provider to make necessary resources available to the contractor for the project "Expansion of DP 2607S from km 5+230 to km 5+360 including viaducts no. 32 and 33".

Vis
zalacznik_nr_4_oswiadczenie_art.117_ust .4.docxDOC
zalacznik_nr_4_oswiadczenie_art.117_ust .4.do...

This document is a declaration for joint bidders, outlining the specific deliveries, services, or construction works each contractor will undertake for the project to develop design and cost documentation for road expansion in Goleszów.

Vis
zalacznik_nr_5_projekt_umowy.pdfPDF
zalacznik_nr_5_projekt_umowy.pdf

This document contains the draft contract for the development of design and cost documentation for the expansion of road DP 2607S in Goleszów.

Vis
zalacznik_nr_6_OPZ_Instrukcja_Ekspertyzy.7zZIP
zalacznik_nr_6_OPZ_Instrukcja_Ekspertyzy.7z

This document contains the description of the subject of the order for the development of design and cost documentation for the expansion of road DP 2607S and related viaducts, along with instructions for conducting expert assessments of bridge structures.

Vis
zalacznik_nr_7_Tabela_prac_projektowych.xlsxXLS
zalacznik_nr_7_Tabela_prac_projektowych.xlsx

This document contains a table detailing project works, including item numbers, descriptions, units, quantities, and net unit prices in PLN, for the design documentation of the road expansion in Goleszów.

Vis

Forhåndsvisning af Dokumenter

Tilmeld dig for at se dokumentresuméer og analyser

75
God

Udbudskvalitetsscore

This tender for design documentation is generally well-structured, with clear documentation and a good set of required forms. However, it lacks specific evaluation criteria and details on financing, impacting its overall practicality and completeness.

Scoreopdeling

Overholdelse af lovgivning75/100

The tender adheres to general legal compliance by providing a clear CPV code, a reference number, and a defined procedure type. The submission deadline, while potentially short, is present. There is no indication of disputes. The presence of required forms suggests a structured legal framework for participation.

Klarhed80/100

The description of the required service is clear, detailing the specific road expansion project. The attached documents, including technical specifications and form templates, provide a good level of detail for bidders to understand the scope and requirements.

Fuldstændighed70/100

Most basic information is present, including the title, organization, and a clear description of the task. However, the estimated value is not disclosed, and crucial details like contract duration and financing information are missing, which affects the completeness of the tender package.

Estimated value not disclosed
Missing contract duration
Retfærdighed85/100

The tender is conducted via e-procurement, promoting transparency. The requirements are generally objective, focusing on the development of documentation. There are no immediately apparent requirements tailored to specific companies, suggesting a fair process. Full document access is implied by the listed attachments.

Praktisk anvendelighed65/100

The tender is marked as e-procurement, which is a positive aspect. However, the absence of a contract start date and the lack of disclosed financing information reduce its practicality for bidders needing to plan resources and financial commitments effectively.

Missing contract start date
No financing information
Datakonsistens90/100

Key fields such as title, reference, organization, and CPV code are populated. The dates provided are logical, and there are no indications of suspension or disputes. The status 'active' is consistent with the submission deadline.

Bæredygtighed50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation focus. While not mandatory for all tenders, the absence of these elements limits its score in this category.

No green procurement mentioned
No social aspects mentioned

Styrker

Clear project description and scope
Comprehensive set of required documentation (forms, technical specs)
E-procurement platform utilized
Proper CPV code provided

Bekymringer

Estimated value not disclosed
Missing evaluation criteria
Lack of contract start date and duration
No sustainability considerations

Anbefalinger

1. Disclose the estimated value of the contract.
2. Specify the evaluation criteria for bids.
3. Include details on the contract start date and expected duration.

Forhåndsvisning af AI-scoring

Tilmeld dig for at se komplette krav og analyser

Komplet analyse af kvalitetsscore
Detaljeret opdeling af underscores
Indsigter i styrker og bekymringer
Strategiske anbefalinger

Intet kreditkort krævet • Opsætning på 2 minutter

Ny service

Vil du have os til at håndtere dette udbud?

Vores udbudseksperter forbereder alt. Det virker – du gennemgår, godkender og indsender.

~1hDin tid kun
80%+80%+
$0Forudbetaling
Se fuld sammenligning
Uden TaaSMed TaaS
40-80 timer
Forberedelsestid
~1 time
Din tid kun
15-25%
Gennemsnitlig vinderate
80%+
Vinderate
Risiko for fejl
Manuel gennemgang
Ekspert QA
Overholdelsestjek
Du gør alt
Håndter alt
Vi gør alt
End-to-end service
Lad os vinde dette udbud
Betal kun, når du vinder · 400+ virksomheder stoler på os
Eller gør det selv

Tilføj til pipeline