Brauchen Sie Hilfe von Ausschreibungsexperten? Sehen Sie unseren Service zur Angebotserstellung
Ausschreibungen

QEII Gedenkprogramm – Hauptauftragnehmer

Offen
Frist
96 Tage verbleibend
29. Januar 2027
Vertragsdetails
Kategorie
Sonstiges
Referenz
099212-2026
Wert
£30,000,000
Standort
London, Vereinigtes Königreich
Veröffentlicht
17. Oktober 2026
CPV-Code
Zeitplan des Projekts

Ausschreibung veröffentlicht

20. Oktober 2026

Frist für Fragen

22. Januar 2027

Angebotsfrist

29. Januar 2027

Vertragsbeginn

30. August 2027

Budget
£30,000,000
Dauer
29 Monate
Standort
London
Typ
Sonstiges

Ursprüngliche Ausschreibungsbeschreibung

Contracting authority: Department for Digital, Culture, Media and Sport (DCMS) Procurement title: QEII Memorial Programme – Principal / Main Contractor Procurement identifier: 105267 Notice type: UK2 – Preliminary Market Engagement Notice Estimated contract value (excluding VAT): £25,000,000 - £27,500,000 Contract location: St James's Park, London, United Kingdom CPV codes: 45200000 - Works for complete or part construction and civil engineering work 45111000, 45111100, 45215000, 45112711, 45233222, 45111300, 45212350, 45212314, 45262510, 45112000, 45111213, 45112100-6, 45112700, 77310000, 77300000, 03451000, 03451300 Expected tender notice publication: January 2027 Market engagement closing date: 31 December 2026 Procurement contact / portal: DCMS procurement portal Description of the requirement The Department for Digital, Culture, Media and Sport (DCMS) is undertaking preliminary market engagement in connection with the proposed procurement of a Principal/Main Contractor to supply works in respect of the Queen Elizabeth II Memorial programme. The proposed appointment will involve the management, coordination and delivery of a complex, multidisciplinary programme of construction, enabling works, public realm improvements and specialist installations within St James's Park, London. The anticipated scope includes: Enabling works, including site establishment, surveys, site clearance, protection of existing assets, temporary works and associated utilities and infrastructure; Demolition and removal of the existing bridge, including associated temporary works, protection of adjacent assets, disposal of materials and coordination with the wider construction programme; Construction of the foundations and associated substructures for the new bridge, including groundworks, excavation, reinforced concrete works, drainage and associated civil engineering interfaces; Installation of the new bridge, including site preparation, lifting and installation operations, temporary works and coordination with the separately appointed Bridge Contractor responsible for fabrication of the bridge structure, glass balustrades and incorporated paving, with the detailed allocation of installation responsibilities to be confirmed through the procurement and contractual arrangements; Demolition and reconstruction of existing public toilet facilities, including associated building services and integration with the surrounding public realm; Hard landscaping, including paving, pathways, groundworks, levels, drainage, external finishes and associated civil engineering works; Soft landscaping, including sourcing and procurement of plants, trees and other planting materials, ground preparation, planting and landscape establishment; Heritage works, including the careful dismantling, movement, relocation and reinstatement of Grade II listed structures, subject to relevant statutory consents and heritage protection requirements; Memorial installations, including coordination and liaison with the appointed artist and relevant specialists to facilitate the installation of memorial statues, sculptures and associated elements; Specialist contractor interfaces, including coordination with the separately procured Bridge Contractor responsible for the stainless steel bridge structure, glass balustrades, incorporated paving and associated works; Construction management and integration, including logistics, site access, sequencing, temporary works, health and safety, quality assurance, programme coordination and stakeholder management; and Completion and handover, including testing, commissioning where applicable, reinstatement, defects management and handover to DCMS and relevant operational stakeholders. The works will take place within a sensitive historic park environment, requiring careful management of public access, heritage assets, existing landscape features, construction logistics and stakeholder interfaces. Indicative Timescales The current indicative programme anticipates award of the Stage 1 Pre-Construction Services Agreement (PCSA) in August 2027 and the Stage 2 main construction works contract in May 2028. These dates are estimates and remain subject to procurement outcomes, programme development and the necessary DCMS approvals. The anticipated duration and completion date of the Stage 2 construction works have not yet been determined. These will be developed during Stage 1, or as part of the formation of the Stage 2 contract, taking account of the appointed contractor's proposed construction methodology, interfaces with the specialist Bridge Contractor, wider programme dependencies and seasonal landscaping requirements. Proposed Procurement and Delivery Approach DCMS is considering a two-stage appointment for the Principal/Main Contractor, comprising an initial Pre-Construction Services Agreement (PCSA) for Early Contractor Involvement, construction planning, buildability review, supply-chain engagement and development of the construction price, followed by a separate commitment to the main construction works. The proposed scope includes enabling works, demolition and reconstruction of public toilet facilities, hard and soft landscaping, relocation and reinstatement of Grade II listed structures, coordination of memorial installations with the appointed artist, and integration of the separately appointed specialist Bridge Contractor. DCMS is considering a competitive flexible procedure under the Procurement Act 2023, incorporating an initial assessment of supplier capability and a subsequent tender stage. The proposed arrangements include coordination with the Bridge Contractor during pre-construction and its intended subsequent novation to the Principal/Main Contractor, subject to agreed contractual arrangements and approvals. The proposed approach remains subject to market engagement and DCMS governance approvals.

Risikoanalyse

Die Risikoanalyse ist für Ausschreibungen in diesem Land noch nicht verfügbar. Aktuell unterstützt: Estland, Lettland, Litauen, Polen, Frankreich, Großbritannien, Dänemark, Niederlande, Norwegen und Finnland.

Erfolgsstrategie

Erhalten Sie eine KI-gestützte Gewinnstrategie, die auf diese Ausschreibung zugeschnitten ist. Beinhaltet Gewinnwahrscheinlichkeits-Score, wichtige Chancen und Herausforderungen, empfohlene Schwerpunkte für Angebote, Einblicke in die Wettbewerbspositionierung und umsetzbare Empfehlungen zur Maximierung Ihrer Chancen.

Anmelden

Wettbewerber

Upgrade, um zu sehen, welche Unternehmen wahrscheinlich auf diese Ausschreibung bieten werden, basierend auf historischen Beschaffungsdaten.

Anmelden

Anforderungen & Qualifikationen

KI extrahiert und organisiert alle Anforderungen aus den Ausschreibungsunterlagen – obligatorische Qualifikationen, technische Spezifikationen, finanzielle Bedingungen und Einreichungsregeln – klar kategorisiert, damit Sie genau wissen, was für ein Angebot erforderlich ist.

Anmelden

Grundlegende Anforderungen

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumente

3 Dokumente mit KI-Zusammenfassungen verfügbar

OCDS RecordDOC
099212-2026_ocds_record.json

Keine Zusammenfassung für dieses Dokument verfügbar.

OCDS Release PackageDOC
099212-2026_ocds_release.json

Keine Zusammenfassung für dieses Dokument verfügbar.

Official PDF VersionPDF
099212-2026_official.pdf

Keine Zusammenfassung für dieses Dokument verfügbar.

Vorschau der Dokumente

Registrieren Sie sich, um Dokumentenzusammenfassungen und Analysen anzuzeigen

Qualitätsbewertung

Umfassende Qualitätsanalyse dieser Ausschreibung, die rechtliche Konformität, Klarheit, Vollständigkeit, Fairness, Praktikabilität, Datenkonsistenz und Nachhaltigkeit auf einer Skala von 0-100 mit detaillierter Aufschlüsselung und Empfehlungen bewertet.

Anmelden