Behöver du hjälp av en upphandlingsexpert? Se vår tjänst för anbudsförberedelse
Upphandlingar

Space Weather R2O Maintenance - BGS (UKRI)

Stängd
Sista anbudsdag
Tidsfrist ej angiven
Avtalsdetaljer
Kategori
Negotiated Procedure
Referens
062376-2026
Värde
Ej angivet
Plats
Derbyshire and Nottinghamshire, Storbritannien
Publicerad
27 september 2026
Organisation
CPV-kod
Tidsplan för projektet

Upphandling publicerad

2 juli 2026

KöparinsikterPRO
🔒
Lås upp köparinsikter
Se utgiftsmönster, föredragna procedurer och mer.
Uppgradera till Professional →
Budget
Ej angivet
Varaktighet
Ej angivet
Plats
Derbyshire and Nottinghamshire
Typ
Negotiated Procedure

Ursprunglig beskrivning av upphandling

'Space Weather Implementation, Measurement, Modelling and Risk' (SWIMMR), was a £19.9m UKRI SPF funded programme led by STFC from 2019, and which largely concluded in 2023. Several of the projects were targeted at space weather scientific modelling gaps, with the aim of bringing them into operation for forecast capabilities in the Met Office Space Weather Operations Centre (MOSWOC). The project 'S3' stood up systems and enabled collaboration between academic partners and the Met Office space weather programme, bringing a platform 'sandbox environment' and portal for monitoring outputs into use at the Met Office (MO) where our scientists worked with several academic partners to bring their models into use. Whilst the original SWIMMR programme made this collaboration possible, there is much work remaining to bring the models into working operational use by the target date of September 2026, the Research to Operations to Research (R2O2R) project is the next stage in this Programme. The Space Weather CSA with the Department for Science and Technology (DSIT) sets out a required output for the Met Office to Support the validation, integration and exploitation of new capabilities and data delivered through the SPF SWIMMR Programme. Met Office Space Weather (MOSW) has agreed with funding partner DSIT to deliver several targets for the next phase of work: Evidence of user need and user requirement to shape model use and output (MOSWOC being the primary user, with several end-users being the recipients of forecasting products). Technical and scientific requirements within MOSW for fully onboarding, working with and supporting the models and/or their outputs in operational settings. (Whilst the 'S3' platform and portal were helpful for the early stages of model collaboration, they are not able to support long term model and output development and operation). In terms of the projects to achieve modelling capability, we have agreed a number of these and their priority levels with the academic institutions who own the models. The partner, British Geological Survey ("BGS"), led the 'SAGE' (ground effects) project within the SWIMMR Programme. Through this work, BGS developed the SPIDER model - an integrated nowcast and forecasting capability for modelling the effects of Geomagnetically Induced Currents (GIC) across the Great Britain high-voltage power network, pipelines and railways in near real-time. Under the R2O Maintenance contract, BGS will provide ongoing support, maintenance and incremental improvement of the SAGE system and its SPIDER model component, ensuring it continues to operate effectively within the Met Office operational environment. This includes sustaining model performance, addressing defects, implementing updates where required, and supporting the interpretation and application of model outputs within the Space Weather service.

Riskanalys

Riskanalys är ännu inte tillgänglig för detta lands upphandlingar. För närvarande stöds: Estland, Lettland, Litauen, Polen, Frankrike, Storbritannien, Danmark, Nederländerna, Norge och Finland.

Vinnande strategi

Få en AI-driven vinnande strategi anpassad för denna upphandling. Inkluderar poäng för vinstsannolikhet, viktiga möjligheter och utmaningar, rekommenderade fokusområden för anbudet, insikter om konkurrenspositionering och handlingsbara rekommendationer för att maximera dina chanser.

Logga in

Konkurrenter

Uppgradera för att se vilka företag som sannolikt kommer att lämna anbud på denna upphandling, baserat på historisk upphandlingsdata.

Logga in

Krav och kvalifikationer

AI extraherar och organiserar alla krav från upphandlingsdokumenten — obligatoriska kvalifikationer, tekniska specifikationer, finansiella villkor och inlämningsregler — tydligt kategoriserade så att du vet exakt vad som krävs för att lämna anbud.

Logga in

Grundläggande krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokument

3 dokument tillgängliga med AI-sammanfattningar

OCDS RecordDOC
062376-2026_ocds_record.json

Ingen sammanfattning tillgänglig för detta dokument.

OCDS Release PackageDOC
062376-2026_ocds_release.json

Ingen sammanfattning tillgänglig för detta dokument.

Official PDF VersionPDF
062376-2026_official.pdf

Ingen sammanfattning tillgänglig för detta dokument.

Förhandsgranskning av dokument

Registrera dig för att se dokumentöversikter och analyser

Kvalitetspoäng

Omfattande kvalitetsanalys av denna upphandling som bedömer juridisk efterlevnad, tydlighet, fullständighet, rättvisa, praktisk genomförbarhet, datakonsistens och hållbarhet på en skala från 0-100 med detaljerad uppdelning och rekommendationer.

Logga in