Behöver du hjälp av en upphandlingsexpert? Se vår tjänst för anbudsförberedelse
Upphandlingar

Renovering av Skerry of Ness och Hoxa Head fyr

Öppen
Sista anbudsdag
2 dagar kvar
28 september 2026
Avtalsdetaljer
Kategori
Open Procedure
Referens
081399-2026
Värde
£75,000
Plats
Highlands and Islands, Storbritannien
Publicerad
18 september 2026
CPV-kod
Tidsplan för projektet

Upphandling publicerad

26 augusti 2026

Sista dag för frågor

21 september 2026

Sista anbudsdag

28 september 2026

Avtalets startdatum

9 november 2026

Budget
£75,000
Varaktighet
3 månader
Plats
Highlands and Islands
Typ
Open Procedure

Ursprunglig beskrivning av upphandling

Skerry of Ness is a tidal station. Hoxa Head is located on land and can be accessed at all times. To utilise the contractor’s time, its envisaged that Skerry of Ness will take priority to work around tidal times as required, and Hoxa Head works can be carried out around Skerry of Ness activities. Hoxa Head: Location: Hoxa Head is located on the Hoxa peninsula on the North East coast of South Ronaldsay, Orkney. The site is located on the longitude and latitude of 58°49.315 N, 003°02.085 W. The site is 400m away from a road end. There are field tracks from the road end to close to the site. Description of station: 7m high Aluminium “splat” structure, fixed to concrete base. White GRP daymark panels are fixed to the elevations of structure. The optic is powered by batteries, charged by the 6No panel solar array. The extent of the station is determined by a post and wire boundary fence designed to keep livestock out. There are no welfare facilities at this station. Description of works: The works are of a purely civil nature. The works will include: Wash down and remove lichen/marine growth from surfaces of all structures (GRP, Concrete and Metal work). Repairs to GRP daymark panels and metalworks as required. Existing fence to be re-strung. No electrical works shall be involved and the optic shall remain operational throughout. Skerry of Ness: Location: Skerry of Ness is located south of the town of Stromness on the mainland of Orkney. The site is located on the longitude and latitude of 58°56.960 N 003°17.830 W. Together with Hoy Loy Lighthouse the station denotes the entry to the port of Stromness. The station is located in tidal waters 200m from the mainland. The shoreline can be access via Guardhouse Park Road leading from the town of Stromness. The station can be accessed at low tide by foot. At high tides, boat access is required. Description of station: 10m high post-tensioned white concrete column, topped with concrete platform. The main concrete column is fixed to a square concrete foundation fixed to the sea bed. The platform is accessed via a ladder. There are fenders to each side of the ladder to allow a boat to access the ladder at high tides. The platform is guarded by a handrail and safety gate to the top of the ladder. The optic cubicle is located on the edge of the platform, with solar panels fixed to the seaward facing side of the cubicle. The optic is powered by batteries stored within the cubicle, which are trickle charged by the solar panels. There are no welfare facilities at this station. Description of works: The works are of a purely civil nature. The concrete structure is to be power washed to remove lichen/marine growth from surfaces. Any concrete repairs will be carried out as necessary following power washing. Any corroded metalwork or fixings shall be replaced, this may involve replacement of ladders, handrails, and fenders. The structure shall be redecorated. No electrical works shall be involved and the optic shall remain operational throughout. Minimum Certification Requirements Contractor will need rope access certificates (IRATA Certification) [Important Note to Bidders: There is a mandatory site visit in Orkney on 10 September - further details will be given via the message facility. Those parties who have expressed interest in a future Orkney refurbishment at Hoy Sound (High) can visit this site on 11 September. To avoid the need for two trips. There will be a separate site visit planned for those parties who have only expressed an interest in Hoy Sound in due course. Those attending site visits will need to bring suitable PPE and clothing, further details to follow via the messaging facility.] Please note all details and dates included are subject to change.

Riskanalys

Riskanalys är ännu inte tillgänglig för detta lands upphandlingar. För närvarande stöds: Estland, Lettland, Litauen, Polen, Frankrike, Storbritannien, Danmark, Nederländerna, Norge och Finland.

Vinnande strategi

Få en AI-driven vinnande strategi anpassad för denna upphandling. Inkluderar poäng för vinstsannolikhet, viktiga möjligheter och utmaningar, rekommenderade fokusområden för anbudet, insikter om konkurrenspositionering och handlingsbara rekommendationer för att maximera dina chanser.

Logga in

Konkurrenter

Uppgradera för att se vilka företag som sannolikt kommer att lämna anbud på denna upphandling, baserat på historisk upphandlingsdata.

Logga in

Krav och kvalifikationer

AI extraherar och organiserar alla krav från upphandlingsdokumenten — obligatoriska kvalifikationer, tekniska specifikationer, finansiella villkor och inlämningsregler — tydligt kategoriserade så att du vet exakt vad som krävs för att lämna anbud.

Logga in

Grundläggande krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokument

3 dokument tillgängliga med AI-sammanfattningar

OCDS RecordDOC
081399-2026_ocds_record.json

Ingen sammanfattning tillgänglig för detta dokument.

OCDS Release PackageDOC
081399-2026_ocds_release.json

Ingen sammanfattning tillgänglig för detta dokument.

Official PDF VersionPDF
081399-2026_official.pdf

Ingen sammanfattning tillgänglig för detta dokument.

Förhandsgranskning av dokument

Registrera dig för att se dokumentöversikter och analyser

Kvalitetspoäng

Omfattande kvalitetsanalys av denna upphandling som bedömer juridisk efterlevnad, tydlighet, fullständighet, rättvisa, praktisk genomförbarhet, datakonsistens och hållbarhet på en skala från 0-100 med detaljerad uppdelning och rekommendationer.

Logga in