Behöver du hjälp av en upphandlingsexpert? Se vår tjänst för anbudsförberedelse
Upphandlingar

Offentliga gångvägsarbeten – Harris Park Utbyggnad

Öppen
Sista anbudsdag
22 dagar kvar
16 oktober 2026
Avtalsdetaljer
Kategori
Open Procedure
Referens
084883-2026
Värde
£44,000
Plats
North East England, Storbritannien
Publicerad
16 september 2026
CPV-kod
Tidsplan för projektet

Upphandling publicerad

8 september 2026

Sista dag för frågor

9 oktober 2026

Sista anbudsdag

16 oktober 2026

Avtalets startdatum

1 februari 2027

Budget
£44,000
Varaktighet
1 månader
Plats
North East England
Typ
Open Procedure

Ursprunglig beskrivning av upphandling

1.1 The Authority Cockermouth Town Council is inviting competitive tenders for minor civil works to improve a public footpath section. Engineering drawings and technical specifications were prepared on behalf of the Town Council by Cumberland Council. 1.2 Purpose of Work The objective is to establish an accessible, surfaced route from Double Mills footbridge to the woodland section behind Dale View, Cockermouth. Currently, this missing link prevents access for pushchairs, wheelchairs, and less-mobile pedestrians. 1.3 Key Project Details • Design & Standards: Formulated via engineering drawings provided by Cumberland Council. • Target Start Date: February / March 2027 (Spring 2027) or before. • Contract Duration: Estimated 2 consecutive weeks. 2.1 Scope of Works The contractor will provide all plant, labour, and materials to execute the following sequence: 1. Site Establishment: Set up a secure temporary compound near the park entrance at Dale View. 2. Safety Measures: Formally close Footpath No. 223015 to the public for the 2-week duration of works. (Cumberland Council has agreed to meet the costs of this) 3. Excavation: Dig out a ground tray 50mm deep along the path alignment. Retain topsoil and arisings on-site for reuse. 4. Membrane: Supply and lay a heavy-duty geotextile separation membrane along the length of construction. 5. Sub-Base: Supply, lay, and compact a 150mm depth of Type 1 granular sub-base. 6. Surface Course: Supply, lay, and compact a 40mm depth of 0-6mm crushed aggregate to form a smooth, accessible top finish. 7. Alignment Note: The path alignment must run to the right-hand side of the park bench and to the left-hand side of the trees. 8. Tie-ins: Saw cut the existing macadam path at chainage 0m near the Double Mills footbridge to ensure a flush finish. The end chainage must meet completely flush with the existing timber bridge deck. 9. Landscaping: Smooth out and reinstate path edges using the saved arisings and topsoil, then seed with an 80/20 wildflower mix. 2.2 Critical Site Constraints • Narrow Access: Access to the park area is via a restrictive, narrow road at Dale View. Large commercial HGVs or oversized plant will not physically fit. Bidders must check this access profile prior to pricing. • Watercourse Proximity: The works run directly alongside the River Cocker. • Environmental Protection: All materials and plant machinery must remain at least 5 metres away from the watercourse channel on ground with no immediate flooding risk. Absolutely no refuelling, servicing, or greasing is allowed on site. Equipment must be checked for leaks before entering the site. • Flood Risk Management: Works must be carried out in generally dry conditions. The contractor is required to monitor local water levels and Environment Agency flood alerts prior to and during construction to reduce risk to the workforce.

Riskanalys

Riskanalys är ännu inte tillgänglig för detta lands upphandlingar. För närvarande stöds: Estland, Lettland, Litauen, Polen, Frankrike, Storbritannien, Danmark, Nederländerna, Norge och Finland.

Vinnande strategi

Få en AI-driven vinnande strategi anpassad för denna upphandling. Inkluderar poäng för vinstsannolikhet, viktiga möjligheter och utmaningar, rekommenderade fokusområden för anbudet, insikter om konkurrenspositionering och handlingsbara rekommendationer för att maximera dina chanser.

Logga in

Konkurrenter

Uppgradera för att se vilka företag som sannolikt kommer att lämna anbud på denna upphandling, baserat på historisk upphandlingsdata.

Logga in

Krav och kvalifikationer

AI extraherar och organiserar alla krav från upphandlingsdokumenten — obligatoriska kvalifikationer, tekniska specifikationer, finansiella villkor och inlämningsregler — tydligt kategoriserade så att du vet exakt vad som krävs för att lämna anbud.

Logga in

Grundläggande krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokument

3 dokument tillgängliga med AI-sammanfattningar

OCDS RecordDOC
084883-2026_ocds_record.json

Ingen sammanfattning tillgänglig för detta dokument.

OCDS Release PackageDOC
084883-2026_ocds_release.json

Ingen sammanfattning tillgänglig för detta dokument.

Official PDF VersionPDF
084883-2026_official.pdf

Ingen sammanfattning tillgänglig för detta dokument.

Förhandsgranskning av dokument

Registrera dig för att se dokumentöversikter och analyser

Kvalitetspoäng

Omfattande kvalitetsanalys av denna upphandling som bedömer juridisk efterlevnad, tydlighet, fullständighet, rättvisa, praktisk genomförbarhet, datakonsistens och hållbarhet på en skala från 0-100 med detaljerad uppdelning och rekommendationer.

Logga in