Design and execution of renovation of bridge structures: Lot 1 – bridge over the Szufnarówka river in Szufnarowa in the course of DW986 Tuszyma–Wiśniowa, Lot 2 – bridge over the Sowina stream in Lubla in the course of DW988 Babica–Warzyce

Stängd

Sista anbudsdag har passerat

Sista anbudsdag för denna upphandling har passerat och inga fler ansökningar accepteras. Informationen nedan sparas för referensändamål.

Bläddra bland aktiva upphandlingar
Sista anbudsdag
Utgånget
14 april 2026
Avtalsdetaljer
Kategori
Byggnation
Referens
2026/BZP 00176094/01
Värde
Ej angivet
Plats
Podkarpackie, Polen
Publicerad
26 augusti 2026
CPV-kod
Tidsplan för projektet

Upphandling publicerad

30 mars 2026

Sista dag för frågor

7 april 2026

Sista anbudsdag

14 april 2026

VinstsannolikhetPRO
🔒
Uppgradera till Professional
Se din uppskattade vinstsannolikhet baserat på historisk data.
Uppgradera till Professional →
KöparinsikterPRO
🔒
Lås upp köparinsikter
Se utgiftsmönster, föredragna procedurer och mer.
Uppgradera till Professional →
SektorinsikterPRO
🔒
Lås upp sektorinsikter
Se genomsnittliga vinnande priser, konkurrensnivåer och marknadstrender.
Uppgradera till Professional →
Budget
Ej angivet
Varaktighet
3 månader
Plats
Podkarpackie
Typ
Byggnation
75
Kvalitetspoäng/100
Bra
Marknadsjämförelse
Genomsnittligt vinnande pris
€12,641,706
Genomsnittligt antal anbud
0.1
Konkurrens
Låg
Vinnande små och medelstora företag
86%
133,693 analyserade upphandlingar

Ursprunglig beskrivning av upphandling

Design and execution of renovation of bridge structures: Lot 1 – bridge over the Szufnarówka river in Szufnarowa in the course of DW986 Tuszyma–Wiśniowa, Lot 2 – bridge over the Sowina stream in Lubla in the course of DW988 Babica–Warzyce

Kör riskanalys

Identifiera potentiella risker, inkonsekvenser och varningsflaggor i alla upphandlingsdokument. Få en detaljerad riskrapport med allvarlighetsgrader och rekommendationer för åtgärder.

Logga in

Vinnande strategi

AI-driven analys av denna upphandlings krav, möjligheter och utmaningar. Få strategiska insikter för att maximera din vinstsannolikhet.

65%
Uppskattad vinstsannolikhetMåttlig matchning

This tender requires both the design and execution of bridge renovations for two distinct structures. A winning strategy will focus on demonstrating robust technical capability, efficient project management for a short 3-month duration, and a clear understanding of the functional-utility program. Given the lack of specified evaluation criteria, a proactive approach to highlighting value and expertise is crucial.

Viktiga vinnande budskap

Integrated Design & Execution Excellence: Seamlessly delivering both the design and construction phases for efficient, high-quality bridge renovations.

Proven Bridge Renovation Expertise: Demonstrating a strong track record in successfully completing similar bridge repair projects on time and to specification.

Agile Project Management for Short Durations: Highlighting the capability to manage and deliver complex renovations within the tight 3-month timeframe.

Viktiga möjligheter
Potential for early engagement on design optimization.
Leveraging existing regional relationships.
Demonstrating cost-efficiency through optimized design and execution.
Viktiga utmaningar
Unspecified evaluation criteria.

Develop a bid that comprehensively addresses all stated requirements with a focus on quality, technical capability, and efficiency. Proactively highlight strengths in areas likely to be implicitly valued, such as project management, safety, and technical innovation (even if not explicitly requested).

Short 3-month duration for design and execution.

Develop a detailed, realistic, and resource-loaded project schedule that clearly demonstrates the feasibility of completing both design and construction within the timeframe. Highlight robust project management methodologies and experienced site teams.

Potential for high competition due to the nature of infrastructure projects.

Focus on clear differentiators, such as specialized expertise, innovative (even if minor) construction techniques, or a superior approach to risk management and quality assurance.

Idealisk anbudsprofil
A mid-sized to large construction company with proven experience in bridge design and renovation projects, particularly those involving civil engineering and road infrastructure. The ideal bidder will possess strong in-house design capabilities, a skilled workforce experienced in bridge repairs, and a track record of delivering projects within tight timelines and to high-quality standards. Familiarity with Polish regional road authorities (like Podkarpacki Zarząd Dróg Wojewódzkich) and their typical project requirements would be advantageous.
Viktiga krav
Development of technical documentation including the executive project.
Execution of works related to the renovation of 2 bridge structures.
Compliance with the functional-utility program.
Viktiga utmärkande faktorer
A highly detailed and optimized executive project plan that demonstrates a deep understanding of the specific bridge structures and potential challenges, leading to a more efficient and cost-effective execution.
A proven methodology for rapid design iteration and approval processes, crucial for meeting the tight 3-month deadline.
Demonstrated experience with similar bridge types or geological conditions in the Podkarpackie region.
Möjligheter till socialt värde
While 'Social Aspects: No' is stated, consider a voluntary commitment to local employment or training opportunities for residents in the vicinity of the project sites. This can be framed as a positive contribution to the community and a demonstration of corporate responsibility, potentially influencing implicit evaluation factors.
Fokusområden för anbudet
Technical Capability (Design & Execution)

Provide detailed evidence of past successful bridge design and renovation projects. Showcase the qualifications and experience of the design team and site personnel. Clearly outline the methodology for developing the executive project and executing the works, emphasizing quality control and safety protocols.

Project Management & Schedule Adherence

Present a comprehensive and realistic project schedule, highlighting key milestones and resource allocation. Demonstrate a robust project management framework capable of ensuring timely completion within the 3-month duration. Include contingency plans for potential delays.

Understanding of Functional-Utility Program

Thoroughly analyze the functional-utility program and demonstrate a clear understanding of its requirements. Explain how the proposed design and execution plan will fully meet and potentially exceed these requirements, ensuring the long-term functionality and utility of the renovated bridges.

Rekommendationer6
Develop a Detailed Executive Project Plan
KritisktHög ansträngning

Create a comprehensive executive project plan that not only meets but anticipates the functional-utility program requirements. This plan should be highly detailed, showing clear methodologies for both design and execution, including specific construction techniques, material specifications, and quality assurance measures.

Ensures compliance with core technical requirements and demonstrates a high level of technical competence.
Proactive Value Engineering & Risk Mitigation
KritisktMedel ansträngning

Since evaluation criteria are not specified, proactively include a section on value engineering within the design phase to optimize cost and constructability, and a robust risk assessment and mitigation plan. This demonstrates foresight and a commitment to delivering value beyond the minimum requirements.

Addresses potential implicit evaluation factors and builds confidence in the bidder's ability to manage project complexities.
Highlight Specialized Bridge Renovation Expertise
HögMedel ansträngning

Showcase specific experience with the types of bridge structures involved (e.g., concrete, steel, specific span types) and the challenges associated with their renovation. Use case studies and testimonials to prove successful delivery of similar projects.

Establishes credibility and positions the bidder as a specialist, potentially outweighing competitors with broader but less specialized experience.
Develop a Robust 3-Month Project Schedule
HögHög ansträngning

Create a highly detailed and realistic project schedule that clearly allocates resources and timelines for both design and execution phases. Include critical path analysis and contingency planning to demonstrate feasibility within the tight 3-month duration.

Directly addresses the challenging project duration and instills confidence in the bidder's project management capabilities.
Voluntary Local Employment Commitment
LågLåg ansträngning

Despite 'Social Aspects: No', consider a voluntary commitment to utilizing local labor or subcontractors where feasible. Frame this as a benefit to the local community and a demonstration of responsible corporate citizenship.

May positively influence implicit evaluation factors and enhance the bidder's reputation.
Address Potential Site-Specific Challenges
MedelMedel ansträngning

Conduct a preliminary assessment of potential site-specific challenges (e.g., river flow, access, environmental considerations) for both bridge locations and outline how these will be managed during design and execution.

Demonstrates thoroughness and preparedness, reducing perceived risk for the contracting authority.
Konkurrenspositionering
Position the bid around integrated expertise, emphasizing the seamless transition from design to execution. Highlight the ability to deliver a complete solution efficiently. Focus on demonstrating a deep understanding of the specific technical challenges of bridge renovation and a proven track record of overcoming them within tight deadlines. Leverage any existing positive relationships with the Podkarpacki Zarząd Dróg Wojewódzkich to build trust and rapport.

Konkurrenter

Uppgradera för att se vilka företag som sannolikt kommer att lämna anbud på denna upphandling, baserat på historisk upphandlingsdata.

Logga in

Krav och kvalifikationer

7 krav inom 5 kategorier

Inlämning (1)
Obligatorisk (1)
Regelefterlevnad (1)
Teknisk (3)
Ekonomisk (1)
SUBMISSION REQUIREMENTS1
--No information in the provided text.
MANDATORY EXCLUSION GROUNDS1
--No information in the provided text.
ELIGIBILITY REQUIREMENTS1
--No information in the provided text.
TECHNICAL CAPABILITY REQUIREMENTS3
--Development of technical documentation including the executive project.
--Execution of works related to the renovation of 2 bridge structures.
--Compliance with the functional-utility program.
FINANCIAL REQUIREMENTS1
--No information in the provided text.

Förhandsgranskning av krav

Registrera dig för att se fullständiga krav och analyser

Dokument

2 dokument tillgängliga med AI-sammanfattningar

Notice PDFPDF
08de8e24-35bb-2b7e-5fad-950001e7268e.pdf

This document contains a public procurement notice for the design and execution of bridge renovations on two specific locations in Poland.

SWZ_WM_12_2026.zipZIP
SWZ_WM_12_2026.zip

Ingen sammanfattning tillgänglig för detta dokument.

Förhandsgranskning av dokument

Registrera dig för att se dokumentöversikter och analyser

75
Bra

Upphandlingskvalitetspoäng

This tender for bridge renovation is generally well-structured, with clear technical requirements and available documentation. However, the estimated value is undisclosed, and specific evaluation criteria are missing, impacting completeness and fairness.

Poängfördelning

Regelefterlevnad75/100

The tender adheres to general procurement principles with a clear CPV code and active status. Deadlines appear reasonable given the scope, though the submission deadline is relatively short. No disputes are indicated. The procedure type is not specified, which is a minor omission.

Procedure type not specified
Tydlighet80/100

The description of the works is clear, specifying the two bridge locations and the dual nature of the task (design and execution). The reference to the 'Program funkcjonalno – użytkowy' as an attachment for detailed requirements is a good practice for clarity.

Fullständighet70/100

Most basic information is present, including title, reference, organization, and deadlines. However, the estimated value of the contract is not disclosed, which is a significant omission. The duration is specified as 3 months. Key documents are available.

Estimated value not disclosed
Rättvisa85/100

The tender appears fair, with objective technical requirements and full document access. The use of e-procurement is noted. The absence of specific evaluation criteria could be a concern, but the requirements themselves do not appear tailored to specific companies.

Evaluation criteria not specified
Praktisk genomförbarhet65/100

The tender utilizes e-procurement, which is positive. The contract duration of 3 months is specified. However, information regarding financing is not provided, and the contract start date is not explicitly stated. The submission deadline is quite short.

Financing information not provided
Contract start date not specified
Datakonsistens90/100

Key fields such as title, reference, organization, and deadlines are populated. There are no indications of suspension or disputes. Dates are logical, with the submission deadline well in the future relative to the publication date.

Hållbarhet50/100

There is no explicit mention of green procurement, social aspects, or innovation within the provided tender information. The tender is not indicated as EU-funded.

No explicit sustainability criteria (green, social, innovation)

Styrkor

Clear technical requirements for bridge renovation
Availability of tender documents
Use of e-procurement
Well-defined CPV code and location

Potentiella problem

Estimated contract value not disclosed
Missing specific evaluation criteria
Short submission deadline
Lack of sustainability considerations

Rekommendationer

1. Disclose the estimated contract value to provide better context for bidders.
2. Specify the evaluation criteria to ensure transparency and fairness in the selection process.
3. Consider extending the submission deadline to allow for more thorough preparation by potential bidders.

Förhandsgranskning av AI-poäng

Registrera dig för att se fullständiga krav och analyser

Fullständig analys av kvalitetsbetyg
Detaljerad uppdelning av delpoäng
Insikter om styrkor och svagheter
Strategiska rekommendationer

Inget kreditkort krävs • Konfiguration på 2 minuter

Lägg till i pipeline