Behöver du hjälp av en upphandlingsexpert? Se vår tjänst för anbudsförberedelse
Upphandlingar

Byte av panna för Aylsham Town Council

Öppen
Sista anbudsdag
4 dagar kvar
30 september 2026
Avtalsdetaljer
Kategori
Open Procedure
Referens
083362-2026
Värde
£50,000
Plats
East Anglia, Storbritannien
Publicerad
18 september 2026
Organisation
CPV-kod
Tidsplan för projektet

Upphandling publicerad

3 september 2026

Sista dag för frågor

23 september 2026

Sista anbudsdag

30 september 2026

Avtalets startdatum

1 november 2026

KöparinsikterPRO
🔒
Lås upp köparinsikter
Se utgiftsmönster, föredragna procedurer och mer.
Uppgradera till Professional →
Budget
£50,000
Varaktighet
2 månader
Plats
East Anglia
Typ
Open Procedure

Ursprunglig beskrivning av upphandling

1) New Town Hall Main Boiler - LOCATION, AYLSHAM, NORFOLK, NR11 6EL • Supply and install new 2no. Commercial 48KW (total 96KW) high efficiency condensing boilers. Minimum 5 years manufacturer's guarantee • Boilers to be fitted in existing boiler room (cellar) at a suitable height to reduce risk from flooding. • Existing pipework to be re-routed to new boilers. • Supply and instal new flue liner in chimney stack. This may be subcontracted out but subcontractor will report to the successful contractor. • Flues to be connected to new flue liner. • Old boiler to be removed from site and disposed of. • New boilers to be plumbed in to new plate heat exchanger to split system up and keep existing system open vent, utilizing the existing header tank in loft. • New larger circulation pump fitted to serve original heating system. • System to be split into 2 zones. The first zone will be the original heating system and the second zone will consist of the Council Chamber and Archives room (first floor). • 2no. motorized valves. • New 35mm copper pipe work from boiler area installed to existing heating system. • System to be adapted to a sealed pressurized system with expansion vessel and filling loop. • System filter fitted to filter out debris in the heating system. • New 28mm copper gas pipe installed from gas meter to new boilers. • Boiler to be wired in to 3-amp fused spur. • Supply and fit HIVE smart heating controls to control 2 x zones for use with App. Provide instructions on app • Condense pipe from boiler plumbed into nearest drain. 2) Replace 2no. gas heaters with Fan assisted heaters • New fan assisted heater to be installed to replace gas heaters (2no.). One on the ground floor (Green Room) and one on the first floor (council chamber). • New pipe work from new boiler area fitted to new radiator locations. Pipe work to be surface mounted in copper but hidden, where possible underflooring. • Existing gas heaters to be removed and disposed of to make way for new radiators. • System will be flushed to comply with manufacture instructions, to remove sludge and debris, using a chemical cleaner. • System corrosion inhibitor will be introduced into the heating system. • Green room heater to be connected to Zone 1, council chamber to be connected to Zone 2. 3) Installation of 3no. Radiators • Installation of 2no. radiators in the archive room (zone 2). • Installation of 1no. radiator in the ground floor east toilet (zone 1). • Area to be connected with a 2 port valve and thermostat. • All necessary pipework supplied and fitted. 4) Other • Boiler will be commissioned and registered with Gas Safety Certificate • Warranty to be provided (with option of extension where available). • The Town Hall is a working building. All works to be programmed in in coordination with Town Council officers so that there is either minimal impact on hirers of the building, or the building can be closed for safety reasons. • Any damage to the fabric of the Town Hall should be made good • All waste materials to be cleared from site in accordance with the contractor's waste transfer licence. • The successful contractor will be expected to provide a risk assessment and method statement for the works, and provide evidence of Public Liability insurance. • A site visit is strongly recommended prior to pricing for works. This can be arranged through the Town Council's Maintenance Manager Gavin Watson (email gavin.watson@aylsham-tc.gov.uk or call 07585 600539)

Riskanalys

Riskanalys är ännu inte tillgänglig för detta lands upphandlingar. För närvarande stöds: Estland, Lettland, Litauen, Polen, Frankrike, Storbritannien, Danmark, Nederländerna, Norge och Finland.

Vinnande strategi

Få en AI-driven vinnande strategi anpassad för denna upphandling. Inkluderar poäng för vinstsannolikhet, viktiga möjligheter och utmaningar, rekommenderade fokusområden för anbudet, insikter om konkurrenspositionering och handlingsbara rekommendationer för att maximera dina chanser.

Logga in

Konkurrenter

Uppgradera för att se vilka företag som sannolikt kommer att lämna anbud på denna upphandling, baserat på historisk upphandlingsdata.

Logga in

Krav och kvalifikationer

AI extraherar och organiserar alla krav från upphandlingsdokumenten — obligatoriska kvalifikationer, tekniska specifikationer, finansiella villkor och inlämningsregler — tydligt kategoriserade så att du vet exakt vad som krävs för att lämna anbud.

Logga in

Grundläggande krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokument

3 dokument tillgängliga med AI-sammanfattningar

OCDS RecordDOC
083362-2026_ocds_record.json

Ingen sammanfattning tillgänglig för detta dokument.

OCDS Release PackageDOC
083362-2026_ocds_release.json

Ingen sammanfattning tillgänglig för detta dokument.

Official PDF VersionPDF
083362-2026_official.pdf

Ingen sammanfattning tillgänglig för detta dokument.

Förhandsgranskning av dokument

Registrera dig för att se dokumentöversikter och analyser

Kvalitetspoäng

Omfattande kvalitetsanalys av denna upphandling som bedömer juridisk efterlevnad, tydlighet, fullständighet, rättvisa, praktisk genomförbarhet, datakonsistens och hållbarhet på en skala från 0-100 med detaljerad uppdelning och rekommendationer.

Logga in