Projektovanje i izgradnja puteva i komunalnih mreža Sõeru tee L3

Otvoreno
Rok
ostalo 4 dana
April 08, 2026
Detalji ugovora
Kategorija
Građevinarstvo
Referenca
306422
Vrednost
€1,000,000
Lokacija
Estonia, Estonija
Objavljeno
Mart 09, 2026
Organizacija
CPV šifra
Kriterijumi za ocenu
Design and construction works100%
Vremenski okvir projekta

Objavljen tender

Mart 09, 2026

Rok za pitanja

April 01, 2026

Rok za podnošenje ponuda

April 08, 2026

Otvaranje ponuda

April 08, 2026

Verovatnoća pobedePRO
🔒
Nadogradite na Professional
Pogledajte svoju procenjenu verovatnoću pobede na osnovu istorijskih podataka.
Nadogradite na Profesionalni paket →
Informacije o naručiocuPRO
🔒
Otključajte informacije o naručiocu
Pogledajte obrasce potrošnje, preferirane procedure i još mnogo toga.
Nadogradite na Profesionalni paket →
Uvid u sektorPRO
🔒
Otključajte uvide u sektor
Pogledajte prosečne pobedničke cene, nivoe konkurencije i tržišne trendove.
Nadogradite na Profesionalni paket →
Budžet
€1,000,000
Trajanje
14 meseci
Lokacija
Estonia
Tip
Građevinarstvo
75
Rezultat kvaliteta/100
Dobro
Uporedna analiza tržišta
Prosečna pobednička cena
€524,963
Prosečan broj ponuda
4.7
Konkurencija
Srednja
Pobednici iz redova MSP
94%
5,932 analiziranih tendera

Originalni opis tendera

Projektovanje i izgradnja puteva i komunalnih mreža Sõeru tee L3, selo Alliku, opština Saue, u skladu sa zadatkom datim u Aneksu 1.
Elektronsko podnošenje

Pokreni analizu rizika

Identifikujte potencijalne rizike, neusklađenosti i upozorenja u svim tenderskim dokumentima. Dobijte detaljan izveštaj o rizicima sa nivoima ozbiljnosti i preporukama za ublažavanje.

Prijavite se

Strategija za pobedu

AI analiza zahteva, prilika i izazova ovog tendera. Dobijte strateške uvide za povećanje verovatnoće pobede.

65%
Procenjena verovatnoća pobedeUmereno podudaranje

This tender is heavily weighted towards price, making cost optimization paramount. Bidders must demonstrate robust technical capability in road and utility design/construction, with a strong emphasis on compliance and risk management, particularly concerning subcontractor vetting. Differentiation will come from efficient project delivery and a clear understanding of the contracting authority's requirements.

Ključne poruke za pobedu

Cost-effective, compliant, and timely delivery of integrated road and utility infrastructure.

Proven expertise in all facets of road and utility design and construction, ensuring a seamless project lifecycle.

Unwavering commitment to ethical sourcing and compliance, guaranteeing a secure and reliable project execution.

Ključne prilike
Price-driven evaluation offers a clear path to maximum scoring for the lowest bid.
Integrated design and build contract simplifies project management and coordination for the bidder.
The absence of specific green or social value requirements allows focus on core technical and cost aspects.
Ključni izazovi
Intense price competition due to 100% cost weighting.

Conduct thorough cost analysis, optimize resource allocation, explore efficient construction methodologies, and negotiate favorable terms with suppliers. Consider lean construction principles.

Strict subcontractor vetting regarding association with the Russian Federation requires diligent due diligence.

Establish a robust subcontractor pre-qualification process that includes mandatory declarations and verification of their supply chain. Maintain a list of pre-approved, compliant subcontractors.

Potential for scope creep or unforeseen technical challenges during design and construction.

Develop a detailed risk management plan, including contingency planning for technical issues and scope changes. Ensure clear communication channels with the contracting authority for any proposed modifications.

Profil idealnog ponuđača
A well-established construction and engineering firm with proven experience in integrated road and utility infrastructure projects, particularly in Estonia. The ideal bidder possesses strong project management capabilities, a streamlined supply chain, and a proactive approach to risk mitigation and compliance. They should also have a clear understanding of Estonian construction regulations and standards.
Ključni zahtevi
Design and construction of roads and utilities for Sõeru tee L3
Preparation of the main project, including deadlines
Application for a building permit
Construction of water, sewage, rainwater, and drainage pipelines
Design and construction of roads
Design and construction of street lighting
Design and construction of telecommunication ducting
No subcontractors or suppliers involved in the execution of the contract shall be associated with the Russian Federation.
The cost of design and construction works will be evaluated. The lowest price will receive the maximum score.
Ključni diskriminatori
Demonstrable cost leadership through efficient project planning and execution.
A highly experienced and integrated project team with a track record of successful similar projects.
Proactive risk management and a clear understanding of regulatory compliance.
Prilike za društvenu vrednost
While not explicitly required, consider a commitment to local employment and skills development within the Saue vald region as a potential positive differentiator, even if not formally scored.
Fokusne oblasti ponude
Design and construction works100.0%

Develop a highly competitive and accurate cost proposal. Conduct detailed cost breakdowns for all design and construction elements. Leverage economies of scale and efficient procurement strategies to achieve the lowest possible price. Ensure all costings are fully compliant with the tender requirements and reflect realistic execution timelines.

Preporuke6
Aggressively Optimize Pricing Strategy
KritičnoVeliki napor

Given the 100% weighting on cost, every effort must be made to submit the lowest possible competitive price. This requires meticulous cost engineering, efficient resource planning, and potentially exploring innovative construction methods that reduce overall project expenditure without compromising quality or safety.

Directly maximizes score for the primary evaluation criterion, significantly increasing win probability.
Implement Robust Subcontractor Vetting Process
KritičnoSrednji napor

Develop and rigorously apply a pre-qualification process for all potential subcontractors and suppliers to ensure strict adherence to the requirement of no association with the Russian Federation. This includes obtaining signed declarations and conducting background checks.

Prevents mandatory exclusion from the tender, ensuring eligibility.
Develop a Detailed and Realistic Project Schedule
VisokoSrednji napor

Prepare a comprehensive project plan that clearly outlines all phases of design, permitting, and construction, with realistic deadlines. This demonstrates capability and foresight, crucial for the 'preparation of the main project' requirement.

Builds confidence in the bidder's ability to deliver within the 14-month timeframe.
Highlight Integrated Design and Build Expertise
SrednjeMali napor

Emphasize the bidder's capability to seamlessly manage both the design and construction phases. This integrated approach can lead to efficiencies, reduced risk, and better coordination, which can be subtly communicated even if not a formal evaluation criterion.

Positions the bidder as a more capable and efficient partner.
Thoroughly Review and Understand ETÜ 2013 and Contractual Terms
VisokoSrednji napor

Gain a deep understanding of the 'General terms and conditions for construction works' (ETÜ 2013) and the contract project. Identify potential risks and liabilities within these documents and ensure the bid reflects a clear understanding and acceptance of these terms, with appropriate cost provisions.

Minimizes unforeseen costs and legal disputes during contract execution.
Clarify Ambiguities with Contracting Authority
SrednjeMali napor

If any aspects of Lisas 1, DD Lisa 1b, or ETÜ 2013 are unclear, proactively seek clarification from Aktsiaselts KOVEK through the designated channels. This demonstrates engagement and ensures the bid accurately reflects requirements.

Reduces the risk of misinterpretation and ensures a compliant bid.
Konkurentsko pozicioniranje
Position as the most cost-efficient provider without compromising on technical execution. Highlight streamlined processes and a lean operational model. Emphasize a proven track record of delivering similar projects on time and within budget, demonstrating reliability and expertise in all required technical areas.

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

19 zahteva u 5 kategorija

Predaja (6)
Obavezno (1)
Usklađenost (3)
Tehnički (8)
Finansijski (1)
SUBMISSION REQUIREMENTS6
--Bids will be evaluated based on the cost of design and construction works, with the lowest price receiving the maximum score.
--The tender duration is 14 months.
--The deadline for submission is 2026-04-08 11:00:00.
MANDATORY EXCLUSION GROUNDS1
--No subcontractors or suppliers involved in the execution of the contract shall be associated with the Russian Federation.
ELIGIBILITY REQUIREMENTS3
--Bidders must confirm they will not engage subcontractors or suppliers associated with the Russian Federation.
--Bidders must provide information regarding trade secrets.
--If participating as a joint offer, a power of attorney is required for one company representing others in the joint offer, authorizing them to submit the offer and fulfill contractual obligations.
TECHNICAL CAPABILITY REQUIREMENTS8
--Design and construction of roads and utilities for Sõeru tee L3.
--Preparation of the main project, including deadlines.
--Application for a building permit.
FINANCIAL REQUIREMENTS1
--The tender value is 1,000,000.0 EUR.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

13 dokumenata dostupno sa AI sažecima

Alltöövõtjate kontrollimise tingimused lepingu täitmise etapisPDF
306422_alltoovotjate_kontrollimise_tingimused... -- 20.7 KB

The contracting authority will check subcontractors' backgrounds regarding criminal convictions for fraud, money laundering, or terrorist financing, requiring relevant explanations and evidence.

VastavustingimusedPDF
306422_vastavustingimused.pdf -- 10.7 KB

The bidder must confirm that they will not involve subcontractors or suppliers linked to the Russian Federation in the contract execution and must provide information on trade secrets.

Hindamiskriteeriumid ja hinnatavad näitajadPDF
306422_hindamiskriteeriumid.pdf -- 2.8 KB

The contracting authority will evaluate bids based on the cost of design and construction works, where the lowest price receives the maximum score.

Hankepass täiendatavate selgitustegaPDF
306422_hankepass_taiendavate_selgitustega.pdf -- 73.9 KB

The 'Hankepass täiendavate selgitustega' is an explanatory document that familiarizes bidders with tender conditions and expected responses, but is not intended for completion.

HankedokumentDOC
Hankedokument.docx -- 50.6 KB

The tender document contains general information about the open procurement procedure for the design and construction of Sõeru tee L3 roads and utility networks.

DD Lisa 1bDOC
Lisa 1b Nõuded vee- , kanalisatsiooni- , sade... -- 271.0 KB

Tender document DD Annex 1b contains general information about the design and construction works on Sõeru road, necessary for preparing a bid.

HD Lisa 1cDOC
Lisa 1c Nõuded teede projekteerimisele ja ehi... -- 27.8 KB

This document outlines the requirements for the design and construction of Sõeru tee L3 roads and utility networks, including applicable legislation and standards.

HD Lisa 1dDOC
Lisa 1d Nõuded tänavavalgustuse projekteerimi... -- 27.4 KB

This tender document outlines the requirements for the design and construction of street lighting for Sõeru tee L3, specifying technical standards and legal acts.

HD Lisa 1eDOC
Lisa 1e Nõuded sidekanalisatsiooni projekteer... -- 27.1 KB

This document outlines the requirements for the design and construction of telecommunication ducting in the Sõeru tee L3 area, governed by various legal acts and guidelines.

HD Lisa 1DOC
Lisa 1 Nõuded projekteerimisele ja ehitamisel... -- 26.4 KB

This tender document outlines the requirements for the design and construction of roads and utility networks at Sõeru tee L3, including main project completion deadlines and the building permit application process.

Ühispakkumuses osalemise volikiriDOC
Lisa 2 Ühispakkumuses osalemise volikiri.docx -- 22.1 KB

This power of attorney is required when one company represents another in a joint bid, authorizing them to submit the bid and fulfill contractual obligations.

Töövõtulepingu projektDOC
Lisa 3 Töövõtulepingu projekt.docx -- 55.4 KB

The draft contract project defines the terms of the contract for the design and construction of Sõeru tee L3 roads and utility networks, the rights and obligations of the parties, and the requirements for the contractor.

ETÜ 2013DOC
Lisa 5 ETÜ 2013.docx -- 112.5 KB

This document specifies the general terms and conditions for construction works contracts, including details on the client and contractor, contract execution specifics, guarantees, and insurances.

Pregled dokumenata

Registrujte se da biste videli sažetke i analizu dokumenata

75
Dobro

Rezultat kvaliteta tendera

This tender for road and utility design and construction is generally well-structured with clear technical requirements and a straightforward evaluation criterion. However, it lacks explicit sustainability considerations and relies on a standard e-procurement platform.

Pregled rezultata

Zakonska usklađenost75/100

The tender appears to comply with standard procurement regulations. Deadlines are reasonable, and the procedure is clear. The CPV code is provided, and there are no indications of disputes or regulatory non-compliance. The financing condition is clearly stated.

Jasnoća80/100

The description of the works is clear, and the technical requirements are detailed across several annexes. Evaluation criteria are specified, although the 'relative_weighting' could be more explicit. Conditions for participation are generally well-documented.

Potpunost70/100

Most basic information is present, including estimated value, duration, and deadlines. Key documents like technical specifications and contract templates are attached. However, the 'Hankepass rahvusvahelises formaadis (ESPD) v2.0 laiendatud' is in an XML format not directly analyzable, and the 'Hindamiskriteeriumid' document is marked as not required, which could be a point of confusion.

ESPD document format not directly analyzable.
Evaluation criteria document marked as not required.
Pravičnost85/100

The tender is conducted via e-procurement, ensuring broad access. The estimated value is disclosed. Criteria are objective (lowest price). The exclusion of subcontractors/suppliers associated with the Russian Federation is a specific, but not company-tailored, requirement. The requirement for power of attorney in joint offers is standard.

Praktičnost65/100

E-submission is mandated, which is practical. A document URL for the opening place is provided. The contract duration is specified. Financing conditions are mentioned. However, the contract start date is not explicitly stated, and the reliance on a standard e-procurement platform is noted.

Contract start date not explicitly stated.
Konzistentnost podataka90/100

Key fields such as title, reference, organization, value, and deadlines are populated. There are no indications of suspension or disputes. Dates are logically sequenced (Reveal Date, Submission Deadline, Opening Date).

Održivost50/100

The tender does not explicitly mention green procurement, social aspects, or innovation. It is not indicated as EU-funded. This area is underdeveloped.

Lack of explicit green procurement criteria.
Absence of social or innovation considerations.

Prednosti

Clear technical specifications for design and construction.
Objective evaluation criterion (lowest price).
Standard e-procurement process.
Well-defined exclusion criteria related to geopolitical factors.

Nedostaci

Lack of explicit sustainability and innovation requirements.
Some documents marked as not required could be clearer.
Contract start date missing.

Preporuke

1. Incorporate specific sustainability and innovation criteria into the evaluation.
2. Clarify the status and necessity of all listed documents, especially the evaluation criteria.
3. Specify the intended contract start date.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan