Skip to main content
Želite da licitirate na javnim nabavkama? Pogledajte našu uslugu pripreme tendera TaaS
Tenderi

Linkoln koledž – Izolacija potkrovlja – Zgrada Abbey, Zgrada Friary i Zgrada Temple

Otvoreno
Rok
ostalo 19 dana
April 24, 2026
Detalji ugovora
Kategorija
Open Procedure
Referenca
023145-2026
Vrednost
Nije otkriveno
Lokacija
Lincolnshire, Ujedinjeno Kraljevstvo
Objavljeno
Mart 28, 2026
Organizacija
CPV šifra
Vremenski okvir projekta

Objavljen tender

Mart 13, 2026

Rok za pitanja

April 17, 2026

Rok za podnošenje ponuda

April 24, 2026

Datum početka ugovora

Jun 28, 2026

Budžet
Nije otkriveno
Trajanje
2 meseci
Lokacija
Lincolnshire
Tip
Open Procedure
75
Rezultat kvaliteta/100
Dobro

Originalni opis tendera

Salix PSDS Faza 4 – Izolacija potkrovlja u Linkoln koledžu – Zgrada Abbey, Zgrada Friary i Zgrada Temple

Analiza rizika

Analiza rizika još uvek nije dostupna za tendere u ovoj zemlji. Trenutno podržano: Estonija, Poljska, Litvanija i Letonija.

Strategija za pobedu

Dobijte AI strategiju za pobedu prilagođenu ovom tenderu. Uključuje ocenu verovatnoće pobede, ključne prilike i izazove, preporučene oblasti fokusa za ponudu, uvide u konkurentsko pozicioniranje i konkretne preporuke za maksimiziranje vaših šansi.

Prijavite se

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

AI izdvaja i organizuje sve zahteve iz tenderskih dokumenata — obavezne kvalifikacije, tehničke specifikacije, finansijske uslove i pravila za podnošenje — jasno kategorizovane kako biste znali tačno šta je potrebno za podnošenje ponude.

Prijavite se

Dokumenti

Dobijte AI-generisane sažetke svih tenderskih dokumenata. Brzo razumejte šta svaki dokument sadrži bez čitanja stotina stranica — uključujući obim, uslove, kriterijume evaluacije i ključne obaveze.

Prijavite se
75
Dobro

Rezultat kvaliteta tendera

This tender for loft insulation at Lincoln College is generally well-structured but lacks crucial financial transparency and detailed evaluation criteria. The short contract duration and absence of explicit sustainability considerations are notable drawbacks.

Pregled rezultata

Zakonska usklađenost75/100

The tender adheres to basic legal requirements with a clear procedure and CPV code. Deadlines are present, though the submission deadline might be considered short given the scope. No disputes are reported. The absence of a reveal date is a minor procedural oversight.

Missing reveal date
Jasnoća80/100

The description of the works is clear, and the AI-extracted requirements outline the necessary categories for submission. However, the lack of specified evaluation criteria leaves potential bidders uncertain about how their submissions will be assessed.

No evaluation criteria specified
Potpunost70/100

Key information such as the title, reference, organization, and CPV code is present. The contract duration and start date are specified. However, the estimated value is not disclosed, and the content of the tender documents is not available, hindering a full assessment.

Value not disclosed
No document content available
Pravičnost85/100

The tender is open, and the value is classified, suggesting an intention for transparency, though the actual value is not disclosed. The criteria for eligibility and technical capability are mentioned, implying objective assessment. The lack of specific evaluation criteria is a minor concern for fairness.

Praktičnost65/100

The contract duration of two months is short for insulation works. The absence of explicit e-submission details and the lack of financing information reduce practicality. The contract start date is provided.

Contract duration may be too short
No e-submission specified
Konzistentnost podataka90/100

Key fields like title, reference, organization, and dates are populated logically. There are no reported disputes or suspensions. The dates provided are consistent.

Održivost50/100

There is no explicit mention of green procurement, social aspects, or innovation within the tender details. This suggests a lack of focus on sustainability criteria.

Not green procurement
No social criteria

Prednosti

Clear title and reference number
Organization and CPV code specified
AI-extracted requirements outline submission categories
Open procedure

Nedostaci

Estimated value not disclosed
No evaluation criteria specified
Content of tender documents not available
Short contract duration
Lack of sustainability focus

Preporuke

1. Disclose the estimated contract value for better transparency.
2. Specify clear evaluation criteria to guide bidders and ensure fair assessment.
3. Consider incorporating sustainability criteria into the tender.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan