Skip to main content
Želite da licitirate na javnim nabavkama? Pogledajte našu uslugu pripreme tendera TaaS
Tenderi

Izrada dokumentacije idejnog projekta, izgradnja i stručni nadzor inovativnog, integrisanog niskotemperaturnog sistema podnog grejanja i projektovanje ventilacionog sistema za Mlečni paviljon RCT

Otvoreno
Rok
ostalo 4 dana
April 08, 2026
Detalji ugovora
Kategorija
Građevinarstvo
Referenca
161683
Vrednost
Nije otkriveno
Lokacija
Riga, Letonija
Objavljeno
Mart 19, 2026
CPV šifra
Vremenski okvir projekta

Objavljen tender

Mart 19, 2026

Rok za pitanja

April 01, 2026

Rok za podnošenje ponuda

April 08, 2026

Otvaranje ponuda

April 08, 2026

Verovatnoća pobedePRO
🔒
Nadogradite na Professional
Pogledajte svoju procenjenu verovatnoću pobede na osnovu istorijskih podataka.
Nadogradite na Profesionalni paket →
Uvid u sektorPRO
🔒
Otključajte uvide u sektor
Pogledajte prosečne pobedničke cene, nivoe konkurencije i tržišne trendove.
Nadogradite na Profesionalni paket →
Budžet
Nije otkriveno
Trajanje
5 meseci
Lokacija
Riga
Tip
Građevinarstvo
75
Rezultat kvaliteta/100
Dobro
Uporedna analiza tržišta
Prosečna pobednička cena
€491,981
Prosečan broj ponuda
3.0
Konkurencija
Niska
Pobednici iz redova MSP
99%
20,606 analiziranih tendera

Originalni opis tendera

Izrada dokumentacije idejnog projekta, izgradnja i stručni nadzor inovativnog, integrisanog niskotemperaturnog sistema podnog grejanja i projektovanje ventilacionog sistema za Mlečni paviljon RCT
Finansirano od strane EU

Pokreni analizu rizika

Identifikujte potencijalne rizike, neusklađenosti i upozorenja u svim tenderskim dokumentima. Dobijte detaljan izveštaj o rizicima sa nivoima ozbiljnosti i preporukama za ublažavanje.

Prijavite se

Strategija za pobedu

AI analiza zahteva, prilika i izazova ovog tendera. Dobijte strateške uvide za povećanje verovatnoće pobede.

70%
Procenjena verovatnoća pobedeUmereno podudaranje

This tender requires a comprehensive approach to developing, constructing, and supervising an innovative low-temperature floor heating system and designing a ventilation system for the RCT Dairy Pavilion. A winning bid will focus on demonstrating technical expertise, adherence to specifications, and a clear understanding of the project's integrated nature, leveraging the limited evaluation criteria to our advantage.

Ključne poruke za pobedu

Integrated Expertise: Seamless delivery of innovative low-temperature heating and ventilation systems through unified design, construction, and supervision.

Proven Performance: Demonstrated success in delivering complex HVAC projects on time and to specification for public sector clients.

Future-Ready Solutions: Commitment to efficient and sustainable building services that meet the specific needs of the RCT Dairy Pavilion.

Ključne prilike
The absence of specified evaluation criteria suggests a strong emphasis on meeting all mandatory requirements and demonstrating technical competence. This allows bidders to focus on a comprehensive and compliant proposal.
The 'innovative' aspect, though not explicitly detailed, presents an opportunity to showcase forward-thinking design and construction methodologies for low-temperature heating, potentially exceeding basic requirements.
The short 5-month duration requires a highly efficient project management and execution plan, which can be a differentiator if presented convincingly.
Ključni izazovi
The lack of specified evaluation criteria makes it difficult to prioritize bid elements and understand the weighting of different aspects. This requires a balanced approach to all requirements.

Address all mandatory requirements with equal rigor. Focus on demonstrating comprehensive technical capability and adherence to the contract draft and technical specifications. Assume that technical compliance and demonstrable capability will be paramount.

The 'innovative' aspect is subjective and not detailed, posing a risk of misinterpretation or failing to meet the contracting authority's unstated expectations.

Thoroughly review the technical specification for any implicit requirements or hints towards innovation. Propose solutions that are demonstrably advanced in terms of energy efficiency, control systems, or material usage within the context of low-temperature heating. Highlight any unique or cutting-edge aspects of the proposed system.

The 5-month duration is aggressive for a project involving design, construction, and supervision, requiring meticulous planning and resource allocation.

Develop a detailed project schedule with clear milestones and contingency plans. Demonstrate strong project management capabilities and resource availability to ensure timely completion. Highlight past experience with similar compressed timelines.

Profil idealnog ponuđača
A medium-to-large construction and engineering firm with proven experience in integrated HVAC systems, specifically low-temperature heating, and a strong track record in public sector projects within Latvia. The ideal bidder will possess in-house design capabilities for both heating and ventilation, and a robust project management team capable of delivering within a tight 5-month timeframe.
Ključni zahtevi
Development of an innovative, integrated low-temperature floor heating system.
Construction of the innovative, integrated low-temperature floor heating system.
Supervision of the innovative, integrated low-temperature floor heating system.
Design of a ventilation system for the RCT Dairy Pavilion.
Compliance with the technical specification for the heating and ventilation system.
Submission of a site visit confirmation.
Use of the provided technical proposal template.
Adherence to the contract draft.
Ključni diskriminatori
Demonstrated experience in designing and implementing integrated low-temperature floor heating systems that achieve superior energy efficiency and occupant comfort.
A robust and well-articulated project management plan that clearly outlines how the 5-month deadline will be met without compromising quality.
Evidence of successful collaboration with public sector clients and a deep understanding of Latvian procurement regulations.
A proactive approach to risk management, identifying potential issues and proposing concrete mitigation strategies.
Prilike za društvenu vrednost
While 'Social Aspects: No' is stated, a bidder could voluntarily propose a commitment to local employment or skills development for the construction phase, framing it as a contribution to the community and a demonstration of responsible contracting. For example, 'Commitment to sourcing at least 70% of the construction workforce from the local Riga region and offering on-the-job training opportunities for apprentices.'
Fokusne oblasti ponude
Technical Capability (Heating System)

Provide detailed technical documentation, including design principles, material specifications, and performance calculations for the innovative low-temperature floor heating system. Emphasize energy efficiency, controllability, and integration with the building's overall structure. Showcase past projects with similar systems.

Technical Capability (Ventilation System)

Present a clear and comprehensive ventilation design that addresses the specific needs of a dairy pavilion (e.g., air quality, temperature control, humidity management). Ensure compliance with relevant building codes and standards. Highlight any energy-saving features of the ventilation system.

Project Management and Delivery

Develop a detailed, realistic, and achievable project plan that clearly demonstrates how the 5-month duration will be met. Include resource allocation, critical path analysis, and risk mitigation strategies. Highlight the experience of the project management team.

Compliance and Documentation

Meticulously follow all submission requirements, including the use of the provided templates and adherence to the contract draft. Ensure all mandatory attachments are included and accurately completed. A site visit confirmation is critical.

Preporuke7
Conduct Thorough Site Visit
KritičnoSrednji napor

Mandatory site visit confirmation is required. A detailed site visit will allow for a deeper understanding of the RCT Dairy Pavilion's specific conditions, enabling a more accurate and tailored proposal for both heating and ventilation systems, and identifying potential challenges early.

Ensures compliance, informs technical proposal, identifies risks.
Focus on Technical Excellence and Compliance
KritičnoVeliki napor

Given the unspecified evaluation criteria, assume that meeting all technical requirements and demonstrating robust capability in both heating and ventilation design and construction will be paramount. Provide detailed, evidence-based technical proposals.

Maximizes scoring potential in the absence of explicit weighting.
Highlight 'Innovative' Aspects
VisokoSrednji napor

While 'innovative' is not defined, proactively showcase any advanced technologies, energy-efficient solutions, or unique design approaches in the low-temperature floor heating system that go beyond standard practice. This could include smart control systems, advanced insulation techniques, or novel material applications.

Sets the bid apart from competitors offering standard solutions.
Develop a Detailed 5-Month Project Plan
VisokoVeliki napor

The 5-month duration is a significant constraint. A comprehensive and realistic project plan, including resource allocation, key milestones, and risk mitigation, is essential to demonstrate feasibility and build confidence.

Increases perceived capability and reduces perceived risk for the contracting authority.
Address Potential Ambiguity in 'Innovative'
SrednjeMali napor

If the technical specification provides no further detail on 'innovative', consider including a section in the proposal that outlines the bidder's interpretation of innovation in this context and how their proposed solution embodies it, referencing best practices and industry advancements.

Proactively manages a potential point of confusion or subjective evaluation.
Voluntary Social Value Contribution
NiskoMali napor

Although not mandated, consider including a voluntary commitment to local employment or skills development. This can be a positive differentiator and align with broader public sector objectives, even if not explicitly evaluated.

Enhances corporate social responsibility image, potential minor differentiator.
Strict Adherence to Templates and Contract
KritičnoSrednji napor

The tender explicitly requires using the provided technical proposal template and adhering to the contract draft. Deviations can lead to disqualification. Ensure meticulous attention to detail in formatting and content.

Ensures compliance and avoids administrative rejection.
Konkurentsko pozicioniranje
Position the bid as the most technically competent and reliable partner for delivering an integrated, high-performance heating and ventilation solution for the RCT Dairy Pavilion. Emphasize a proven track record in similar public sector projects and a proactive approach to project management that guarantees timely delivery within the tight 5-month timeframe. Highlight any unique technological advantages or efficiencies offered by the proposed 'innovative' system.

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

14 zahteva u 5 kategorija

Predaja (5)
Obavezno (1)
Usklađenost (2)
Tehnički (5)
Finansijski (1)
SUBMISSION REQUIREMENTS5
--Bidders must submit a site visit confirmation.
--Bidders must use the provided technical proposal template.
--Bidders must adhere to the contract draft.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided summaries.
ELIGIBILITY REQUIREMENTS2
--Bidders must be able to develop, construct, and supervise an innovative, integrated low-temperature floor heating system and ventilation design.
--Bidders must comply with the regulations outlined in the tender documents.
TECHNICAL CAPABILITY REQUIREMENTS5
--Development of an innovative, integrated low-temperature floor heating system.
--Construction of the innovative, integrated low-temperature floor heating system.
--Supervision of the innovative, integrated low-temperature floor heating system.
FINANCIAL REQUIREMENTS1
--No specific financial requirements are detailed in the provided summaries.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

5 dokumenata dostupno sa AI sažecima

Iepirkuma priekšmeta prasības, 1.versijaPDF
161683_PD.ANY_1_1_1_20260319104404.pdf -- 95.6 KB

This document outlines the tender requirements for the development, construction, and supervision of an innovative, integrated low-temperature floor heating system and ventilation system design for the RCT Dairy Pavilion.

LīgumsDOC
Liguma projekts_pielikums_9.docx -- 117.7 KB

This document contains a draft contract for the development, construction, and supervision of an innovative low-temperature floor heating system and ventilation design for the Riga Central Market's Milk Pavilion, awarded through tender CAIP 2025/143.

Nolikuma pielikumiZIP
Nolikuma pielikumi.zip -- 4.4 MB

This document contains attachments for a tender, including a site visit confirmation, a technical proposal template, and a technical specification for an innovative heating and ventilation system for the Riga Central Market.

Nolikums_2025_143DOC
Nolikums_2025_143_FIN.docx -- 134.4 KB

This document contains the regulations for an open tender procedure for the development, construction, and supervision of an innovative, integrated low-temperature floor heating system and ventilation system design for the Riga Central Market's Dairy Pavilion.

Main tender pageHTM
index.html

This document contains the basic data for an open tender procedure (CAIP 2025/143) for the development, construction, and supervision of an innovative low-temperature floor heating system and ventilation design for the RCT Dairy Pavilion.

Pregled dokumenata

Registrujte se da biste videli sažetke i analizu dokumenata

75
Dobro

Rezultat kvaliteta tendera

This tender for innovative floor heating and ventilation system design and construction is generally well-structured, with clear technical requirements and available documentation. However, the lack of disclosed financial value and specific evaluation criteria slightly impacts fairness and completeness.

Pregled rezultata

Zakonska usklađenost75/100

The tender follows an open procedure with a clear CPV code and is EU funded, indicating good regulatory compliance. Deadlines appear reasonable within the context of the tender's scope. No disputes are noted.

Jasnoća80/100

The description of the works is specific, detailing the innovative nature of the heating system and the ventilation design. Key requirements are outlined, and the availability of technical specifications and contract drafts enhances clarity.

Potpunost70/100

Most basic information is present, including title, reference, organization, and duration. However, the estimated value is not disclosed, which is a significant omission for bidders assessing the project's scale. Key documents like technical specifications and contract drafts are available.

Estimated value not disclosed
Pravičnost85/100

The tender is an open procedure with e-procurement, promoting fairness. All required documents are accessible. However, the absence of disclosed evaluation criteria makes it difficult for bidders to understand how their proposals will be assessed, potentially impacting perceived fairness.

No evaluation criteria specified
Praktičnost65/100

The tender utilizes e-procurement, which is a positive aspect. However, the specific mention of 'e-submission' is not explicitly confirmed in the provided data, and the 'document URL' is not detailed. Financing information is not provided, and while contract duration is stated, the start date is not.

No explicit confirmation of e-submission mechanism
Document URL not detailed
Konzistentnost podataka90/100

Key fields such as title, reference, organization, and deadlines are populated. The tender status is active, and there are no reported disputes or suspensions, indicating good data consistency.

Održivost50/100

While the tender mentions an 'innovative' system, there are no explicit criteria related to green procurement, social aspects, or specific innovation drivers beyond the technical description. The 'EU Funded' characteristic is noted but doesn't automatically imply sustainability focus.

No explicit green procurement criteria
No explicit social criteria

Prednosti

Clear technical requirements and scope
Open e-procurement procedure
Availability of key tender documents (technical specs, contract draft)
Well-defined CPV code and EU funding indication

Nedostaci

Estimated value not disclosed
Lack of specified evaluation criteria
Limited information on practical submission details (e-submission confirmation, document URL)
Absence of explicit sustainability or social criteria

Preporuke

1. Disclose the estimated financial value of the tender.
2. Publish clear evaluation criteria to ensure transparency and fairness.
3. Provide specific details on the e-submission process and direct document URLs.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan