Pump Track

Otvoreno
Rok
ostalo 2 dana
April 06, 2026
Detalji ugovora
Kategorija
Open Procedure
Referenca
024919-2026
Vrednost
£200,000
Lokacija
North East England, Ujedinjeno Kraljevstvo
Objavljeno
Mart 27, 2026
Organizacija
CPV šifra
Vremenski okvir projekta

Objavljen tender

Mart 19, 2026

Rok za pitanja

Mart 30, 2026

Rok za podnošenje ponuda

April 06, 2026

Datum početka ugovora

Avgust 31, 2026

Informacije o naručiocuPRO
🔒
Otključajte informacije o naručiocu
Pogledajte obrasce potrošnje, preferirane procedure i još mnogo toga.
Nadogradite na Profesionalni paket →
Budžet
£200,000
Trajanje
5 meseci
Lokacija
North East England
Tip
Open Procedure
75
Rezultat kvaliteta/100
Dobro

Originalni opis tendera

Cilj projekta: Dizajnirati i izgraditi trajan, zajednici fokusiran pump track pogodan za širok spektar korisnika i nivoa veština. Obim radova: Angažovani izvođač će biti odgovoran za kompletan dizajn i instalaciju pump track-a, uključujući procenu lokacije, konceptualni i detaljni dizajn, pripremu terena, zemljane radove, drenažu, podlogu, isporuku materijala, opreme i radne snage, upravljanje projektom, usklađenost sa zdravljem i bezbednošću, izgradnju, osiguranje kvaliteta, sanaciju lokacije i dokumentaciju za primopredaju. Izvođači moraju osigurati da dizajni odražavaju najbolju praksu u pogledu trajnosti, bezbednosti, pristupačnosti i dugoročne efikasnosti održavanja. Preporučeni dizajn: Izvođači se podstiču da uključe preporučeni dizajn. Sadržaj predaje dizajna: Predlozi treba da sadrže konceptualne vizuale, rasporede, crteže, opise karakteristika, predviđene grupe korisnika, razmatranja pristupačnosti, specifikacije materijala, pristup drenaži, razmatranja bezbednosti i zahteve za održavanje. Zahtevi za cenu: Predaje moraju uključivati potpunu razradu troškova, identifikaciju opcionalnih dodataka, naknade za dizajn, procenjene troškove održavanja i potvrdu o važnosti cena.

Analiza rizika

Analiza rizika još uvek nije dostupna za tendere u ovoj zemlji. Trenutno podržano: Estonija, Poljska, Litvanija i Letonija.

Strategija za pobedu

Dobijte AI strategiju za pobedu prilagođenu ovom tenderu. Uključuje ocenu verovatnoće pobede, ključne prilike i izazove, preporučene oblasti fokusa za ponudu, uvide u konkurentsko pozicioniranje i konkretne preporuke za maksimiziranje vaših šansi.

Prijavite se

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

24 zahteva u 5 kategorija

Predaja (4)
Obavezno (1)
Usklađenost (2)
Tehnički (12)
Finansijski (5)
SUBMISSION REQUIREMENTS4
--Submissions must include a recommended design proposal.
--Submissions must include detailed pricing as specified.
--Designs must reflect best practice in pump track construction, durability, safety, accessibility, and long-term maintenance efficiency.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS2
--Contractors must be capable of undertaking the full design and installation of a pump track.
--Contractors must ensure designs reflect best practice in pump track construction, durability, safety, accessibility, and long-term maintenance efficiency.
TECHNICAL CAPABILITY REQUIREMENTS12
--Site assessment and feasibility considerations.
--Concept design and detailed technical design.
--Ground preparation, earthworks, drainage, and surfacing.
FINANCIAL REQUIREMENTS5
--Full cost breakdown for design and installation for each price point.
--Identification of optional extras and exclusions.
--Design fees clearly separated where applicable.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

Dobijte AI-generisane sažetke svih tenderskih dokumenata. Brzo razumejte šta svaki dokument sadrži bez čitanja stotina stranica — uključujući obim, uslove, kriterijume evaluacije i ključne obaveze.

Prijavite se
75
Dobro

Rezultat kvaliteta tendera

This tender for a pump track is generally well-structured with clear scope and requirements, but lacks explicit evaluation criteria and details on e-submission, impacting practicality. Sustainability aspects are not explicitly addressed.

Pregled rezultata

Zakonska usklađenost75/100

The tender appears to comply with basic legal requirements for an open competition below the threshold. The CPV code is appropriate, and there are no immediate indicators of disputes or regulatory non-compliance. Deadlines are present, though the submission deadline might be considered tight given the scope. The absence of a reveal date is a minor procedural oversight.

Missing reveal date
Jasnoća80/100

The description of the project aim and scope of works is comprehensive, detailing the expected responsibilities and deliverables. Requirements for design proposals and pricing are clearly outlined, promoting a good understanding of what is expected from bidders.

Potpunost70/100

Most essential information is present, including estimated value, contract duration, and start date. However, the lack of available tender documents with content limits the assessment of completeness regarding detailed specifications and forms.

No document content available
Pravičnost85/100

The tender is an open competition, which promotes fairness. Requirements are generally objective and focused on technical capability and design quality. There are no apparent tailored requirements favouring specific companies. The value is disclosed, and the process is described as open competition.

Praktičnost65/100

The tender specifies an e-submission requirement, which is positive. However, the lack of explicit information on the e-procurement platform or specific document URLs makes it less practical. The contract start date is provided, and financing information is implied through the estimated value, but not explicitly detailed.

No e-submission details provided (platform, URL)
Financing information could be more explicit
Konzistentnost podataka90/100

Key fields such as title, reference, organization, estimated value, and dates are populated logically. There are no reported disputes or suspensions, and the dates provided (submission deadline, contract start) are consistent with the project timeline.

Održivost50/100

The tender does not explicitly mention any green procurement, social aspects, or innovation requirements. While durability and long-term maintenance efficiency are mentioned, these are primarily functional rather than sustainability-focused. The tender is not indicated as EU funded.

No explicit green procurement criteria
No explicit social criteria

Prednosti

Clear project scope and detailed technical requirements
Open competition procedure
Disclosure of estimated value and contract duration
Appropriate CPV code provided

Nedostaci

Missing evaluation criteria
Lack of content in tender documents
Limited explicit sustainability considerations
Potential for a tight submission deadline

Preporuke

1. Specify evaluation criteria clearly.
2. Provide access to full tender documents with detailed specifications.
3. Incorporate explicit sustainability and innovation objectives.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan