Skip to main content
Želite da licitirate na javnim nabavkama? Pogledajte našu uslugu pripreme tendera TaaS
Tenderi

Izgradnja pratećih objekata za lokalni punkt selektivnog prikupljanja otpada u mestu Horzelov, opština Mielec.

Otvoreno
Rok
ostalo 5 dana
April 10, 2026
Detalji ugovora
Kategorija
Građevinarstvo
Referenca
2026/BZP 00173603/01
Vrednost
Nije otkriveno
Lokacija
Podkarpackie, Poljska
Objavljeno
Mart 28, 2026
Organizacija
CPV šifra
Vremenski okvir projekta

Objavljen tender

Mart 26, 2026

Rok za pitanja

April 03, 2026

Rok za podnošenje ponuda

April 10, 2026

Verovatnoća pobedePRO
🔒
Nadogradite na Professional
Pogledajte svoju procenjenu verovatnoću pobede na osnovu istorijskih podataka.
Nadogradite na Profesionalni paket →
Informacije o naručiocuPRO
🔒
Otključajte informacije o naručiocu
Pogledajte obrasce potrošnje, preferirane procedure i još mnogo toga.
Nadogradite na Profesionalni paket →
Uvid u sektorPRO
🔒
Otključajte uvide u sektor
Pogledajte prosečne pobedničke cene, nivoe konkurencije i tržišne trendove.
Nadogradite na Profesionalni paket →
Budžet
Nije otkriveno
Trajanje
Nije navedeno
Lokacija
Podkarpackie
Tip
Građevinarstvo
75
Rezultat kvaliteta/100
Dobro
Uporedna analiza tržišta
Prosečna pobednička cena
€12,641,706
Prosečan broj ponuda
0.1
Konkurencija
Niska
Pobednici iz redova MSP
86%
133,693 analiziranih tendera

Originalni opis tendera

Izgradnja pratećih objekata za lokalni punkt selektivnog prikupljanja otpada u mestu Horzelov, opština Mielec.

Pokreni analizu rizika

Identifikujte potencijalne rizike, neusklađenosti i upozorenja u svim tenderskim dokumentima. Dobijte detaljan izveštaj o rizicima sa nivoima ozbiljnosti i preporukama za ublažavanje.

Prijavite se

Strategija za pobedu

AI analiza zahteva, prilika i izazova ovog tendera. Dobijte strateške uvide za povećanje verovatnoće pobede.

65%
Procenjena verovatnoća pobedeUmereno podudaranje

This tender focuses on the construction of essential infrastructure for a municipal waste selective collection point. A winning bid will emphasize proven construction expertise, efficient project delivery, and a cost-effective approach aligned with the cost-plus remuneration model. Proactive engagement with the contracting authority and a clear understanding of local context are crucial.

Ključne poruke za pobedu

Reliable and Efficient Delivery of Essential Municipal Infrastructure

Cost-Effective Construction with Transparent Cost-Plus Management

Proven Expertise in Public Works and Waste Management Facilities

Ključne prilike
Lack of specified evaluation criteria presents an opportunity to shape the perception of value through a well-articulated bid, focusing on technical excellence and cost control.
The cost-plus remuneration model allows for a focus on efficient resource management and transparent cost tracking, which can be highlighted as a strength.
The absence of explicit green or social value requirements means that demonstrating these aspects proactively can serve as a significant differentiator, even if not formally scored.
The tender is for a specific municipality (Gmina Mielec) in a defined region (NUTS: PL824), allowing for tailored bids that demonstrate local understanding and commitment.
Ključni izazovi
The absence of specified evaluation criteria makes it difficult to precisely tailor the bid to maximize scoring. The focus must be on meeting all mandatory requirements exceptionally well and presenting a compelling overall value proposition.

Develop a comprehensive bid that addresses all technical requirements with high quality and detail. Emphasize the bidder's track record and commitment to project success. Proactively engage with the contracting authority (if permitted) to understand their priorities.

The lack of information on mandatory exclusion grounds, eligibility, financial requirements, and submission requirements necessitates a thorough review of the full tender documentation once available. Assumptions cannot be made.

Prioritize obtaining and meticulously reviewing all tender documents as soon as they are released. Allocate sufficient time for legal and compliance checks to ensure all requirements are met without ambiguity.

The cost-plus remuneration model, while offering flexibility, requires robust cost control and transparent reporting to maintain trust and avoid disputes. Inaccurate cost forecasting can lead to reduced profitability.

Implement rigorous cost tracking and reporting mechanisms. Develop a detailed cost breakdown and contingency plan. Ensure clear communication channels with the contracting authority regarding all cost-related decisions.

Profil idealnog ponuđača
A medium-sized construction company with a strong track record in municipal infrastructure projects, particularly those involving waste management facilities or similar public works. The ideal bidder possesses robust project management capabilities, a skilled workforce, and established relationships with reliable subcontractors. Experience with cost-plus contracts and a demonstrated understanding of local building codes and environmental regulations in the Podkarpackie region (NUTS: PL824) would be highly advantageous.
Ključni zahtevi
Construction of a warehouse building.
Construction of 6 storage sheds.
Construction of an office building.
Hardening of the maneuvering area.
Execution of rainwater drainage with discharge to a sealed tank.
Installation of monitoring system (4 cameras min. 4 Mpx, dedicated boxes, recorder, hard drive for at least 14 days of recordings, RACK cabinet, POE switch).
Contract settlement based on cost-plus remuneration, based on the bill of quantities.
Ključni diskriminatori
Demonstrated experience in constructing similar municipal infrastructure, particularly waste management facilities.
A clear and transparent approach to cost management and reporting under the cost-plus model.
Proactive inclusion of sustainability initiatives (e.g., waste reduction during construction, use of local materials) even if not explicitly required.
A strong understanding of local conditions and potential challenges in the Chorzelów/Gmina Mielec area.
Prilike za društvenu vrednost
Commit to employing local labor where possible during the construction phase, contributing to the local economy.
Implement a construction waste management plan that prioritizes recycling and diversion from landfill.
Offer a site visit and educational opportunity for local students or community groups to learn about waste management infrastructure.
Fokusne oblasti ponude
Technical Capability

Provide detailed evidence of past projects that mirror the scope of this tender, including specific examples of warehouse, shed, and office construction, as well as site hardening and utility connections. Highlight the quality of materials and construction methods. For the monitoring system, specify the exact equipment proposed and its compliance with the requirements, demonstrating technical understanding.

Cost Management (Cost-Plus)

Present a clear methodology for cost tracking, reporting, and value engineering. Emphasize transparency and collaboration with the contracting authority. Include a detailed bill of quantities with realistic costings and a well-defined process for managing variations and unforeseen costs.

Project Management

Outline a robust project management plan, including timelines, resource allocation, risk management, and quality control procedures. Demonstrate the ability to deliver the project on time and within budget, even with the cost-plus model.

Preporuke7
Thoroughly Analyze All Tender Documents
KritičnoSrednji napor

Obtain and meticulously review all tender documents as soon as they are released. Pay close attention to any annexes, appendices, or referenced documents that might contain details on exclusion grounds, eligibility, financial requirements, and submission procedures.

Ensures full compliance and avoids disqualification.
Proactively Define Value Proposition
VisokoSrednji napor

Since evaluation criteria are not specified, develop a compelling narrative that highlights technical excellence, cost-effectiveness, reliability, and a commitment to quality. Frame the bid around delivering a functional and durable facility that meets the municipality's needs.

Shapes the perception of value and influences the unstated evaluation process.
Emphasize Cost-Plus Expertise
VisokoSrednji napor

Clearly articulate the bidder's experience and methodology for managing cost-plus contracts. Highlight robust cost control, transparent reporting, and collaborative approaches to ensure value for money for the contracting authority.

Builds confidence in financial management and project execution.
Develop Detailed Technical Proposals
KritičnoVeliki napor

For each technical requirement (warehouse, sheds, office, hardening, drainage, monitoring), provide detailed specifications, material choices, and construction methodologies. Include drawings or sketches if appropriate. For the monitoring system, list specific model numbers and technical capabilities.

Demonstrates technical competence and understanding of the project scope.
Integrate Proactive Sustainability Commitments
SrednjeMali napor

Even though not explicitly required, include commitments to local employment, waste reduction during construction, and potentially the use of sustainable materials where feasible. Frame these as added value and responsible corporate citizenship.

Enhances the bid's appeal and aligns with broader public sector objectives.
Plan for Cost Control and Variation Management
VisokoSrednji napor

Develop a detailed cost breakdown and a clear process for managing variations and unforeseen costs within the cost-plus framework. This includes a robust change order procedure and regular cost reviews with the contracting authority.

Minimizes financial risk and ensures project profitability.
Demonstrate Local Knowledge
SrednjeMali napor

Incorporate references to the specific location (Chorzelów, Gmina Mielec) and demonstrate an understanding of local conditions, potential logistical challenges, and relevant regulations. This can be done in the project execution plan or company profile.

Shows commitment and reduces perceived risk for the contracting authority.
Konkurentsko pozicioniranje
Position the bid as the most reliable and cost-efficient solution for delivering essential municipal infrastructure, leveraging proven expertise in public works and transparent cost management.
Highlight the bidder's ability to execute all technical requirements to a high standard, with a particular focus on the critical elements like building construction, site hardening, and the monitoring system.
Differentiate by proactively demonstrating a commitment to responsible construction practices and community benefit, even in the absence of explicit social value requirements.

Konkurenti

Nadogradite da biste videli koje kompanije će se verovatno nadmetati na ovom tenderu, na osnovu istorijskih podataka o javnim nabavkama.

Prijavite se

Zahtevi i kvalifikacije

15 zahteva u 5 kategorija

Predaja (1)
Obavezno (1)
Usklađenost (1)
Tehnički (11)
Finansijski (1)
SUBMISSION REQUIREMENTS1
--No information in the text.
MANDATORY EXCLUSION GROUNDS1
--No information in the text.
ELIGIBILITY REQUIREMENTS1
--No information in the text.
TECHNICAL CAPABILITY REQUIREMENTS11
--Construction of a warehouse building.
--Construction of 6 storage sheds.
--Construction of an office building.
FINANCIAL REQUIREMENTS1
--No information in the text.

Pregled zahteva

Registrujte se da biste videli potpune zahteve i analizu

Dokumenti

2 dokumenata dostupno sa AI sažecima

Notice PDFPDF
08de8b36-7aba-f788-5fad-950001e713a3.pdf

This document is a tender notice for the construction of facilities for a Municipal Selective Waste Collection Point in Chorzelów, Gmina Mielec, Poland.

SZCZEGα¥OWE SPECYFIKACJE TECHNICZNE WYKONANIA I ODBIORU ROBαT BUDOWLANYCH.docDOC
SZCZEGα¥OWE SPECYFIKACJE TECHNICZNE WYKONANIA... -- 348.5 KB

No content extracted

Pregled dokumenata

Registrujte se da biste videli sažetke i analizu dokumenata

75
Dobro

Rezultat kvaliteta tendera

This tender for the construction of waste collection point facilities is generally well-structured, with comprehensive technical documentation. However, it lacks transparency regarding financial details and evaluation criteria, and the submission process could be more streamlined.

Pregled rezultata

Zakonska usklađenost75/100

The tender adheres to general legal requirements with a clear CPV code and active status. The deadline, while potentially short, is specified. The absence of disputes and suspensions contributes positively. However, the lack of disclosed evaluation criteria is a significant omission.

Missing evaluation criteria specified
Jasnoća80/100

The description of the required construction works is detailed, supported by numerous technical documents and project specifications. The AI-extracted requirements clearly outline the technical scope. The conditions for contract settlement are also defined.

Potpunost70/100

Most basic information is present, including the title, organization, and a clear description of works. A substantial number of relevant documents are attached. However, crucial financial information (estimated value) is not disclosed, and contract duration is missing.

Estimated Value not disclosed
Missing contract duration
Pravičnost85/100

The tender is conducted via e-procurement, promoting accessibility. The detailed technical specifications and bills of quantities suggest objective criteria for the work itself. However, the lack of disclosed evaluation criteria and the undisclosed estimated value could be perceived as a lack of full transparency.

Value not disclosed
Missing evaluation criteria
Praktičnost65/100

The tender utilizes e-procurement, which is a positive aspect. However, the AI-extracted requirements do not explicitly confirm e-submission, and there is no information regarding contract start date or financing details, impacting the overall practicality for potential bidders.

No e-submission explicitly confirmed
Missing contract start date
Konzistentnost podataka90/100

Key fields such as title, reference number, organization, and deadline are populated. The CPV code is present, and the status is active. There are no reported disputes or suspensions, and the dates appear logical within the context of the tender.

Održivost50/100

The tender focuses on construction and waste management infrastructure. There is no explicit mention of green procurement criteria, social aspects, or innovation. The funding source (EU funded) is not specified, limiting the assessment of sustainability integration.

No explicit green procurement criteria
No explicit social criteria

Prednosti

Comprehensive technical documentation and project details
Clear description of construction works
Use of e-procurement
Detailed bills of quantities provided

Nedostaci

Estimated value not disclosed
Missing evaluation criteria
Lack of information on contract duration and start date
Limited sustainability considerations

Preporuke

1. Disclose the estimated value of the contract to enhance transparency.
2. Clearly outline the evaluation criteria for submitted bids.
3. Provide information on the contract start date and duration.

Pregled AI ocene

Registrujte se da biste videli potpune zahteve i analizu

Potpuna analiza ocene kvaliteta
Detaljan pregled pod-ocena
Uvidi u prednosti i zabrinutosti
Strateške preporuke

Nije potrebna kreditna kartica • Podešavanje za 2 minuta

Nova usluga

Želite da prepustite nama ovaj tender?

Naši stručnjaci za javne nabavke pripremaju sve. Dokazano efikasno — Vi pregledate, odobrite i predate.

~1hVaše vreme
80%+80%+
$0Unapred
Pogledajte punu uporednu analizu
Bez TaaS-aSa TaaS-om
40-80 sati
Vreme pripreme
~1 sat
Vaše vreme
15-25%
Prosečan procenat uspešnosti
80%+
Procenat uspešnosti
Rizik od grešaka
Ručna provera
Stručna kontrola kvaliteta
Provera usaglašenosti
Sve radite Vi
Kompletna obrada
Sve radimo mi
Kompletna usluga
Dobijmo ovaj tender
Platite samo kada pobedite · Preko 400 kompanija nam veruje
Ili uradite sami

Dodaj u plan