Ønsker du å legge inn bud på offentlige anbud? Se vår TaaS-tjeneste for anbudsklargjøring
Anbud

Energetik Primær Varmekretsutvidgelser Del 2 (PSDS)

Åpen
Frist
16 dager igjen
august 06, 2026
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
056359-2026
Verdi
£11,400,000
Sted
Outer London - East and North East, Storbritannia
Publisert
juli 13, 2026
CPV-kode
Prosjektets tidslinje

Anbud publisert

juni 15, 2026

Frist for spørsmål

juli 30, 2026

Frist for innlevering

august 06, 2026

Kontraktens startdato

september 21, 2026

Budsjett
£11,400,000
Varighet
19 måneder
Sted
Outer London - East and North East
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

This Tender Notice supersedes previously published Tender Notice under reference 2026/S 000-025310 due to change in the procurement timetable and programme delivery. Energetik is seeking to extend its Meridian Water Heat Network (MWHN) in two separate parts, known as the northern extension and western extension. Energetik will appoint a Contractor to design and build the pipe network. The western extension is from Church Street near Edmonton Green to Winchmore School and Edmonton County (Bury Campus) School. The northern extension is from Ponders End High Street near Ponders End Park to Capital College and Waverley School. The contract is a district heating pipe installation of approximately 2.9km trench length of DN200 Series 3 pipe and 0.5km trench length of DN150 Series 3 pipe, all installed with at least 800mm cover to the crown of the pipe. The majority of the pipe has been purchased by the Employer from Logstor and is being stored at Logstor, Denmark. Works include being responsible for calling off the delivery of the pipe from Logstor, purchasing all joints and associated materials from Logstor, and installing the pipe predominantly in roads or cycle paths. The pre-construction work for the contract is due to commence upon contract award on or before 22nd September 2026. As well normal pre-construction work required under the contract, further GPR work, design and trial holes will be permitted as part of preconstruction. Construction work is expected to commence on or before 5th January 2027 following a successful planning application by the Employer, and subject to the Contractor agreeing S50 licences with Enfield Highways. As the project is grant funded and the grant will be lost if the contract spend does not achieve certain minimum thresholds each financial year, the contract has a sectional completion date of 31st March 2027 and Practical Completion by 31st March 2028. At least £1.5m of contract cost must be achieved by 31st March 2027, the sectional completion date. Completion of contract works must be delivered by 31st March 2028. Note that liquidated damages are £20,000 per day if these dates are not achieved. Key to the success of the project is the liaison with Enfield Highways team and to develop a route design and traffic management proposals that permit the granting of Section 50 licences for the works. Note that Section 50 licence fees, deposits and bonds will be paid by the Employer to Enfield Highways. Full road closures are highly unlikely to be permitted, and multiple gangs will only be permitted where it does not cause undue traffic chaos to commuter sand businesses on Enfield’s roads. The Contractor will be invited to meet Enfield Highways during the tender period. The contract includes extending the existing Logstor leak detection system, cleaning the pipe installed, hydraulically testing the pipe installed using treated water to the same standard as the existing MWHN and commissioning of the extensions to provide “heat on” to the extended network. The duration of the Contract is expected to be 18 months without option to extend due to completion of contract works must be delivered by 31st March 2028.

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
056359-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
056359-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
056359-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn

Legg til i pipeline