Ønsker du å legge inn bud på offentlige anbud? Se vår TaaS-tjeneste for anbudsklargjøring
Anbud

For levering av mobile anlegg RRC-er

Lukket

Fristen for innlevering er utløpt

Fristen for innlevering av dette anbudet er utløpt og aksepterer ikke lenger søknader. Informasjonen nedenfor beholdes for referanseformål.

Se aktive anbud
Frist
Utløpt
25. juli 2026
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
061019-2026
Verdi
£900,000
Sted
London, Storbritannia
Publisert
31. juli 2026
Organisasjon
CPV-kode
Prosjektets tidslinje

Anbud publisert

30. juni 2026

Frist for spørsmål

18. juli 2026

Frist for innlevering

25. juli 2026

Kontraktens startdato

30. september 2026

KjøperinnsiktPRO
🔒
Lås opp kjøperinnsikt
Se forbruksmønstre, foretrukne prosedyrer og mer.
Oppgrader til Professional →
Budsjett
£900,000
Varighet
37 måneder
Sted
London
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

Lot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. To be fitted with long arms. To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). Lot 2 Maintenance includes: - Servicing - Electrical upgrades - Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. - Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability - Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract Lot 3 Maintenance includes: - Tyres - Tail blades - There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. - All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) -

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
061019-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
061019-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
061019-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn

Legg til i pipeline