Language
Trenger du hjelp fra en anbudsekspert? Se vår anbudsforberedelsestjeneste
Anbud

Depoter Pakke B – Doncaster West, Doncaster Belmont, Tyne Yard ES4-5

Lukket

Fristen for innlevering er utløpt

Fristen for innlevering av dette anbudet er utløpt og aksepterer ikke lenger søknader. Informasjonen nedenfor beholdes for referanseformål.

Se aktive anbud
Frist
Utløpt
3. august 2026
Kontraktsdetaljer
Kategori
Open Procedure
Referanse
068417-2026
Verdi
£1,000,000
Sted
United Kingdom, Storbritannia
Publisert
13. august 2026
CPV-kode
Prosjektets tidslinje

Anbud publisert

20. juli 2026

Frist for spørsmål

27. juli 2026

Frist for innlevering

3. august 2026

Kontraktens startdato

6. september 2026

KjøperinnsiktPRO
🔒
Lås opp kjøperinnsikt
Se forbruksmønstre, foretrukne prosedyrer og mer.
Oppgrader til Professional →
Budsjett
£1,000,000
Varighet
10 måneder
Sted
United Kingdom
Type
Open Procedure

Opprinnelig anbudsbeskrivelse

The Depots and Stabling Project is the development of a strategy that is supported by necessary operational arrangements and any specific infrastructure interventions, to mitigate the impact that the railway access requirements of the wider TRU programme. As an established site, Doncaster West, was identified as a favourable location that could be mobilised quickly to support an uplift to stable trains and provide a legacy. An ES3 feasibility study is being developed which will be issued post contract award as the design is not mature enough at tender stage. Draft design shall be issued for the tenderers to use to inform their tender offer. TRU Engineering will provide engineering assurance. In summary the key deliverables are the ES4 design development of the option selected in the Option Selection Report and the ES5 Detailed Design provision: • Validate that the option selected in the OSR is feasible, using the draft design for pricing purposes only, (considering all disciplines and operations and maintenance requirements) and provide a report and drawings to support the following scope as per the iCRD which include, but not limited to the following:- o Reinstate siding No 6 to stable a 9 car AZUMA trainset including all ancillaries and stand back. o Reinstate points No 5041 and confirm that no further works are required to other point ends to access the siding. o Points 5042 shall be clipped normal to prevent access to siding No 5. This is to ensure adequate clearances are provided whilst the driver is performing their train inspection. o Provide 360-degree drivers walkway o Provide walkway lighting for the reinstated No 6 siding compliant to BS12464. o Provide a high level outline construction schedule. o Provide an assured ES 4-5 cost plan o PC appointed supplier to incorporate an ES6-8 Construction cost plan. o To explore opportunities in the programme to ensure EiS 4 months before December 2027. o Confirm that there or no OLE works required or define what works will be required to the OLE, including any earthing and bonding to meet the requirements of the i-CRD. o Confirmation that the existing method of working is valid for trains entering and leaving the depot and that the existing operational procedures will not need to be altered. This will require engagement with the depot operator, local operations manager and will be facilitated by the NR POIS and project team. The principal disciplines identified are Civil & Structural, Permanent Way, signalling (including ops and maintenance interface). The contractor is responsible for identifying and undertaking any additional surveys they deem necessary acting as Principal Designer. The design shall be deemed to include permanent and temporary works associated with all necessary railway disciplines. All required designs, temporary works and disciplines are to comply with Network Rail Standards for submission and follow the prescribed engineering and construction methods to meet Network Rail Standards. Engineering assurance, to validate the designs will follow those prescribed by NWR standards and TRU Engineering will be the assurance body for the design.

Risikoanalyse

Risikoanalyse er ikke tilgjengelig for dette landets anbud ennå. Støttes for øyeblikket: Estland, Latvia, Litauen, Polen, Frankrike, Storbritannia, Danmark, Nederland, Norge og Finland.

Vinnstrategi

Få en AI-drevet vinnerstrategi skreddersydd for dette anbudet. Inkluderer sannsynlighetsscore for å vinne, viktige muligheter og utfordringer, anbefalte fokusområder for tilbudet, innsikt i konkurranseposisjonering og handlingsrettede anbefalinger for å maksimere sjansene dine.

Logg inn

Konkurrenter

Oppgrader for å se hvilke selskaper som sannsynligvis vil legge inn tilbud på dette anbudet, basert på historiske anskaffelsesdata.

Logg inn

Krav og kvalifikasjoner

AI trekker ut og organiserer alle krav fra anbudsunderlagene – obligatoriske kvalifikasjoner, tekniske spesifikasjoner, finansielle betingelser og innleveringsregler – tydelig kategorisert slik at du vet nøyaktig hva som kreves for å gi et tilbud.

Logg inn

Grunnleggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgjengelig med AI-sammendrag

OCDS RecordDOC
068417-2026_ocds_record.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
OCDS Release PackageDOC
068417-2026_ocds_release.json

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis
Official PDF VersionPDF
068417-2026_official.pdf

Ingen sammendrag tilgjengelig for dette dokumentet.

Vis

Forhåndsvisning av dokumenter

Registrer deg for å se dokumentoppsummeringer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse av dette anbudet som vurderer juridisk samsvar, klarhet, fullstendighet, rettferdighet, praktisk gjennomførbarhet, datakonsistens og bærekraft på en skala fra 0-100 med detaljert oversikt og anbefalinger.

Logg inn

Legg til i pipeline