This mandatory low-voltage grid-connection project in Rapla requires bidders to (1) complete Elektrilevi’s price-table template, (2) have an A-licensed or EQF-level-6 electrical works manager, a switching-authorised 0.22-20 kV operator, and a C-responsible person all pre-registered in Elektrilevi’s EPP portal before bid opening, and (3) finish works by 6 Feb 2026—so only qualified electrical contractors already admitted to Elektrilevi’s partner system should bid.
Elektrilevi OÜ seeks a contractor (tender open, no price ceiling stated) who must – as a mandatory qualification – prove at least three similar low-voltage electrical-installation contracts in the last 60 months, including one ≥ €40k (ex-VAT), to deliver the Rapla TN 50a grid-connection works by 6 Feb 2026; bid if you meet this past-performance threshold and can execute the supplied-meter install within the given schedule.
This Elektrilevi OÜ tender for a low-voltage grid connection at Rapla, Tallinna mnt 50a (completion mandatory by 06.02.2026) will be awarded 100% on lowest total price (excluding VAT) for the complete works package, with Elektrilevi supplying the meter and transport of its materials—so only contractors able to price competitively and deliver on time need apply.
Elektrilevi OÜ seeks a contractor who must (mandatory) have no criminal/tax/fraud exclusions and can prove technical competence by showing at least three low-voltage electrical-installation contracts completed in the last 5 years (≥1 over €50k), making this suitable only for established, compliant electrical builders able to finish the Rapla connection by 6 Feb 2026.
Elektrilevi OÜ requires a contractor to build a low-voltage connection (LC3190) at Tallinna mnt 50a, Rapla by 06.02.2026—mandatory compliance with the full project, on-site inspection before bidding, land-owner notifications/coordination, clearance of the cable corridor, geodetic as-built survey, extensive photo documentation (P346/P399), use of S1 locks and steel (rd10) earthing, 11 m class-3 poles, Transport Board permits for road works and linnud-pesad permits for nest removal, with all late claims rejected and any crop/utility/road damage compensated by the contractor.
Reģistrējieties, lai skatītu dokumentu kopsavilkumus un analīzi
Kvalitātes analīze šim iepirkumam tiek apstrādāta. Lūdzu, pārbaudiet vēlāk.
Sveicināti! Es esmu jūsu AI asistents šim iepirkumam. Es varu palīdzēt jums saprast prasības, termiņus, atbilstības kritērijus un sniegt stratēģiskus ieskatus.
Nav nepieciešama kredītkarte