Vajadzīga iepirkumu eksperta palīdzība? Skati mūsu iepirkumu sagatavošanas pakalpojumu
Atpakaļ uz iepirkumiem

OLE uzraudzība 730. klasei

Atvērts
Termiņš
21 dienas atlikušas
2026. gada 30. oktobrī
Līguma detaļas
Kategorija
Cits
Atsauce
093967-2026
Vērtība
Nav izpausts
Atrašanās vieta
North East England, Apvienotā Karaliste
Publicēts
2026. gada 1. oktobrī
Organizācija
CPV kods
Projekta laika skala

Iepirkums publicēts

2026. gada 5. oktobrī

Termiņš jautājumiem

2026. gada 23. oktobrī

Iesniegšanas termiņš

2026. gada 30. oktobrī

Līguma sākuma datums

2027. gada 1. janvārī

Budžets
Nav izpausts
Ilgums
60 mēneši
Atrašanās vieta
North East England
Tips
Cits

Oriģinālais iepirkuma apraksts

General Information & Purpose of Engagement WM Trains Ltd is undertaking this Preliminary Market Engagement (PME) in accordance with the Procurement Act 2023 to engage the market regarding the supply and deployment of Overhead Line Equipment (OLE) Remote Condition Monitoring (RCM) systems across its Class 730/0 fleet. WM Trains currently operates eight OLE monitoring systems fitted to its Class 350 fleet, delivered via Transmission Dynamics and funded through an asset owner initiative with Angel. This legacy deployment relies on an established, proprietary front-end user interface and database accessed collaboratively by WM Trains, Network Rail, and fleet maintainers to safeguard infrastructure and maintain operational continuity. To enhance the coverage of its electrified routes, WM Trains requires an additional six monitoring systems for the Class 730/0 fleet. WM Trains considers that procuring an alternative, non-integrated solution would create fragmented operational dashboards, split data streams, and cause disproportionate technical difficulties in maintenance and real-time operations. Consequently, the core purpose of this PME is to directly test the market to establish whether any economic operator can realistically deliver the required functionality and integrate seamlessly with the existing proprietary setup without introducing disproportionate technical and operational difficulties. If the market engagement confirms that no compatible alternative can achieve this integration, WM Trains intends to formalise a direct award pursuant to Schedule 5, Paragraph 7 of the Procurement Act 2023 (Section 41 - Direct award in special cases: Additional or repeat goods, services or works). Key Scope Overview & Technical Constraints The planned requirement is strictly for the supply of OLE remote camera monitoring (RCM) and wireless accelerometer hardware, alongside the ongoing SaaS analytics subscription and the necessary engineering/design documentation. The physical installation and fitment to the Class 730/0 fleet will be undertaken separately by the fleet maintainer/OEM acting as the asset design authority. To satisfy operational, safety, and regulatory requirements, any proposed system must meet the following mandatory criteria: 1. Database & System Integration: All data generated by the Class 730 OLE systems must integrate fully and directly into the existing Class 350 OLE monitoring database. 2. Unified Front-End User Interface: The solution must provide a single, common front-end interface that aligns RCM imagery and sensor analytics to deliver real-time combined analytics throughout train operation, avoiding fragmented software suites. 3. Autonomous Defect Detection: The RCM system must autonomously identify and report dynamic OLE conditions, degradation, and infrastructure defects to designated stakeholders, with specific capability to identify and report on faulty dropper wires. 4. 5G Data Transmission: The solution must enable remote collection, processing, high-speed transfer, and review of dynamic OLE monitoring data utilising 5G capability. 5. Camera & Environmental Resilience: The camera system must be self-cleaning to prevent data and evidence loss, include a proven method for low-light conditions, and require no regular roof access for maintenance. 6. Physical & Systems Vehicle Integration: Roof-mounted equipment must be designed specifically for the Class 730 profile while strictly minimising physical and electrical integration into the host train network. 7. Rolling Stock Safety & Standards: The installation must fully comply with all relevant rolling stock standards and legislation, and must not adversely affect vehicle safety, reliability, maintainability, gauging, fire performance, EMC compatibility, or passenger service operations. 8. Engineering Deliverables & Approvals: The supplier must deliver all design, installation, commissioning, acceptance, and handover documentation required by the Infrastructure Manager (Network Rail), the TOC (WM Trains), the Fleet Maintainer (e.g. Siemens), and the ROSCO. 9. Maintenance & Calibration: The supplier must provide clear, documented maintenance, calibration, and ongoing technical support requirements for the installed system. 10. Data Ownership & Governance: All operational, diagnostic, and raw condition data generated across the fleet must be jointly and unreservedly owned by WM Trains Ltd and Network Rail, with unrestricted sharing rights for designated maintainers. Scope Clarification: For the avoidance of doubt, this procurement relates strictly to OLE condition monitoring interoperability and ingestion into the established OLE analytics database. WM Trains is not seeking multi-system train integration and will not review proposals detailing the ingestion of unrelated rolling stock subsystems (such as onboard CCTV, PIS, or general telematics) into an OLE platform.

Risku analīze

Riska analīze vēl nav pieejama šīs valsts iepirkumiem. Pašlaik atbalstīti: Igaunija, Latvija, Lietuva, Polija, Francija, Apvienotā Karaliste, Dānija, Nīderlande, Norvēģija un Somija.

Uzvaras stratēģija

Saņemiet AI izstrādātu uzvarēšanas stratēģiju, kas pielāgota šim iepirkumam. Ietver uzvaras varbūtības vērtējumu, galvenās iespējas un izaicinājumus, ieteicamās piedāvājuma fokusa jomas, konkurences pozicionēšanas ieskatus un praktiskus ieteikumus.

Pieteikties

Konkurenti

Jauniniet, lai redzētu, kuri uzņēmumi, visticamāk, iesniegs piedāvājumu šim iepirkumam, pamatojoties uz vēsturiskajiem iepirkumu datiem.

Pieteikties

Prasības un kvalifikācijas

AI izvelk un sakārto visas prasības no iepirkuma dokumentiem — obligātās kvalifikācijas, tehniskās specifikācijas, finanšu nosacījumus un iesniegšanas noteikumus — skaidri kategorizētus, lai zinātu, kas nepieciešams piedāvājuma iesniegšanai.

Pieteikties

Pamata prasības

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenti

3 dokumenti pieejami ar AI kopsavilkumiem

OCDS RecordDOC
093967-2026_ocds_record.json

Šim dokumentam nav pieejams kopsavilkums.

OCDS Release PackageDOC
093967-2026_ocds_release.json

Šim dokumentam nav pieejams kopsavilkums.

Official PDF VersionPDF
093967-2026_official.pdf

Šim dokumentam nav pieejams kopsavilkums.

Dokumentu priekšskatījums

Reģistrējieties, lai skatītu dokumentu kopsavilkumus un analīzi

Kvalitātes rādītājs

Visaptveroša šī iepirkuma kvalitātes analīze, vērtējot juridisko atbilstību, skaidrību, pilnīgumu, godīgumu, praktiskumu, datu konsekvenci un ilgtspējību skalā no 0 līdz 100 ar detalizētu sadalījumu un ieteikumiem.

Pieteikties