Atpakaļ uz iepirkumiem

NEC3 Clyde Bridge Replacement Project

Slēgts

Iesniegšanas termiņš ir beidzies

Šī iepirkuma iesniegšanas termiņš ir beidzies un pieteikumi vairs netiek pieņemti. Zemāk esošā informācija ir saglabāta uzziņai.

Pārlūkot aktīvos iepirkumus
Termiņš
Beidzies
Novembris 10, 2022
Līguma detaļas
Kategorija
Cits
Atsauce
032215-2022
Vērtība
£7,352,308
Atrašanās vieta
North West England, Apvienotā Karaliste
Publicēts
Februāris 23, 2026
CPV kods
Projekta laika skala

Iepirkums publicēts

Novembris 14, 2022

Termiņš jautājumiem

Novembris 03, 2022

Iesniegšanas termiņš

Novembris 10, 2022

Budžets
£7,352,308
Ilgums
Nav norādīts
Atrašanās vieta
North West England
Tips
Cits

Oriģinālais iepirkuma apraksts

South Lanarkshire Council are proceeding with the construction of a 90-metre single span proprietary steel bridge to replace the existing reinforced concrete bridge structure, subject to the Council acquiring the land required for the project as set out below. The proposed structure includes a 4.2m wide carriageway with an additional footway of minimum width 1.05m. The new structure will be constructed off-line of the existing bridge. The proposed carriageway on approach to the structure will follow a new alignment and will include new approach roads to the north and south which will tie into the existing C29 Pettinain Road. The proprietary bridge will be supported on reinforced concrete abutments which, in turn, will be supported by piled foundations. On the north approach the structure will also include wing walls which will not be connected to the abutment and will behave as retaining walls. On the south approach the structure will include wing walls which will not be connected to the abutment and will behave as retaining walls and a cattle creep structure. The superstructure is proposed to be launched from the south abutment and a launching area for this purpose will be built. In addition to this the design also includes for the replacement of a cattle creep structure located approximately 350m south of Clyde Bridge and the infilling of a culvert located approximately 270m south of Clyde Bridge.

Risku analīze

Lūdzu, piesakieties, lai izmantotu risku analīzi.

Pieteikties

Uzvaras stratēģija

Lūdzu, piesakieties, lai piekļūtu uzvaras stratēģijas ieteikumiem.

Pieteikties

Konkurenti

Jauniniet, lai redzētu, kuri uzņēmumi, visticamāk, iesniegs piedāvājumu šim iepirkumam, pamatojoties uz vēsturiskajiem iepirkumu datiem.

Pieteikties

Prasības un kvalifikācijas

AI prasību analīze šim iepirkumam vēl nav pieejama.

Prasības tiks ģenerētas automātiski, kad tiks apstrādāti iepirkuma dokumenti.


Pamata prasības

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenti

Šim iepirkumam nav pieejami apstrādāti dokumenti.

Dokumenti parādīsies šeit, tiklīdz tie tiks lejupielādēti un analizēti.

Analīze gaida

Kvalitātes analīze šim iepirkumam tiek apstrādāta. Lūdzu, pārbaudiet vēlāk.

Pievienot pārvaldībai