Prisijunkite, kad galėtumėte naudoti laimėjimo strategijos rekomendacijas.
PrisijungtiAtnaujinkite, kad matytumėte, kurios įmonės greičiausiai pateiks pasiūlymą šiam konkursui, remiantis istoriniais viešųjų pirkimų duomenimis.
Prisijungti20 reikalavimų 5 kategorijose
Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę
Yra 13 dokumentų su AI santraukomis
This document specifies the qualification and exclusion criteria for first-tier subcontractors, focusing on criminal convictions and trustworthiness.
This document outlines mandatory compliance conditions for bidders and their subcontractors, covering EU sanctions, power of attorney for joint bids, and grounds for subcontractor exclusion.
This document is a tender cost form, containing a list of work volumes and cost breakdowns that bidders must complete for the water and sewage pipeline reconstruction and stormwater pipeline construction project.
Tender document 'Hindamiskriteeriumid ja hinnatavad näitajad' in .PDF format (2,949 bytes).
This document is an explanatory European Single Procurement Document (ESPD) detailing the contracting authority's qualification conditions and exclusion grounds that bidders must complete electronically.
This document is a subcontractor's confirmation that they do not have any grounds for exclusion from the public procurement procedure as stipulated in Section 95 (1) points 1-5 of the Public Procurement Act.
This technical description outlines the objective, scope, and execution conditions, including traffic management requirements, for the reconstruction of water and sewage pipelines and the construction of stormwater pipelines in Sõle street, Kolde avenue, and Auna street.
This document outlines AS Tallinna Vesi's occupational health, safety, and environmental requirements that contractors must adhere to on repair and construction sites, including submitting a risk analysis and work safety plan before commencing work.
This document is a template for a contractual penalty act, detailing various breaches and their corresponding penalty amounts to be applied to the contractor during the execution of the contract.
Tender document 'Lisad 4, 6 ja 7' in .XLSX format (28,454 bytes).
This document is a third-party (e.g., subcontractor) consent form allowing the tenderer to rely on its economic, financial, technical, and professional capabilities to meet tender qualification requirements, while also confirming responsibility for contract execution.
This document is a draft contract for the reconstruction and construction of water, sewage, and stormwater pipelines in Sõle, Kolde, and Auna streets, outlining the terms, appendices, and general conditions for the awarded contractor.
Tender document 'Ühispakkujate volikiri' in .DOCX format (64,128 bytes).
Prisiregistruokite, kad peržiūrėtumėte dokumentų santraukas ir analizę
This tender is well-documented and structured, demonstrating good clarity and completeness. However, a significant contradiction regarding the classification of the estimated value severely impacts its fairness and data consistency.
The tender appears to be legally compliant, featuring reasonable submission deadlines, appropriate CPV codes, and no detected disputes. The use of ESPD and EU funding suggests adherence to relevant regulations.
The project description is clear, and requirements are well-structured and referenced through specific documents. Evaluation criteria are indicated, and performance conditions refer to contract clauses, contributing to good clarity.
All essential information, including basic details, financial data, timeline, and location, is provided. A comprehensive set of 14 documents supports the tender, ensuring high completeness.
While e-procurement is enabled and requirements seem generic, the tender explicitly states 'Value Classified: Yes' despite providing an 'Estimated Value: 5,500,000.00 EUR'. This contradiction creates ambiguity and significantly undermines transparency and fairness.
Electronic submission is supported, and the contract start date is known. Financing information refers to contract clauses. However, the explicit contract duration is not stated in the basic information, which is a minor practical oversight.
Key fields are populated, and dates are logical. However, the direct contradiction between the disclosed estimated value and its classification status ('Value Classified: Yes') represents a significant data inconsistency.
The tender is characterized as 'Green Procurement' and is 'EU Funded', which are positive aspects. However, it explicitly lacks social criteria and innovation focus, limiting its overall sustainability scope.
Prisiregistruokite, kad peržiūrėtumėte visus reikalavimus ir analizę
Nereikia kreditinės kortelės • Sąranka per 2 minutes
Sveiki! Aš esu jūsų AI asistentas, skirtas šiam konkursui. Galiu padėti jums suprasti reikalavimus, terminus, tinkamumo kriterijus ir pateikti strateginių įžvalgų.
Nereikia kreditinės kortelės