Retour aux appels d'offres

Conception, construction et installation de sculptures à Market Street, Holyhead

Ouvert
Date limite
26 jours restants
Mars 30, 2026
Détails du contrat
Catégorie
Autre
Référence
018497-2026
Valeur
£60,000
Lieu
United Kingdom, Royaume-Uni
Publié
Février 24, 2026
Code CPV
Calendrier du projet

Publication de l'appel d'offres

Mars 02, 2026

Date limite pour les questions

Mars 23, 2026

Date limite de soumission

Mars 30, 2026

Date de début du contrat

Avril 19, 2026

Budget
£60,000
Durée
10 mois
Lieu
United Kingdom
Type
Autre
75
Score de qualité/100
Bon

Description originale de l'appel d'offres

Le Conseil du comté de l'île d'Anglesey recherche une société de conseil compétente pour concevoir, construire et installer 4 sculptures en acier Corten dans le cadre d'améliorations plus larges du site Crown, Market Street, Holyhead. Le site est situé sur le terrain de l'ancien 89-97 Market Street, Holyhead, est une propriété vacante à l'entrée de Market Street et adjacente à Victoria Road, en face du Cénotaphe. Les locaux existants sont destinés à la démolition d'ici juillet 2026, étant vacants depuis 2016 et précédemment utilisés comme club d'anciens combattants / Pocket Bar. L'objectif de ce travail est de concevoir, construire et installer quatre (4) sculptures en acier Corten qui feront partie d'un jardin commémoratif. Les sculptures doivent refléter les liens maritimes et militaires du passé de Holyhead. Un élément du jardin devra être plus général et contribuer à une réflexion tranquille.

Analyse des risques

Veuillez vous connecter pour utiliser l'analyse des risques.

Se connecter

Stratégie gagnante

Connectez-vous pour accéder aux recommandations de stratégie gagnante.

Se connecter

Concurrents

Passez à un plan supérieur pour voir quelles entreprises sont susceptibles de soumissionner pour cet appel d'offres, basé sur les données historiques.

Se connecter

Exigences et qualifications

9 exigences dans 5 catégories

Soumission (1)
Obligatoire (1)
Conformité (1)
Technique (5)
Financier (1)
SUBMISSION REQUIREMENTS1
--No specific submission requirements are detailed in the provided text.
MANDATORY EXCLUSION GROUNDS1
--No specific mandatory exclusion grounds are detailed in the provided text.
ELIGIBILITY REQUIREMENTS1
--Must be a competent consultancy.
TECHNICAL CAPABILITY REQUIREMENTS5
--Ability to design Corten steel sculptures.
--Ability to build Corten steel sculptures.
--Ability to install Corten steel sculptures.
FINANCIAL REQUIREMENTS1
--No specific financial requirements are detailed in the provided text.

Aperçu des exigences

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Documents

Aucun document traité n'est disponible pour cet appel d'offres.

Les documents apparaîtront ici une fois qu'ils auront été téléchargés et analysés.

75
Bon

Score de qualité de l'appel d'offres

This tender presents a clear objective for designing, building, and installing sculptures, with a well-defined theme, but lacks detailed submission instructions and evaluation criteria.

Répartition du score

Conformité légale75/100

The tender adheres to basic legal requirements, including a CPV code and a stated procedure. Deadlines appear reasonable for the scope, though the contract start date is very close to the submission deadline. No disputes or immediate regulatory red flags are apparent from the provided text. The 'Below threshold - open competition' procedure suggests adherence to relevant procurement regulations for its value.

Clarté80/100

The description of the project, including the purpose, location, and desired themes of the sculptures (maritime and military links, quiet reflection), is generally clear. The requirements for technical capability are also explicitly stated. However, the lack of specified evaluation criteria and detailed submission requirements leaves some ambiguity.

Missing evaluation criteria
Exhaustivité70/100

Most basic information such as title, reference, organization, estimated value, contract duration, and CPV code is present. However, crucial elements like detailed submission requirements and specific financial requirements for bidders are missing. The AI-extracted requirements are broad, and the tender documents themselves are not accessible for deeper review.

No document content available
Missing financial requirements for bidders
Équité85/100

The tender is open competition, suggesting a fair process. The estimated value is disclosed. The requirements for competence and the nature of the sculptures are objective and tied to the project's purpose, rather than favoring specific companies. However, the lack of accessible documents and explicit evaluation criteria can hinder transparency.

No document content available
Aspect pratique65/100

The tender specifies an estimated value, contract duration, and a contract start date. However, the lack of information on e-submission methods and the accessibility of tender documents limit practical execution. Financing information is not provided.

No e-submission specified
No document content available
Cohérence des données90/100

Key fields like title, reference, organization, value, and deadlines are populated. There are no stated disputes or suspensions. The dates provided are logical in sequence, although the proximity of the contract start to the submission deadline is noted.

Durabilité50/100

There is no explicit mention of green procurement, social aspects, or innovation within the tender description. It is not indicated as EU-funded, which typically mandates certain sustainability considerations. The focus is purely on the artistic and functional aspects of the sculptures.

Not green procurement
No social criteria

Points forts

Clear project description and thematic focus
Open competition procedure
Disclosure of estimated value
Provided CPV code

Préoccupations

Lack of accessible tender documents
Missing detailed submission requirements
Absence of explicit evaluation criteria
No sustainability or innovation considerations

Recommandations

1. Provide full access to all tender documentation.
2. Clearly outline submission procedures and expected document formats.
3. Specify the evaluation criteria and weighting.

Aperçu de la notation IA

Inscrivez-vous pour consulter les exigences et l'analyse complètes

Analyse complète du score de qualité
Répartition détaillée des sous-scores
Aperçu des forces et des préoccupations
Recommandations stratégiques

Aucune carte de crédit requise • Configuration en 2 minutes

Ajouter au Pipeline