Tagasi hangete juurde

Residential Development - Former Western Secondary School and Playing Field Site, Grimsby

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
Juuni 16, 2023
Lepingu üksikasjad
Kategooria
Muu
Viide
019428-2023
Väärtus
£45,000,000
Asukoht
East Yorkshire and Northern Lincolnshire, Ühendkuningriik
Avaldatud
Veebruar 24, 2026
CPV kood
Projekti ajakava

Hange avaldatud

Juuli 07, 2023

Küsimuste tähtaeg

Juuni 09, 2023

Esitamise tähtaeg

Juuni 16, 2023

Eelarve
£45,000,000
Kestus
Pole määratud
Asukoht
East Yorkshire and Northern Lincolnshire
Tüüp
Muu

Algne hanke kirjeldus

North East Lincolnshire Council (the Council) has an exciting housing development opportunity at the former Western Secondary School and Playing Field Site on Cambridge Road, Grimsby. The site is located 2.3 km (1.4 miles) south west of Grimsby town centre and in close proximity to a wide range of local facilities and public transport, including Grimsby Town Train Station. This is a highly prominent development freehold site extending to, 22.9 acres (9.3 hectares) and benefits from hybrid planning permission for up to 297 dwellings. The Council have secured funding from the Accelerated Construction Fund via Homes England to de-risk the site through the delivery of spine roads, utilities and main access points. There are no existing buildings at the site and infrastructure works to deliver the key spine roads were completed in October 2021. The site gained hybrid planning consent in April 2021 (Planning Ref: DM/0975/20/FUL) for: • Full planning permission for site access and roads within the site; and, • Outline planning permission for up to 297 residential units and a 90 bed extra care facility and the associated infrastructure and landscaping with means of access and landscaping to be considered. The Council also require a total of 50 units to be provided for retirement use (over 55's). The site is subject to Homes England Grant Funding Conditions, to include; delivery at pace, use of Modern Methods of Construction (MMC), and delivery through a build lease/contractual agreement All questions and clarifications must be submitted via https://yortender.eu-supply.com/ All responses must be submitted via https://yortender.eu-supply.com/

Riskianalüüs

Riskianalüüsi kasutamiseks palun logige sisse.

Logi sisse

Võidustrateegia

Võidustrateegia soovituste kasutamiseks logige sisse.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

AI nõuete analüüs pole veel selle hanke jaoks saadaval.

Nõuded genereeritakse automaatselt, kui hankedokumendid on töödeldud.


Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

Selle hanke jaoks pole töödeldud dokumente saadaval.

Dokumendid ilmuvad siia, kui need on alla laaditud ja analüüsitud.

Analüüs pooleli

Selle hanke kvaliteedianalüüsi töödeldakse. Palun kontrollige varsti uuesti.

Lisa halduspaneelile