Vajad hankeeksperdi abi? Vaata meie hangete ettevalmistuse teenust
Tagasi hangete juurde

EICR contract – 2026 - 2028 - Durham Aged Mineworkers' Homes Association

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
4. märts 2026
Lepingu üksikasjad
Kategooria
Restricted Procedure
Viide
019417-2026
Väärtus
Ei avaldata
Asukoht
Tees Valley and Durham, Ühendkuningriik
Avaldatud
20. august 2026
CPV kood
Projekti ajakava

Hange avaldatud

4. märts 2026

Küsimuste tähtaeg

25. veebruar 2026

Esitamise tähtaeg

4. märts 2026

Lepingu alguskuupäev

1. aprill 2026

Eelarve
Ei avaldata
Kestus
23 kuud
Asukoht
Tees Valley and Durham
Tüüp
Restricted Procedure

Algne hanke kirjeldus

EICR testing - 1 Purpose and Scope 1.1 This electrical periodic inspection and testing protocol document serves as a comprehensive guide for service providers involved in the inspection and testing of domestic electrical systems. Designed to ensure the ongoing safety and functionality of electrical installations, this document outlines standardised procedures, process methodologies, and the client’s minimum compliance requirements. The protocol emphasises the importance of adherence to regulatory standards and industry best practice, promoting a proactive stance on risk mitigation within electrical systems. This concise yet thorough document serves as an invaluable resource for service providers and engineers engaged in the crucial task of maintaining the integrity and reliability of electrical systems through regular inspection and testing. 1.2 This electrical periodic inspection and testing protocol document has been prepared to outline the technical requirements and parameters for the intended application. It is crucial to note that this document serves solely as a specification guide and does not constitute a comprehensive electrical design. Users are reminded that the details provided herein are intended for informational purposes only. 1.3 Where applicable, in the context of electrical design, it is imperative to emphasize the significance of aligning the design process with the regulations set out in BS 7671, also known as the IET Wiring Regulations. BS 7671 serves as a crucial framework for electrical installations and is designed to ensure the safety, integrity, and reliability of electrical systems. In no event shall reliance solely upon this specification document replace the need for comprehensive electrical design, analysis, and consultation where required. Service providers shall assume full responsibility for any electrical design and implementation conducted based on the information contained herein. 1.4 Where applicable, all electrical design work must be carried out by competent individuals who possess a comprehensive understanding of BS 7671. It should be acknowledged that failure to adhere to BS 7671 could compromise the safety of the electrical installation and result in non-compliance with legal and regulatory requirements. 1.5 The requirements of any other relevant legislation, including the Building Regulations 2010, British Standards (e.g., BS 5839 Part 6), Codes of Practice, industry guidance, and manufacturer instructions, will also need to be considered throughout the design process, where applicable. 1.6 As part of any procurement process, this specification must be read in conjunction with all drawings and specifications, as no claim for lack of knowledge after the submission will be accepted. Any ambiguity must be clarified during the procurement process permitted timeframes. In the event of any discrepancy discovered after submission, the service provider is deemed to have included within their submission any alternative that provides compliance as determined by the client. 1.7 The service provider shall be deemed to be the service provider appointed to carry out the work covered by the specification, whether employed as the primary service provider or as a sub-contractor instructed by the primary service provider.

Riskianalüüs

Riskianalüüs pole veel selle riigi hangete jaoks saadaval. Praegu toetatud: Eesti, Läti, Leedu, Poola, Prantsusmaa, Ühendkuningriik, Taani, Holland, Norra ja Soome.

Võidustrateegia

Saate tehisintellektil põhineva võidustrateegia, mis on kohandatud sellele hankele. Sisaldab võidutõenäosuse skoori, peamisi võimalusi ja väljakutseid, soovituslikke pakkumise fookusalasid, konkurentsipositsioonide ülevaadet ja tegevussoovitusi.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

Tehisintellekt eraldab ja korrastab kõik nõuded hankedokumentidest — kohustuslikud kvalifikatsiooninõuded, tehnilised spetsifikatsioonid, finantstingimused ja esitamise reeglid — selgelt kategoriseerituna.

Logi sisse

Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

3 dokumenti saadaval koos AI kokkuvõtetega

OCDS RecordDOC
019417-2026_ocds_record.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

OCDS Release PackageDOC
019417-2026_ocds_release.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Official PDF VersionPDF
019417-2026_official.pdf

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Dokumentide eelvaade

Registreeru, et näha dokumentide kokkuvõtteid ja analüüsi

Kvaliteediskoor

Selle hanke põhjalik kvaliteedianalüüs, mis hindab õiguslikku vastavust, selgust, täielikkust, õiglust, praktilisust, andmete järjepidevust ja jätkusuutlikkust skaalal 0–100 koos üksikasjaliku jaotuse ja soovitustega.

Logi sisse

Lisa halduspaneelile