Tagasi hangete juurde

Southern Water Clean Water Network Optimisation

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
Oktoober 17, 2022
Lepingu üksikasjad
Kategooria
Muu
Viide
030693-2022
Väärtus
£2,500,000
Asukoht
London, Ühendkuningriik
Avaldatud
Veebruar 24, 2026
CPV kood
Projekti ajakava

Hange avaldatud

Oktoober 31, 2022

Küsimuste tähtaeg

Oktoober 10, 2022

Esitamise tähtaeg

Oktoober 17, 2022

Eelarve
£2,500,000
Kestus
Pole määratud
Asukoht
London
Tüüp
Muu

Algne hanke kirjeldus

The Clean Water directorate of Southern Water faces mounting pressure to improve performance in relation to a number of operational measures, most notably leakage. Projects commissioned as part of the Clean Water Network Optimisation programme must deliver significant identifiable benefits in both the current year (22/23 – Year 3 of AMP7) that can be consolidated for the remainder of AMP7. TIn the EP22 annual leakage target we expect to report reduction in leakage for 10 to 15 Ml/d from Year 2 Year 3. As Year 3 is the baseline year for AMP8 funding, it is critically important for Southern Water to meet this target. Some groundwork for delivering these benefits has been completed through Phase 1 of the Advanced Pressure Management project, mains replacement schemes, enhanced find and fix effort, and three projects undertaken by our incumbent partners. Southern Water seeks to identify the best partner to take forward the next tranches of Clean Water Network Optimisation projects to continue to deliver benefits. The benefits of the next tranche of Clean Water Optimisation projects are expected to be found in a number of areas such as: Consolidated View of Leakage Operations Smart Meter Data Integration & Continuous Flow Alarms Performance of Leak Detection pinpointing Trunk Main Burst Mitigation and Prevention Data Validation and Consolidation of Reporting within Live Dashboard Environment The new partner will be expected to provide: • Demonstrable history of working with water companies and applying established and innovative approaches to challenges in the industry • Combined experience in operational roles in water companies and consultancy experience providing advisory and implementation services • Breadth to devise and implement technological as well as process, organisational and cultural solutions • Ability to mobilise – at pace – a team with the capacity to deliver the scale of change needed to achieve our targets for AMP7 Year 3 and beyond • Value for money in the proposed commercial arrangements, including rate card.
Roheline hange

Riskianalüüs

Riskianalüüsi kasutamiseks palun logige sisse.

Logi sisse

Võidustrateegia

Võidustrateegia soovituste kasutamiseks logige sisse.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

AI nõuete analüüs pole veel selle hanke jaoks saadaval.

Nõuded genereeritakse automaatselt, kui hankedokumendid on töödeldud.


Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

Selle hanke jaoks pole töödeldud dokumente saadaval.

Dokumendid ilmuvad siia, kui need on alla laaditud ja analüüsitud.

Analüüs pooleli

Selle hanke kvaliteedianalüüsi töödeldakse. Palun kontrollige varsti uuesti.

Lisa halduspaneelile