Vajad hankeeksperdi abi? Vaata meie hangete ettevalmistuse teenust
Tagasi hangete juurde

Ladude pakett B – Doncaster West, Doncaster Belmont, Tyne Yard ES4-5

Suletud

Esitamise tähtaeg on möödunud

Selle hanke esitamise tähtaeg on möödunud ja taotlusi vastu ei võeta. Allolev teave on säilitatud viitamiseks.

Sirvi aktiivseid hankeid
Tähtaeg
Aegunud
3. august 2026
Lepingu üksikasjad
Kategooria
Open Procedure
Viide
068417-2026
Väärtus
£1,000,000
Asukoht
United Kingdom, Ühendkuningriik
Avaldatud
13. august 2026
CPV kood
Projekti ajakava

Hange avaldatud

20. juuli 2026

Küsimuste tähtaeg

27. juuli 2026

Esitamise tähtaeg

3. august 2026

Lepingu alguskuupäev

6. september 2026

Ostja analüütikaPRO
🔒
Avage ostja analüütika
Vaadake kulutusmustreid, eelistatud menetlusi ja palju muud.
Uuenda Professionaalseks →
Eelarve
£1,000,000
Kestus
10 kuud
Asukoht
United Kingdom
Tüüp
Open Procedure

Algne hanke kirjeldus

The Depots and Stabling Project is the development of a strategy that is supported by necessary operational arrangements and any specific infrastructure interventions, to mitigate the impact that the railway access requirements of the wider TRU programme. As an established site, Doncaster West, was identified as a favourable location that could be mobilised quickly to support an uplift to stable trains and provide a legacy. An ES3 feasibility study is being developed which will be issued post contract award as the design is not mature enough at tender stage. Draft design shall be issued for the tenderers to use to inform their tender offer. TRU Engineering will provide engineering assurance. In summary the key deliverables are the ES4 design development of the option selected in the Option Selection Report and the ES5 Detailed Design provision: • Validate that the option selected in the OSR is feasible, using the draft design for pricing purposes only, (considering all disciplines and operations and maintenance requirements) and provide a report and drawings to support the following scope as per the iCRD which include, but not limited to the following:- o Reinstate siding No 6 to stable a 9 car AZUMA trainset including all ancillaries and stand back. o Reinstate points No 5041 and confirm that no further works are required to other point ends to access the siding. o Points 5042 shall be clipped normal to prevent access to siding No 5. This is to ensure adequate clearances are provided whilst the driver is performing their train inspection. o Provide 360-degree drivers walkway o Provide walkway lighting for the reinstated No 6 siding compliant to BS12464. o Provide a high level outline construction schedule. o Provide an assured ES 4-5 cost plan o PC appointed supplier to incorporate an ES6-8 Construction cost plan. o To explore opportunities in the programme to ensure EiS 4 months before December 2027. o Confirm that there or no OLE works required or define what works will be required to the OLE, including any earthing and bonding to meet the requirements of the i-CRD. o Confirmation that the existing method of working is valid for trains entering and leaving the depot and that the existing operational procedures will not need to be altered. This will require engagement with the depot operator, local operations manager and will be facilitated by the NR POIS and project team. The principal disciplines identified are Civil & Structural, Permanent Way, signalling (including ops and maintenance interface). The contractor is responsible for identifying and undertaking any additional surveys they deem necessary acting as Principal Designer. The design shall be deemed to include permanent and temporary works associated with all necessary railway disciplines. All required designs, temporary works and disciplines are to comply with Network Rail Standards for submission and follow the prescribed engineering and construction methods to meet Network Rail Standards. Engineering assurance, to validate the designs will follow those prescribed by NWR standards and TRU Engineering will be the assurance body for the design.

Riskianalüüs

Riskianalüüs pole veel selle riigi hangete jaoks saadaval. Praegu toetatud: Eesti, Läti, Leedu, Poola, Prantsusmaa, Ühendkuningriik, Taani, Holland, Norra ja Soome.

Võidustrateegia

Saate tehisintellektil põhineva võidustrateegia, mis on kohandatud sellele hankele. Sisaldab võidutõenäosuse skoori, peamisi võimalusi ja väljakutseid, soovituslikke pakkumise fookusalasid, konkurentsipositsioonide ülevaadet ja tegevussoovitusi.

Logi sisse

Konkurendid

Uuendage, et näha, millised ettevõtted tõenäoliselt sellele hankele pakkumise esitavad, tuginedes ajaloolistele hankeandmetele.

Logi sisse

Nõuded ja kvalifikatsioonid

Tehisintellekt eraldab ja korrastab kõik nõuded hankedokumentidest — kohustuslikud kvalifikatsiooninõuded, tehnilised spetsifikatsioonid, finantstingimused ja esitamise reeglid — selgelt kategoriseerituna.

Logi sisse

Põhinõuded

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumendid

3 dokumenti saadaval koos AI kokkuvõtetega

OCDS RecordDOC
068417-2026_ocds_record.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

OCDS Release PackageDOC
068417-2026_ocds_release.json

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Official PDF VersionPDF
068417-2026_official.pdf

Selle dokumendi jaoks pole kokkuvõtet saadaval.

Dokumentide eelvaade

Registreeru, et näha dokumentide kokkuvõtteid ja analüüsi

Kvaliteediskoor

Selle hanke põhjalik kvaliteedianalüüs, mis hindab õiguslikku vastavust, selgust, täielikkust, õiglust, praktilisust, andmete järjepidevust ja jätkusuutlikkust skaalal 0–100 koos üksikasjaliku jaotuse ja soovitustega.

Logi sisse

Lisa halduspaneelile