Brug for hjælp fra en udbudsekspert? Se vores udbudsforberedelsestjeneste
Udbud

ISO11 Fumigationslobby Udskiftningsprojekt – Anlægsarbejder og CDM Hovedprojekterings-/Hovedentreprenørrolle

Lukket

Fristen for indsendelse er overskredet

Fristen for indsendelse af dette udbud er overskredet, og der modtages ikke længere ansøgninger. Oplysningerne nedenfor er gemt til referenceformål.

Gennemse aktive udbud
Frist
Udløbet
23. september 2026
Kontrakt detaljer
Kategori
Open Procedure
Reference
074969-2026
Værdi
£185,000
Lokation
Surrey, East and West Sussex, Storbritannien
Udgivet
21. september 2026
CPV-kode
Projekttidslinje

Udbud offentliggjort

6. august 2026

Frist for spørgsmål

16. september 2026

Frist for tilbud

23. september 2026

Kontraktens startdato

6. november 2026

OrdregiverindsigtPRO
🔒
Lås op for ordregiverindsigt
Se forbrugsmønstre, foretrukne procedurer og mere.
Opgrader til Professionel →
Budget
£185,000
Varighed
11 måneder
Lokation
Surrey, East and West Sussex
Type
Open Procedure

Original udbudsbeskrivelse

This opportunity (“Contract”) is for a single supplier to provide: 1. Civil Works and CDM Principal Designer/Principal Contractor Role for the ISO11 Fumigation Lobby Replacement Project. 2. Conversion of Structural Engineer’s drawings to Construction Drawings. 3. Liaison with Local Authority to ensure compliance with Building Control. This will include providing drawings and information as required by the Local Authority and hosting them during site visits. Fees for Building Control will be paid for by The Pirbright Institute. 4. Construction of a Temporary Biocontainment Wall which will allow the area to be externalised from ISO11 to enable construction works to take place. The wall shall provide a bioseal between the working area and the contained area. Suppliers must allow for works carried out close to this wall to be carried out with care and attention to prevent damage to the wall. 5. Strip out of existing fumigation chamber and autoclave. 6. Remove door between G48 & G44 (ISO8), brick up and render. 7. Remove the external door in G62, brick up and render. 8. Create opening into G49/G62 area after temporary containment barrier is in place. 9. Create new loading area in G49 / G62 area. This will include making good the floors, walls and ceiling to the same standards as ISO11 to maintain sealability. Remove and make good any raised door threshold so that there is smooth access to the fumigation lobby for pallet trucks. 10. Create space for new Fumigation Lobby and construct flooring inside Fumigation chamber to match with the flooring in ISO11 and ensure the threshold in and out of the fumigation lobby is flush to the floor so pallet trucks can access without any obstacles. 11. Remove current double doors in G51, brick up and render. 12. Create new opening to G51 and supply/install new double doors with SR4 security rating. 13. Create new unloading area in G51 with double door entry from the external hard standing (currently underneath the staircase). Walls and ceilings to be rendered and painted with wipeable paint for hygienic areas. Floor to be constructed to same standard as internal flooring to match that of the fumigation chamber to ensure unobstructed access to pallet trucks. 14. Remove and replace external staircase to allow forklift truck access to room G51 and maintain access to the first-floor plantroom. 15. Replace double doors to first floor plantroom and decorate. 16. The supplier is to make allowance to liaise with the fumigation lobby supplier to ensure they have the details to integrate the new fumigation lobby into the refurbished area. 17. The supplier shall allow for covered skip for metal and construction waste to be stored on site for 6 months quarantine before disposing off site. 18. The Pirbright Institute would also like to obtain an option cost to refurbish room G44, so that it can become part of ISO11. The supplier is to allow for upgrade the flooring to the same standard as ISO11 so that there is unobstructed access between G44 & G48 areas, walls and ceiling to be refurbished to ensure they maintain sealability. The works in 6 will apply to the door in G44 between G40 and G47 if this option is ordered. 19. The supplier is to provide CDM Principal Designer and Principal Contractor Role for the entire project. Details of this are shown in ITT Part 1 - Appendix 1 - Civil & CDM Scope of Works. 20. On completion, an O&M is to be submitted which provides details of works from design to completion. This shall include as built drawings and Building Control Completion Certificates.

Risikoanalyse

Risikoanalyse er endnu ikke tilgængelig for dette lands udbud. I øjeblikket understøttet: Estland, Letland, Litauen, Polen, Frankrig, Storbritannien, Danmark, Holland, Norge og Finland.

Vinderstrategi

Få en AI-drevet vinderstrategi skræddersyet til dette udbud. Inkluderer sandsynlighedsscore for at vinde, vigtige muligheder og udfordringer, anbefalede fokusområder for tilbuddet, indsigt i konkurrencepositionering og handlingsrettede anbefalinger for at maksimere dine chancer.

Log ind

Konkurrenter

Opgrader for at se, hvilke virksomheder der sandsynligvis vil afgive tilbud på dette udbud, baseret på historiske indkøbsdata.

Log ind

Krav og kvalifikationer

AI udtrækker og organiserer alle krav fra udbudsdokumenter — obligatoriske kvalifikationer, tekniske specifikationer, finansielle betingelser og indsendelsesregler — tydeligt kategoriseret, så du ved præcis, hvad der kræves for at byde.

Log ind

Grundlæggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgængelige med AI-resuméer

OCDS RecordDOC
074969-2026_ocds_record.json

Intet resumé tilgængeligt for dette dokument.

Vis
OCDS Release PackageDOC
074969-2026_ocds_release.json

Intet resumé tilgængeligt for dette dokument.

Vis
Official PDF VersionPDF
074969-2026_official.pdf

Intet resumé tilgængeligt for dette dokument.

Vis

Forhåndsvisning af Dokumenter

Tilmeld dig for at se dokumentresuméer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse af dette udbud, der scorer juridisk overholdelse, klarhed, fuldstændighed, retfærdighed, praktisk anvendelighed, datakonsistens og bæredygtighed på en skala fra 0-100 med detaljeret opdeling og anbefalinger.

Log ind