Brug for hjælp fra en udbudsekspert? Se vores udbudsforberedelsestjeneste
Udbud

Offentlige fortovsarbejder – Harris Park Udvidelse

Åben
Frist
22 dage tilbage
16. oktober 2026
Kontrakt detaljer
Kategori
Open Procedure
Reference
084883-2026
Værdi
£44,000
Lokation
North East England, Storbritannien
Udgivet
16. september 2026
CPV-kode
Projekttidslinje

Udbud offentliggjort

8. september 2026

Frist for spørgsmål

9. oktober 2026

Frist for tilbud

16. oktober 2026

Kontraktens startdato

1. februar 2027

Budget
£44,000
Varighed
1 måneder
Lokation
North East England
Type
Open Procedure

Original udbudsbeskrivelse

1.1 The Authority Cockermouth Town Council is inviting competitive tenders for minor civil works to improve a public footpath section. Engineering drawings and technical specifications were prepared on behalf of the Town Council by Cumberland Council. 1.2 Purpose of Work The objective is to establish an accessible, surfaced route from Double Mills footbridge to the woodland section behind Dale View, Cockermouth. Currently, this missing link prevents access for pushchairs, wheelchairs, and less-mobile pedestrians. 1.3 Key Project Details • Design & Standards: Formulated via engineering drawings provided by Cumberland Council. • Target Start Date: February / March 2027 (Spring 2027) or before. • Contract Duration: Estimated 2 consecutive weeks. 2.1 Scope of Works The contractor will provide all plant, labour, and materials to execute the following sequence: 1. Site Establishment: Set up a secure temporary compound near the park entrance at Dale View. 2. Safety Measures: Formally close Footpath No. 223015 to the public for the 2-week duration of works. (Cumberland Council has agreed to meet the costs of this) 3. Excavation: Dig out a ground tray 50mm deep along the path alignment. Retain topsoil and arisings on-site for reuse. 4. Membrane: Supply and lay a heavy-duty geotextile separation membrane along the length of construction. 5. Sub-Base: Supply, lay, and compact a 150mm depth of Type 1 granular sub-base. 6. Surface Course: Supply, lay, and compact a 40mm depth of 0-6mm crushed aggregate to form a smooth, accessible top finish. 7. Alignment Note: The path alignment must run to the right-hand side of the park bench and to the left-hand side of the trees. 8. Tie-ins: Saw cut the existing macadam path at chainage 0m near the Double Mills footbridge to ensure a flush finish. The end chainage must meet completely flush with the existing timber bridge deck. 9. Landscaping: Smooth out and reinstate path edges using the saved arisings and topsoil, then seed with an 80/20 wildflower mix. 2.2 Critical Site Constraints • Narrow Access: Access to the park area is via a restrictive, narrow road at Dale View. Large commercial HGVs or oversized plant will not physically fit. Bidders must check this access profile prior to pricing. • Watercourse Proximity: The works run directly alongside the River Cocker. • Environmental Protection: All materials and plant machinery must remain at least 5 metres away from the watercourse channel on ground with no immediate flooding risk. Absolutely no refuelling, servicing, or greasing is allowed on site. Equipment must be checked for leaks before entering the site. • Flood Risk Management: Works must be carried out in generally dry conditions. The contractor is required to monitor local water levels and Environment Agency flood alerts prior to and during construction to reduce risk to the workforce.

Risikoanalyse

Risikoanalyse er endnu ikke tilgængelig for dette lands udbud. I øjeblikket understøttet: Estland, Letland, Litauen, Polen, Frankrig, Storbritannien, Danmark, Holland, Norge og Finland.

Vinderstrategi

Få en AI-drevet vinderstrategi skræddersyet til dette udbud. Inkluderer sandsynlighedsscore for at vinde, vigtige muligheder og udfordringer, anbefalede fokusområder for tilbuddet, indsigt i konkurrencepositionering og handlingsrettede anbefalinger for at maksimere dine chancer.

Log ind

Konkurrenter

Opgrader for at se, hvilke virksomheder der sandsynligvis vil afgive tilbud på dette udbud, baseret på historiske indkøbsdata.

Log ind

Krav og kvalifikationer

AI udtrækker og organiserer alle krav fra udbudsdokumenter — obligatoriske kvalifikationer, tekniske specifikationer, finansielle betingelser og indsendelsesregler — tydeligt kategoriseret, så du ved præcis, hvad der kræves for at byde.

Log ind

Grundlæggende krav

  • Company registration in EU required
  • Proven track record in similar projects
  • Financial stability documentation

Dokumenter

3 dokumenter tilgængelige med AI-resuméer

OCDS RecordDOC
084883-2026_ocds_record.json

Intet resumé tilgængeligt for dette dokument.

Vis
OCDS Release PackageDOC
084883-2026_ocds_release.json

Intet resumé tilgængeligt for dette dokument.

Vis
Official PDF VersionPDF
084883-2026_official.pdf

Intet resumé tilgængeligt for dette dokument.

Vis

Forhåndsvisning af Dokumenter

Tilmeld dig for at se dokumentresuméer og analyser

Kvalitetsscore

Omfattende kvalitetsanalyse af dette udbud, der scorer juridisk overholdelse, klarhed, fuldstændighed, retfærdighed, praktisk anvendelighed, datakonsistens og bæredygtighed på en skala fra 0-100 med detaljeret opdeling og anbefalinger.

Log ind